Current and proposed HOT facilities update

Slides:



Advertisements
Similar presentations
Minnesotas Congestion Pricing Program Road User Charging Conference January, 2009 By Bernie Arseneau Minnesota (USA) Department of Transportation.
Advertisements

HOV Pooled-Fund Study HOV Facility Inventory and Clearinghouse Project Presentation ◊
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
Santa Maria River Bridges Widening. Project Location.
I-394 Express Lane Community Task Force March 18, 2004.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco DTA Model: Working Model Calibration Part 2: Results Renee Alsup DTA Peer Review Panel Meeting.
RED LIGHT CAMERAS CITY COUNCIL WORKSHOP NOVEMBER 29, 2011.
1 Evaluation of Ports of Entry (POE) for the International Border in the El Paso MPO Study Area.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
2011 Freeway Congestion Monitoring Program Findings TPB Technical Committee December 2, 2011 Greg Jordan, SKYCOMP, Inc & Daivamani Sivasailam, DTP TPB.
1 Interstate 405 Update. 2 Presentation Overview  Share public perceptions and provide information  Answer frequently asked questions related to express.
PROJECT DESCRIPTION KATY (I-10) HOT LANE 13 mile (20.9 km), one-lane reversible facility in the median of Katy (I-10) Freeway. HOT operations (QuickRide)
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration Department of Transportation Enabling Congestion Pricing in the.
Norman W. Garrick Travel Flow Data Some Basic Concepts Good travel flow data for all modes of travel is important for transportation planning and design.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Interpreting Demand and Capacity for Street and Highway Design Lecture 6 CE 5720 Norman Garrick Norman W. Garrick.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild.
Challenged Detectors – Volume- Occupancy Plots & Maps.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Modeling Various Tolling Schemes Using Emme: Seattle Experience Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
I-394 MnPASS Express Lanes Project Update Guidestar Board Meeting September 7th, 2005.
2004 Transportation M etropolitan A tlanta P erformance Report – Congestion Measures Presentation to ITS Georgia August 29, 2005.
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Ed Regan Senior Vice President.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Presentation to Transportation Planning Board October.
A Sketch Planning Assessment of Managed-Lane Options for the I-5 Freeway Corridor Master Plan William R. Loudon, DKS Associates.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
B A Y A R E A T O L L A U T H O R I T Y 1 Toll Increase Options for the State-owned Bay Area Bridges BATA Oversight Committee Public Hearing on Proposed.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
The National Weather Service has recorded tornadoes in all months of the year for the St. Louis area. Historically there is “peak” of activity in early.
US 36 Bus Rapid Transit RTD Board Update January 6, 2015.
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Evaluation of Hard Shoulder vs
(Expressway Traffic Management System)
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Charlotte Region Fast Lanes Study
Jim Henricksen, MnDOT Steve Ruegg, WSP
Traffic Concepts CEE 320 Anne Goodchild.
Summary of Traffic Conditions I210-E
Time Revision.
Slugging in the I-395 Corridor
North Main Street Intersection Improvements at Route 460 Bypass
FM 518 By-pass Traffic Review
Predicting Traffic Dmitriy Bespalov.
STATE SUEE AND ONE WAY CORRIDORS
Christmas Opening Hours
Quaker Lane & Seminary Road/ Janney’s Lane March 14, 2013
Briefing to HRTAC re: HRBT Expansion Project Cost Estimates, Funding Mechanisms, and Next Steps December 13, 2018.
Regional NETWORK OPERATIONAL ANALYSIS
Elapsed Time.
Lovejoy Community Center April “2018”
Traffic Concepts CEE 320 Steve Muench.
Major Initiatives in Hampton Roads
Naval Complexes Meeting April 15, 2019
Broward County Congestion Assessment
*All classes are 4 hours in length. Monday, April 1st 11:00am – 3:00pm
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

Current and proposed HOT facilities update Hampton Roads VA Christopher Hall December 13, 2018

Performance-reversible (Segment 1) Revenue Average toll rates since January 2018 Express EB Mon-Fri 2 p.m. to 6 p.m.: $0.83 WB Mon-Fri 5 a.m. to 9 a.m.: $0.71 Estimated 1st Yr Gross Revenue ~ $1.9M First 11 Months, Actual Gross Revenue = $ 1.74M ($ 1.74/11) x 12 months = $ 1.9M Operational Efficiency 25% of total traffic volume is using this facility Average of AM and PM Operations Actual Traffic Counts , 42 Days Oct/Nov 2018 Operating Hours: WB 5am to 9am EB 2pm to 6pm Reversible HOV Usage trend: 2016 – 15.3% 2017 – 14.0% 2018 – 12.5% Note: Percentages Include “Violators”

I-64 Southside and High Rise Bridge (Segment 2A) Currently designed to operate as a separate HOT facility HOT Lanes – Entry/Exit at Project East and West Ends Managed Shoulder from Rt. 17 to Great Bridge Blvd January 2017 Operational Traffic Analysis 30% of Total Traffic Volume Projected to Use HOT Lanes at Peak Periods Initial GP Lane Time Savings: EB (6.9 Min), WB (4.0 Min) PROFILE 1 PROFILE 2 Managed Shoulder (Where Applicable PROFILE 2 PROFILE 1

Hampton Roads Bridge Tunnel (Segment 3 – HOT) Projected Performance: HOT Lanes Operate Effectively with projected, Throughput Improvement (2040 projection) Projected HOT Lane Usage (EB AM 38%, PM 31% / WB AM 26%, PM 42%) GP Lane Time Savings (EB AM 27min, PM 28min / WB AM 14min, PM 23min) HOT Lanes – Entry/Exit at Project East and West Ends Part Time HOT Shoulder (Capacity Increase) Question – what is the concept of operation for the Part-Time shoulder?