TGad July 2010 Editor Report April 2007 doc.: IEEE 802.11-07/0570r0 July 2010 TGad July 2010 Editor Report Date: 2010-07-12 Authors: Carlos Cordeiro, Intel Corporation Eldad Perahia, Intel Corporation
TGad draft specification update July 2010 TGad draft specification update Draft 0.1 was released on May 28, 2010 Draft is publicly available at http://www.ieee802.org/11/TGad/index.html Carlos Cordeiro, Intel Corporation
July 2010 Comment submission Following the release of D0.1, a 3 week commenting period was opened on D0.1 A total of 513 comments were received – comment database is document 802.11-10/717 Comments were reviewed during the July 1st conference call and classified into (sub)groups: 236 editorial comments (ER) = handled directly by the Editor 277 technical comments (TR) = resolutions to be proposed by volunteers 2 in the General comment group 24 in the Beamforming comment group 207 in the MAC comment group 41 in the PHY comment group 3 in the Coexistence comment group Carlos Cordeiro, Intel Corporation
April 2007 doc.: IEEE 802.11-07/0570r0 July 2010 Comment resolution Comment resolution will take place starting at the July/10 session Via submissions Via proposed resolutions suggested by assignees Via comment review sessions led by the Editor As per the TGad timeline, goal is to complete comment resolution at the September/10 session and enter WG letter ballot Any motions to approve comment resolutions should be done by September/10 Carlos Cordeiro, Intel Corporation Eldad Perahia, Intel Corporation