Brackish Water Desalination Project

Slides:



Advertisements
Similar presentations
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Advertisements

Exploring Regional Desalination as a Water Supply Option in the Bay Area The Who, What, When, Where, Why and How of Regional Water Supply Planning May.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
WATER BOND Mark Watton General Manager - Otay Water District Speakers: Moderator: Ken Weinberg Director Water Resources - San Diego County Water Authority.
Water System Planning Study
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
LAKESHASTA LAKEOROVILLE Bay-Delta STATE WATER PROJECT (2.0 MAF) LOS ANGELES AQUEDUCTS (0.5 MAF) COLORADO RIVER AQUEDUCT (1.25 MAF) METROPOLITAN WATER.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Western Delta Diversion Gary W. Darling Delta Stewardship Council September 22, 2011 Delta Diablo Sanitation District.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Proposition 1 Workshop: the Grant Application Process July 2015.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Changes to the 1995 Water Quality Control Plan Program of Implementation Presented by: Steve Ford Department of Water Resources.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
Planning Commission Study Session: Preferred Plan July 23, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Meeting #25 OCTOBER 6, Allred Beckman Burcham Derivi Dougherty Escobar Jones Ornelas Sanguinetti Self White 1. Roll Call.
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Richland Creek Water Supply Program Briefing
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Irvine Ranch Water District Distributed Energy Storage Case Study
Scoping Meeting April 20th 6:00 pm
PowerButte: Solar Overlay Replacement with PowerButte Guide
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
The Development Process
Recycled Water Project – Sharon Heights GCC
Water Reclamation Plant Feasibility Study Update May 28, 2014
Joshua Basin Water District Draft Findings & Rate Scenarios
Santa Ana River Conservation and Conjunctive Use Program Update
Department of Environmental Quality
Overview What is the CEQA environmental review process?
Water Reclamation Plant Feasibility Study Update
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
San Luis Obispo County Integrated Regional Water Management (IRWM) Region Regional Water Management Group (RWMG) Meeting SLO City/County Library Community.
Successfully Integrating NEPA and Environmental Permitting into a DoD Hazardous Waste Treatment Facility Construction Project to Meet Budget and Schedule.
Revolutionize USACE Civil Works
Delta Water Supply Project
Brackish Water Desalination Project Draft EIR
Final Environmental Impact Report
Richland Creek Water Supply Program Program Update
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
California Water Commission
Is the Bay Area Ready for Potable Reuse?
Carlsbad and Huntington Beach Seawater Desalination Facilities
Land Use Planning Community Workshop
Resource Management and Climate Protection Committee Meeting:
Sustainable Agricultural Lands Conservation Program
Presentation transcript:

Brackish Water Desalination Project 2/27/2019 Brackish Water Desalination Project Update to Antioch City Council December 12, 2017 Introduction Background Explain project Scheduling issues Critical council decisions – when will we be back toc Acceptance of grants or loans Certification EIR Select Delivery Mechanism Maps – where intake is relative to Delta Map – concept of addition to treatment plant – all the things that are happening One on pricing -here’s what you pay for water, here’s what this project could be at various capacity Future decisions Wrap up Schedule fo conncil deciions Overall schedule

Agenda Project Background and Objectives Project Overview Accomplishments to Date Funding Update Schedule Update Upcoming Council Decisions

City Water Supply The City of Antioch treats and distributes raw water from the San Joaquin River utilizing its pre-1914 water rights and purchases raw water from the Contra Costa Water District when salinity at its intake is too high.

Value of City’s Water Rights is Being Eroded Estimated Value of City Water Rights: $70-$100M Changes in Delta Water Management: WaterFix Cumulative Impacts of other projects degrading water quality in Western Delta CCWD Settlement on WaterFix Freeport Development in San Joaquin Valley, etc. Climate Change: Increasing Frequency of Droughts

Increasing Salinity in Western Delta Forces City to Stop Using the River Earlier in Year In typical non-drought years, 40% of the City’s supply comes from the San Joaquin River In drought years, the City must switch to CCWD supply earlier. As little as 25% of the City’s supply may come from the San Joaquin River

3 Years Ago the City Began Investigating Brackish Water Project Opportunities California in middle of 5yr drought City needed to find ways to mitigate for WaterFix Restore and maintain the value of the City’s water rights Protect water quality and water reliability against future droughts Provide flexibility for City’s needs and possible regional expansion Provide environmental and economic benefits

Brackish Water Desalination is Cost-Effective Tidal Delta water ~ 50 times less salty than seawater One third the cost of seawater desalination Current Cost of Antioch Finished Water $1000/AF (CCWD raw water charge + treatment costs) Estimated Water Cost Brackish Water Facility $920 to $1,150/AF San Joaquin River water which has chloride levels 50 times lower than ocean water. This water is called “brackish” and can be treated to useable levels at 1/3 of the cost of ocean water desalination.

Project Overview Treat 7.5MGD of brackish water to produce 6MGD finished water. Could be as much as 16MGD for a regional plant. New river intake with state-of-the-art fish screens (incorporates existing CIP project) Treatment facility at existing WTP site. Current plan is to discharge at DDSD existing outfall (Antioch owns 50% capacity). Negotiations underway.

Brackish Water Project makes cost-effective use of existing facilities

Environmental and Economic Benefits Improvements at the City’s intake would reduce its impact on the river. State-of-the-art fish screens and variable speed pumping provide net environmental fish benefits New pumps will allow operational flexibility/efficiency in the timing and rate at which water is diverted The more reliable a community’s water supply, the better the prospects for industrial and commercial growth (jobs)

Accomplishments to Date Received $1M in State financing for planning effort Preparing EIR Developing project concepts and budgets Evaluating alternative ways to deliver project Pursuing outside funding – State grants and loans Identifying potential regional partners

Funding Opportunities Total cost of environmental certification, design and construction of this project is estimated to be $60M Obtained: $1M low interest loan SWRCB State Revolving Fund program to cover the planning activities currently underway. Applied: $10M Prop 1 Brackish Water Grant (State limit for grants is $10M per project) Future Potential: Up to $50M in State low interest loans specifically available for the brackish water project Could title something like: There are significant opportunities for project funding On July 25, 2017, the City Council authorized the City Manager to submit an application to the California Department of Water Resources for grant funding up to $10,000,000 for the design and construction of the Brackish Water Desalination project from the Proposition 1 Water Desalination Grant Program.

Project Schedule Environmental Review Underway Public Scoping Period Aug-Sept 2017 Draft EIR under development EIR for Council consideration Summer 2018 Preliminary Planning and Design Ongoing Final Design and Permitting late 2018 Project Online late 2019/early 2020 depending on delivery method From AUGUST CIP UPDATE: A Notice of Preparation of an Environmental Impact Report for this project was circulated from August 15, 2017 to September 14, 2017. This document was sent to the State Clearinghouse, Responsible and Trustee Agencies and other interested parties, and provided information describing the project and its potential environmental effects. A public scoping meeting was held on September 5, 2017 to discuss the proposed project and receive comments concerning the scope of the Environmental Impact Report. Staff is currently developing a draft Environmental Impact Report that is scheduled to be considered by the City Council in May of 2018 and design activity is expected to commence shortly thereafter. Final design and permitting of the project are programmed to be completed in September of 2018. Construction is anticipated to begin in late 2018 and be completed in December of 2019.

Upcoming City Council Decisions Certify EIR Select Preferred Project Authorize acceptance of grants and loans from the state Approve, if any, regional partnership agreements Authorize proceeding with design and construction