Regional NETWORK OPERATIONAL ANALYSIS

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.
1 Item 11, Presentation to the TPB, September 15, 2010.
Gainesville-Hall MPO 2035 Long Range Transportation Plan Update Public Information Meeting June 29, 2006.
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
Senate Committee on Transportation, Technology and Legislative Affairs House Committee on Public Transportation Thursday, July 18, 2013.
I-15 MANAGED LANES Building on Success Institute of Transportation Studies’ Center for Urban Infrastructure March 7, 2003.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
1 Overview of the CLRP The Financially Constrained Long-Range Transportation Plan TPB Citizens Advisory Committee March 10, 2005.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Wasatch Choice for 2040 Envision Tomorrow Plus Scenario Evaluation Tool (land use) MAG, WFRC, Envision Utah are beta testing.
Planning Applications: A City- wide Microsimulation Model for Virginia Beach Craig Jordan, Old Dominion University Mecit Cetin, Old Dominion University.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Patriot’s Crossing July 21, Bottom Line Up Front The Hampton Roads Chamber of Commerce is taking the lead on advancing and advocating for the Patriot’s.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
I-394 MnPASS Technical Evaluation Doug Sallman – Cambridge Systematics, Inc.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
1 Patriot’s Crossing  PROVIDES MOST REGIONAL CONGESTION RELIEF  UNIQUELY POSITIONED TO SUPPORT REGIONAL ECONOMIC GROWTH  IMPROVING TOTAL REGIONAL CONNECTIVITY.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
HRTPO and Urban Freight R/R Operations Robert B. Case, PE, Principal Transportation Engineer.
I-95 Managed Lanes CORSIM Analysis Status Meeting Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc.
Modeling Various Tolling Schemes Using Emme: Seattle Experience Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget.
Steve Heminger Executive Director, MTC AMPO Annual Conference Washington, D.C. – October 23, 2003 Playing in Traffic: A New Look at Management and Operations.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Metro Highway Program Presentation to CMAA Abdollah Ansari
A Sketch Planning Assessment of Managed-Lane Options for the I-5 Freeway Corridor Master Plan William R. Loudon, DKS Associates.
Hampton Roads Third Crossing I. Introduction VDOT, in cooperation with the Federal Highway Administration (FHWA) is proposing to construct a new bridge-tunnel.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Public Private Partnership (P3)
Integrating Transit and Highway Solutions In High Volume Corridors
Evaluation of Hard Shoulder vs
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Presented by: Fred Kessler Nossaman LLP
I-77 High-Occupancy Toll Lanes
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
NGTA Halton Planning and Public Works Committee
Major Projects in Development
Nick Wood, P.E. Texas A&M Transportation Institute
Project Overview Multimodal improvements to 22.5 miles of I-66
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
River to Sea TPO Meeting US 92/International Speedway Boulevard
Slugging in the I-395 Corridor
Evaluate the expression ( i) + ( i) and write the result in the form a + bi. Choose the answer from the following: i i i.
HRTAC/HRTPO Overview Kevin B. Page Executive Director, HRTAC
Responsibilities and FUNDING
2010 Hurricane Season Update
Y1 facts Y2 facts Adding 1 Bonds to 10
Briefing to HRTAC re: HRBT Expansion Project Cost Estimates, Funding Mechanisms, and Next Steps December 13, 2018.
Networking Together in the Future
Sharing What We Know: Strengthening Implementer Capacity
Current and proposed HOT facilities update
Current Interstate Maintenance Services Contracts
Urban Studies CGC1D.
HW Key: p. 358: 1-9 all, all 1) D: (0, ∞); R: (- ∞, ∞); increases; VA: x = 0 D: (0, ∞); R: (- ∞, ∞); increases; VA: x = 0 D: (0, ∞); R: (- ∞, ∞);
SMART SCALE Round 3 Joint Commission on Transportation Accountability
Major Initiatives in Hampton Roads
Enford Then and Now The Swan, Enford.
Presentation transcript:

Regional NETWORK OPERATIONAL ANALYSIS Hampton Roads VA Christopher Hall December 13, 2018

Regional HOT Network Study Key Facts: Existing HOT Projects in Study Area - Approved 64 Express Lanes (reversible – in operation) High Rise Bridge (under construction) HRBT (in procurement) HRTPO Endorsement of I-64 Regional HOT Network Study Limits (39.5 miles) I-64 near Hampton Coliseum to Bowers Hill Interchange (I-664/I-264) Operational Analysis – 2025 Horizon Year

Regional HOT Network Analysis Scenario 1 – I-64 as Planned/Approved Segment 1 – HOT reversible (64 Express Lanes) Segment 2A – HOT bi-directional (I-64 Southside/High Rise Bridge) Segment 2B – HOV bi-directional (Chesapeake Express Lanes) Segment 3 – HOT bi-directional (HRBT)

Regional HOT Network Analysis Scenario 2 – Regional HOT Network Segment 1 – HOT reversible (64 Express Lanes) Segment 2A – HOT bi-directional (I-64 Southside/High Rise Bridge) Segment 2B – HOT bi-directional (Chesapeake Express Lanes) Segment 3 – HOT bi-directional (HRBT)

Regional HOT Network Analysis Key Objectives Analysis of Operational interface between segments Identify operational challenges between segmented projects and as HOT Network Clarify access and transition points Evaluation of HOT Lane and General Purpose Lane performance