Poseidon Distribution Options

Slides:



Advertisements
Similar presentations
SOUTH ORANGE COUNTY REGIONAL RECYCLED WATER Orange County Business Council Infrastructure Committee May 13, 2014.
Advertisements

THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Society of Environmental Journalists October 20, 2012 Recycling: It is just the right thing to do! West Basin Municipal Water District Coastal Los Angeles.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
SANTA MARGARITA WATER DISTRICT. South Orange County Service Area SMWD TCWD IRWD LBCWD ETWD MNWD SJC SCWD MWD Lake Mathews.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
1 Recycled Water Program for the City of Los Angeles.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Carlsbad Desalination Plant Aerial 1. Carlsbad Desalination Project Aerial (Plant & Pipeline) 2 Desal Conveyance Pipeline 10-miles of new 54-inch pipe.
Marina Coast Water District: A California Special District ORD COMMUNITY WATER AUGMENTATION DIRECTORS Dr. THOMAS P. MOORE President JAN SHRINER Vice President.
Emerging Contaminants & the Groundwater Replenishment System Shivaji Deshmukh April 18, 2007.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Long Beach Water Department Review of FY 12 Budget.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Groundwater Assessment Study for the Metropolitan Water District of Southern California Southern California Water Dialogue May 2008.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Landscape Transformation “ Millions of Lessons Learned ” Metropolitan Water District of Southern California Bill McDonnell January 25, 2016.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Began funding reclaimed projects in projects funded 325 projects completed $435M leveraged $1 Billion 970 miles of pipelines 248 MGD reuse capacity.
3 Old Dominion University Lake Gaston Project Field Trip November 1, 2014 Thomas M. Leahy, P.E. Director of Public Utilities.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Protecting the Lives of our Community Every single day, much of what we do goes by without much notice. Without fail, we work hard to protect the lives.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Green Acres Project Future Direction Water Issues Committee August 10, 2016.
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
2015 Urban Water Management Plan Overview
Capital Plan Update and Five-Year CIP
Kings Bluff Raw Water System Parallel Raw Water Main Project
Joe Mouawad, P. E. September 7, 2016
MOUNTAIN REGIONAL WATER
OCWD Speakers Bureau 10 min static
LAS VEGAS VALLEY WATER DISTRICT
Water Resources Plan 2040 Update
Recycled Water Project – Sharon Heights GCC
Water resources In Iron and Washington Counties
Policy Principles for the Allocation of Recycled Water
Florida and Reclaimed Water
GWRS Operations Update and Budget Review
Zone 7 And WaterFix March 7, 2018
OCWD Speakers Bureau 10 min static
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
Video Monitoring System Project
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Big Sky Wastewater Facility Plan Update
Adoption of the Fiscal Year 2019 Recommended Operating Budget
City of Sunrise Wastewater Reuse Program
Orange County Groundwater Basin Compliance with SGMA
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
MWDOC Urban Water Management Plan
California Water Commission
Is the Bay Area Ready for Potable Reuse?
TAPPING THE WORLD OF POSSIBILITIES
Claude “Bud” Lewis Desalination Plant
Carlsbad and Huntington Beach Seawater Desalination Facilities
August 30, 2019 Robert Beltran, PE , BCEE
How the GWRS Overcame the “Yuck” Factor
Presentation transcript:

Poseidon Distribution Options Options 1 – 3 include new facilities to take 15 mgd of Poseidon Water into the Talbert Seawater Barrier; an equal amount of displaced GWRS water is sent to Burris Basin Option # 35 Mgd Option Descriptions Capital Cost 1A 26 Injection Wells and necessary pipelines $305 M 1B New pipeline branching off of GWRS pipeline to Kraemer Basin and 16 injection wells $316 M 1C New pipeline from Fountain Valley to Anaheim and a new 20 acre recharge basin $280 M 1D Sell additional water to Newport Beach and Huntington Beach and 20 injection wells $250 M 2 New pipeline up Newland to WOCWB Line to distribute water to 5 Producers $97 M 3 Same as option #2 plus a new pipeline to send water to SOC; $161 M 4 Original Poseidon Distribution of Water into OC44 and EOCF#2 $108 M

GWRS Final Expansion (30 mgd of new water) Kraemer Miller 15 mgd Miraloma 60” La Palma Burris Booster Pump Station to send additional 15 mgd to Kraemer Basin (85 to 100 mgd) GWRS Final Expansion (30 mgd of new water) 7 mgd 66” Willowick Golf Course 72” Edinger Five Mid Basin Injection Wells at Centennial Park - ~8 mgd GWRS Pipeline (not to scale) 78”

Desal Option 1A $305 Million $465/af 26 Injection Wells Facility Ball Road Basin Inj. Wells Facility Flow (MGD) Ball Road Basin Inj. Wells 4.5 ARTIC Inj. Well 2 Campesino Park Inj. Wells Dyer Wellfield Inj. Wells 12 SAR Injection Wells 6 Talbert Seawater Barrier 15 Southeast Talbert Inj. Wells TOTAL 50 ARTIC Inj. Well Campesino Park Inj. Wells Dyer Wellfield Inj. Wells SAR Injection Wells Desal Distribution Pump Station Southeast Talbert Inj. Wells $305 Million $465/af 26 Injection Wells 54-inch Desal Distribution Pipe

Desal Option 1B $316 Million $478/af 16 Injection Wells Facility Flow (MGD) Kraemer Basin Recharge 15 ARTIC Inj. Well 2 Dyer Wellfield Inj. Wells 12 Talbert Seawater Barrier Southeast Talbert Inj. Wells 6 TOTAL 50 ARTIC Inj. Well 30-inch Desal Kraemer Distribution Pipeline Dyer Wellfield Inj. Wells $316 Million $478/af 16 Injection Wells Southeast Talbert Inj. Wells 54-inch Desal Distribution Pipe

Desal Option 1C $280 Million $415/af 0 Injection Wells Facility New Recharge Basin Facility Flow (MGD) New Recharge Basin 35 Talbert Seawater Barrier 15 TOTAL 50 42-inch Desal Recharge Basin Distribution Pipeline $280 Million $415/af 0 Injection Wells 42-inch Desal Barrier Distribution Pipeline

Desal Option 1D $250 Million $398/af 20 Injection Wells Facility Flow (MGD) ARTIC Inj. Well 2 Dyer Wellfield Inj. Wells 12 SAR Injection Wells 6 Talbert Seawater Barrier 15 Southeast Talbert Inj. Wells 54-inch Desal Pipeline Turnouts to OC Producers 9 TOTAL 50 ARTIC Inj. Well Dyer Wellfield Inj. Wells SAR Injection Wells Desal Distribution Pump Station Southeast Talbert Inj. Wells $250 Million $398/af 20 Injection Wells 54-inch Desal Distribution Pipe

Total Expected Future Recharge with Poseidon Water (afy)

Desal Option 2 $97 Million $165/af Facility Flow (MGD) OC Producers via WOCWBF 27 OC Producers via Adams 8 Talbert Seawater Barrier 15 TOTAL 50 42-inch Desal Producer Distribution Pipe via WOCWBF 24-inch Desal Producer Distribution Pipe via Adams $97 Million $165/af 42-inch Desal Distribution Pipe

Desal Option 3 $161 Million $243/af Facility Flow (MGD) OC Producers via WOCWBF 25 South County via OC-44 & South County Desal Pipe 10 Talbert Seawater Barrier 15 TOTAL 50 42-inch Desal Producer Distribution Pipe via WOCWBF 36-inch OC-44 Pipe Improvements 42-inch Desal Distribution Pipe $161 Million $243/af 36-inch South County Desal Distribution Pipe HB Desal Facility EOCF No.2

New Issues No increase to future water demands State’s emergency 25% water demand reduction Permanent? Standard operating procedure? Modified? Ocean desalination get credit? MWD Indirect Potable Reuse project with LA County

Historical Total Water Demands (afy) Projection

Future Water Supply Portfolio Total Water Demands 452,000 afy

Future Water Supply Portfolio Total Water Demands 452,000 afy

AAA Credit Rating Issues Project will double OCWD’s operating budget; could approximately double necessary reserves to maintain 625 days coverage Taking on any new debt – requires twice the revenues to maintain coverage ratio

Alternatives Study Approved by Board with Term Sheet Approval in May 2015 Money set aside to hire consultant