RF Distribution for Warm Linac

Slides:



Advertisements
Similar presentations
Requirements Structure and Status for NCFE
Advertisements

DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Lali Tchelidze Safety work package leader
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Anders Sunesson RF Group ESS Accelerator Division
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
ESS Spoke Linac section RF Anders Sunesson, RF group leader Rutambhara Yogi ESS Carlos Martins ESS Roger Ruber FREIA.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
1 ESS Warm End Linac Cooling Water 5-6 May 2014 John Jurns.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
ELENA installation progress F. Butin / ELENA collaboration.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
WP High Beta Cavities Delivery
Bruno POTTIN, Anne-Catherine CHAUVEAU
RF cell Anders Sunesson RF group leader
ESS Phase Reference Signal Distribution
CBETA Technical Review
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
SPS cryogenic proximity equipment and SM18 validation
Coordination meeting 12/05/15
MicroMegas Mechanical Meeting --- Cern April 2014
Section 1.0 — Fundamentals and General
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
ESS Project Status Roland Garoby – Technical Director August 2018.
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
RF systems introduction
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
ESS Bilbao RF Systems Overview Pedro J. González
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Krzysztof Czuba ESS LLRF Quarterly Meeting
Risk, Schedule, Deliveries
Introduction CDR Normal Conducting Linac LLRF
ILC - Global Design Effort
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
European Spallation Source ERIC
WP16 Water cooling systems
Bunker Project Schedule/Budget
High Level Readiness Reviews
Phase reference RF work
Accelerator NCFE Liaison Officer
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Status of the ESS High Power RF Systems
Plan for early Operation
RF introduction Anders Sunesson RF group leader
Radiation fields During 1st stage beam commissioning
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Presentation transcript:

RF Distribution for Warm Linac RF Systems Group Zamudio, 30 May 2018

Outline 3D Layout Status RFQ and DTL distribution: Rectangular Waveguides and Loads and Circulators. MEBT distribution: Coaxial Components Structure and Supports: Gallery, Stub and Tunnel Others: Power Detectors and Arc Detectors Conclusions / ACTIONS

3D Layout Status: -- Huge effort: I. Barrera (ESS-Bilbao) and Pontus (ESS) -- Layout is frozen (minor changes allowed) Good Job! -- Finding: 3D models and drawings available in Chess are obsolete: Example 1: RF Gallery: ESS-0038136.2. No updated since 2015 Example 2: Stubs 100/110: ESS-0034986.2 and ESS- 0034999.2 No updated since 2016 Proposed action: Upload the final version of the 3D Model and corresponding drawings to CHESS for the whole RF Warm Linac.

2. RFQ and DTL distribution: Rectangular Waveguides: -- Technical Specifications. CLOSED. Colab. Yogi!! -- Documentation: under review of the law officer as a legal requirement before the publication of the tender. -- Tender: expected to be published July 2018 -- Tech. question to ESS? : Update on the air cooling (simulations/actions) of the waveguides in Stubs. B) Loads and Circulators: -- Tender: Published on late Feb. 2018. 1 Company interested but did not send all documentation in time. Therefore process to be declared a “Void tender” Next Steps??

3.- MEBT distribution: Coaxial Components -- Layout Closed: good work . MEBT group involded including Morteza (PSS), RF group (Yogi, Sunesson) -- Tender: Not needed. Minor contract ACTIONS: 1) Procurement Date: Late June expected 2) Delivery in Lund: Mid September

4. Structure and Supports: Huge Collaboration!! Gallery: -- Status: ESS-Bilbao working on load calculations in order to finish the documentation required to start the tender procedure. -- Questions to ESS: 1) In order to define the anchorages we should know the thickness and quality of the concrete slab under the gallery floor? Which type of anchorages: Chemical or expansion? 2) Which is the exact location for the piping / wiring above the structure of the gallery? ACTIONS:

4. Structure and Supports: Huge Collaboration!! B) Stub and Tunnel: -- Status: CLOSED. ESS-Bilbao to send ESS (Pontus) final version of the 3D model. -- Tender: Ask for a quotation to several companies. -- Questions: To confirm final locations of the envelopes for wiring and piping in Stub 100/110? Update on the mock-up of the Stub for the spokes cavities?? ACTIONS:

Outline 5.- Others: Power Detectors and Arc Detectors -- Status: --Questions: 1) Type of Arc Detectors / Locations? 2) Power Detector:?? GENERAL CONCLUSIONS / ACTIONS: