NZTA Shared Pedestrian and Cycle Lantern Trial

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Meeting the Needs of All Pedestrians
Louisiana Safe Routes To School Program
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Unit 2 Learning the Basics
Harold Park Tram Sheds Development
By: Vanessa Victor Scott Yoshida Travis Hills Lucas Sprague.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Florida Department of Transportation, November 2009
Unit 2 Ch 2 Drive Right/Ch 7&8 Rules of the Road
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
Hawthorne & 16th Brian Marcum Chloe Ritter Collin Roughton.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
2015 Traffic Signals 101 Topic 7 Field Operations.
Chapter 2 Signs, Signals, and Roadway Markings
1 Section III Day 2 DMV Manual p. 5-6, Write a scenario about how the driver of the white truck managed to keep his truck on the edge of the.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
Dún Laoghaire Area Committee Meeting 8 th April 2015 Non Statutory Public Consultation Proposed Road Safety Improvement Works at Schools on Cross Avenue.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
 SIGN, SIGNALS, & ROADWAY MARKINGS Do Now - Create a list with as many different road signs you are able to think of. What does each sign tell you? Classify.
E MESE MAKÓ, PhD Associate professor Department of Transport Infrastructure Szechenyi Istvan University, Gyor, Hungary Evaluation of Human.
Traffic Signals & ITS to Encourage Walking & Cycling
Christchurch Transport Operations Centre SNUG 2015 This Presentation CTOC (Christchurch Transport Operations Centre) - Update Achievements from the last.
Wayne King | Senior Traffic Engineer – Hutt City Council Simon Prosee | Transport Engineer – GHD Puffin Pedestrian Crossings SNUG 2015.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Lesson Plan For Day Two Power point presentation 30 min Video– AAA- signs, signals, etc. 20 min Quiz- Signs Etc 10 min Correct 10 min H/O- Signs 10 min.
ITS Trials Remuera Rd In-Pavement Warning System.
1 Section III Day 2. 2 In this picture are a pedestrian, an inline skater, and a cyclist. They are all going the same way. Which roadway user has right.
Rock Creek East II Livability Study April 28, 2016.
Raumati Road Corridor Consultation and Corridor Assessment
Complete Streets Training Module 4b – Designing for All Users.
TRAFFIC CONTROL ORDERS DOWNTOWN MIDLAND January 23, 2017
STREET SIGNS & TRAFFIC SYMBOLS WHAT THEY MEAN & WHAT TO DO
Saving the King Street Bicycle Boulevard
SMART URBAN FUTURES PRESENTATION
Thoroughfare Plan Update
32 Transportation Midway City 2016 General Plan
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Drive Right Chapter 2 Unit 1
Milton Road – Bus Stop and Crossings Workshop WSP
District 3 Complete Streets Projects
Seattle Bike Map Update
Transportation and Traffic Engineering Ch 1 Introduction 10/10/2017
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
* Topic 7 Field Operations
Irvine Traffic Research & Control Center (ITRAC)
SMART URBAN FUTURES PRESENTATION
Evaluation of Michigan’s Engineering Improvements for Older Drivers
Traffic Committee Ontario Traffic Manual & Warrants March 24, 2015
9th & Colorado Redevelopment Impacts Denver Public Works - Traffic Safety recommendations Community feedback Survey Results Conducted by: Colorado.
In-Pavement Warning System
Emily Guenther Zach Olson Laura Scott Cameron Wein
Pedestrian Signal Rest States
Roundabout metering Tauranga Experience 2 November 2018.
Acton Extension Update
School of Civil Engineering
Design for mid-block traffic signals adjacent rail
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
lesson 2.2 TRAFFIC SIGNALS
Drive Right chapter 2 Thursday, June 27, 2019 lesson 2.1 TRAFFIC SIGNS
Safe Routes to School John Schaefer State Coordinator.
Alex Henry FDOT District Seven Safety Office
Project Location: 35th Ave HSIP8
Presentation transcript:

NZTA Shared Pedestrian and Cycle Lantern Trial Oliver Brown | Stantec | Peloton – Lead Traffic Engineer Alex Lumsdon | Beca | Peloton – Traffic Engineer Image placeholder Image placeholder Image placeholder

What is proposed and Objectives 31 March 2018 to 2020 Install two-aspect shared cycle and pedestrian signals as an alternative to three-aspect cycle signals Evaluate the safety and effectiveness of combined two-aspect cycle and pedestrian signals Assess pedestrians’ and cyclists’ understanding of and compliance with combined lanterns Assess the behaviour of cyclists approaching two-aspect signals Investigation whether separate call buttons for pedestrians and cyclists is required, including any independent signal phasing. What detection requirements are needed for pedestrians and cyclists Investigate safety and efficiency The trial was to install shared two-aspect lanterns at possible locations on Quarrymans Trail MCR In accordance with the NZTA Traffic Note 10 – Trials of traffic control devices guidelines

Trial Benefits Reduce traffic signal hardware Reduction in street furniture Using a shared button for pedestrians and cyclists Improve pedestrian and cyclist interaction Improve lantern displays 1. Reducing capital cost and signal maintenance costs. 2. Improving streetscape and amenity 3. Likely to ease confusion associated with cycle call accept buttons and intermittent detection at signalised intersections 4. Improve interaction with removal of white line that determines this is ped space, and that is cyclists space

Selected Trial Locations Formal trial location can be seen in the gazetted table on the slide. Auckland and Wellington have installed two-aspect cycle signals, however Christchurch have combined the ped/cycle signal within a two-aspect lantern. It is understood Dunedin City Council and Tauranga City Council have shown keen interest to adding to the trial at signalised intersections.

CCC MCR Routes 13 Major Cycleway Routes 101 km of cycleway for the ‘interested but concerned’ demographic to give cycling a go. $206 million committed over 10 years Peloton has designed 8 routes Extensive MCR network within Christchurch City. Mention MCR’s that have already been built and currently operating. Quarrymans Trail MCR section 2 and 3 have been built which were completed by two different contractors FH & Isaac

Quarryman’s Trail Major Cycle Route Moorhouse Ave Quarryman’s Trail Section 1 & 2 Antigua St Brougham St Barrington St Hendersons Rd Strickland St Milton St Hoon Hay Rd Sparks Rd Roker St Sparks Rd Frankleigh St Focus of ‘The Trial’ area Quarrymans Trail MCR Section 3 completed by FH Section 2 completed by Isaac Southern Lights will eventually tie into Quarrymans Trail once built Trial Crossing 1 – Strickland St / Roker St Trial Crossing 2 – Barrington St / Strauss Place St Lyttelton Southern Lights Tennyson St Colombo St

Site Selection Characteristic Strickland Street Barrington Street Road Classification and AADT Minor Arterial 14,970 vpd (August 2016) Collector Road 6,667 vpd (July 2017) Nearby Amenities Barrington Mall and corner shops are located approximately 200m northwest of the site. An entrance to Bradford Park is located on the north-eastern side of Strickland Street, adjoining the signals. Adjacent Land Use Predominantly residential MCR The Quarryman’s Trail MCR runs from Roker Street via a shared path to Barrington Street. The route crosses Barrington Street midblock and continues west on Strauss Place via a neighbourhood greenway. Predicted to cater for 1,900 cyclists per day (2031). The Quarryman’s Trail MCR runs along Strickland Street via a one-way separated facility. The route crosses Strickland Street midblock and continues west on Roker Street via a neighbourhood greenway. Strickland Street is a popular cycle commuter route and forms part of the future potential Southern Lights MCR which is predicted to cater for 900 cyclists per day (2031). Signal Two-aspect with combined pedestrian and cycle aspect, dia. 300mm. Co-ordinated with Barrington/Milton traffic signals. Two-aspect with combined pedestrian and cycle aspect, dia. 200mm. Co-ordinated with Strickland/Milton traffic signals. Signal Phasing Two phase intersection, Barrington Street and the pedestrian/cycle phase. There is also an All Red phase. Two phase intersection, Strickland Street and the pedestrian/cycle phase. There is also an All Red phase.

Traffic Signal Operation & Effects Combined two-aspect signals are based on the traditional pedestrian signals Green time for cyclists will be based on pedestrian walking speeds and less than the traditional cyclist green time The effect of this reduction in green time will reduce cyclist crossing time from around 10 seconds to 6 seconds This results in a reduction in level of service due to cyclists not being permitted to start crossing the road at commencement of the flashing red phase Where are we? We employ more than 6000 people in an integrated network of offices throughout Australia, New Zealand, Asia, the Middle East, the Americas and Europe

Where are we? We employ more than 6000 people in an integrated network of offices throughout Australia, New Zealand, Asia, the Middle East, the Americas and Europe

Design Traditional Layout Trial Layout

Traditional Layout Straven Road Site Evaluations Traditional Layout Straven Road Surveys were undertaken as part of the pre and post installation evaluations The surveys involved observing users at both a combined two-aspect trial site and benchmark site with the traditional separated cycle and pedestrian lanterns Straven Road is the traditional layout, Barrington Street the trial layout Peak demand periods were obtained from Christchurch Transport Operations Centre (CTOC) by looking at the number of push button demands at the crossing Survey data was collected manually onsite A video camera was also installed for the duration of the survey for any post analysis reviews and quality control. Trial Layout Barrington Street Straven Road 25,000 vpd, 700 cyclists per day on Uni-Cycle route near Dean Ave

Survey Findings Modal Split During the survey, a total of 238 users were observed at the Straven Road crossing and 105 users at the Barrington Street crossing. The modal split was similar across the two sites with 69% of observed users being on bicycles at the Straven Road crossing, compared to 70% at the Barrington Street crossing.

Survey Findings User Compliance (Pedestrians) The surveys recorded the compliance of pedestrians using both crossings At both sites, approximately 85% of pedestrian users crossed on the green phase. A greater number of pedestrians commenced crossing on the flashing red phase at the Straven Road crossing than at the Barrington Street crossing (13 compared to one). This included two groups of school children, one group of three and one group of nine, who crossed as groups and, therefore, group behaviour psychology would have had an impact.

Survey Findings User Compliance (Cyclist) A concern of the trial was that a cyclist who commence the crossing when the signals are flashing red will not know if they have sufficient time to clear the crossing safely. However, the same is true for a cyclist who commences crossing when the signals are amber at a traditional site. Of the cyclists who arrived on amber (Straven Road), 71% crossed anyway with the remaining pressing the pedestrian call button to wait for a green phase. Of the cyclists who arrive on flashing red (Barrington Street), 43% crossed anyway with the remaining pressing the call button to wait for a green phase. This interim result indicates the use of pedestrian sequencing reduces the level of non-compliance by cyclists, however, this result should be reassessed once cyclists are more familiar with the Barrington Street signals.

Survey Findings User Interaction (Pedestrians & Cyclists) 62% of users did not interact with the signals at Straven Road One cyclist did not activate the loops and waited at the signals which were activated by a following cyclist crossing the loops Pedestrians on two occasions did not press the pedestrian button and waited for a cyclist to activate the call One pedestrian did not press the pedestrian button but was picked up by the camera The remaining users arrived once a demand had already been put in 36% of users did not interact with the signals at Barrington Street Pedestrians on three occasions did not press the button and just crossed when there was a gap in the traffic Cyclists on four occasions were northbound on Barrington Street and used the signals to cross right into the MCR. There is no facility for these users to activate the signals without riding up onto the footpath.

Survey Findings Infrastructure NZTA Trial Site 2 NZTA Trial Site 1 Strickland Street crossing had 200mm diameter two-aspect lanterns (similar to pedestrian lanterns) NZTA Trial Site 1 Barrington Street crossing had 300mm diameter two-aspect lanterns (similar to pedestrian countdown timers)

Survey Findings Utilization of Crossing Space The survey found that 45% of users at the Straven Road crossing either crossed with a diagonal action (i.e., started crossing on the space for one user type and exited the crossing on the space for the other user type) or used the ‘wrong’ crosswalk (i.e., used the crosswalk lines for the other user type). This was evitable during the surveys, with cyclists being particularly at fault. This indicates that users will use the crossing as it best suited to them, regardless of the pavement markings. However, as shown by the behaviour at Barrington Street with the shared crossing, users are able to navigate the crossing without specific user areas. It was also observed that the stub pole installed to separate the pedestrians from the cyclists at the Straven Road crossing is resulting in cyclists using the pedestrian crosswalks because manoeuvring around the pole is inconvenient / awkward.

Conclusions (interim) Traditional site: Higher number of pedestrians crossing on flashing red compared to trial – likely due to group behaviour. Comparable number of cyclists crossing on red or flashing red / yellow at both sites Higher number of pedestrians and cyclists crossing without demand input Cyclists cross using the pedestrian area, partially due to stub pole being located in manoeuvring space Trial site: More pedestrians and cyclists use push button – possibly due to new site Shared pedestrian / cyclist lanterns must be 300mm diameter No notable safety issues or confusion of users Shared pedestrian / cyclist button is well used by cyclists

Moving Forward / Lessons Learnt Second survey proposed at trial site in early 2019, end of summer period, when user volumes and familiarity will be greater Appears to be benefit in combining the crossing area (removal of central white line) and removal of the stub pole with majority to cyclists traversing the pedestrian area Shared pedestrian and cyclist lanterns and combined push buttons warrant ongoing evaluation.