IEEE aj Process Overview

Slides:



Advertisements
Similar presentations
July 2013 doc.: IEEE < > July 2014
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /1474r0 Submission Nov 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group November 2013 Closing Report.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
VHT SG Report to EC Date: Authors: November 2008 April 2007
China MM-Wave (CMMW) Study Group IEEE aj Sept Meeting Logistic
xxxx doc.: IEEE /xxxxr0 March 2017
China MM-Wave (CMMW) Study Group May 2012 Closing Report
IEEE TGw March Agenda Date: Authors: May 2008
TGax March 2017 Closing Report
TGad Process Overview Date: Authors: January 2009
IEEE aj Process Overview
TGac Documents and Timeline
IEEE aj Task Group May 2017 Agenda
P802.11s report to EC on request for approval to proceed to RevCom
Proposal for TGad Evaluation Methodology
TGad March 2010 Closing Report
TGad September 2010 Closing Report
Proposal for TGad Selection Procedure and Timeline
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
VHT SG September 2008 Closing Report
China MM-Wave (CMMW) Study Group - Introduction of CMMW PAR and 5C
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGad July 2009 Closing Report
TGaf Waikoloa Closing Report
802.11af Liaison Report Date: Authors: March 2011
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGad May 2010 Closing Report
TGs Montreal Closing Report
TGad September 2009 Closing Report
TGaf Geneva Closing Report
IEEE aj Process Overview
TGn Closing Report Vancouver, BC, Canada 802 Plenary
VHT SG July 2008 Closing Report
Backward Compatibility Feature for aj
TGad July 2010 Editor Report
TGad May 2009 Closing Report
802.11bd Timeline Date: Authors: January 2019
TGn Closing Report Los Angeles, CA, US 802 Interim
IEEE P Working Group for Wireless Personal Area Networks
Proposed Modifications to VHT60 PAR
TGaf Waikoloa Closing Report
Proposed Modifications to VHT60 PAR
IEEE aj Task Group Nov 2012 Closing Report
IEEE aj Task Group Nov 2012 Closing Report
China MM-Wave (CMMW) Study Group March 2012 Closing Report
TGad Editor Report Date: Authors: May 2011 April 2007
TGad Editor Report Date: Authors: July 2011 April 2007
VHT SG November 2008 Closing Report
TGad March 2011 Closing Report
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
Proposed Modifications to VHT60 PAR
September 2009 Closing Report
TGad May 2011 Closing Report
Timeline for the Light Communications TG
2019 March TGba Closing Report
TGn Editor Report Sept 2008 Date: Authors:
802.11be Timeline proposal Date: Authors: May 2019
VHT SG January 2009 Report Date: Authors: January 2009
TGad January 2009 Closing Report
Simulation Scenario Floor Plans
TGad Task Group Document Open Items
Proposal for TGad Evaluation Methodology
IEEE aj May Closing Report
TGbd Closing Report – Vietnam
Presentation transcript:

IEEE 802.11aj Process Overview April 2007 doc.: IEEE 802.11-07/0570r0 Sept 2012 IEEE 802.11aj Process Overview Date: 2012-09-26 Authors: Xiaoming Peng / I2R Eldad Perahia, Intel Corporation

Task Group Steps Begin Task Group Create Selection Procedure Sept 2012 Task Group Steps Begin Task Group Elect Officers Create Selection Procedure Develop TG documents Begin Selection Procedure Confirmation vote Initial Letter Ballot Comment Resolution Recirculation Ballot(s) Initial Sponsor Ballot Recirculation Sponsor Ballot(s) Xiaoming Peng / I2R

TG documents Sept 2012 Functional Requirements Evaluation Methodology PAR Additional quantitative constraints Evaluation Methodology Discuss usage models and then define limited set simulation scenarios for MAC simulations Define PHY simulations Channel Models 60GHz Reuse 60GHz channel model used for 11ad 45GHz Impulse responses Path loss Antenna Define model per simulation scenario environment Xiaoming Peng / I2R

Official Time Line for 802.11aj Sept 2012 Official Time Line for 802.11aj 08-2012: PAR approved 03-2014: WG Letter Ballot Initial 09-2014: WG Letter Ballot Recirculation 03-2015: Form Sponsor Ballot Pool 05-2015: MEC Done 07-2015: Sponsor Ballot Initial 03-2016: Sponsor Ballot Recirculation 06-2016: Final WG approval 09-2016: Final EC approval 10-2016: RevCom & Standards Board approval Xiaoming Peng / I2R