Dual Auction Timeline Subordinate Auction Senior Auction

Slides:



Advertisements
Similar presentations
April 12, SLIDE 1 Copyright © 2011 International Swaps and Derivatives Association, Inc. FpML Reporting WG FpML Representation for Public Price.
Advertisements

April SLIDE 1 Copyright © 2011 International Swaps and Derivatives Association, Inc. FpML Reporting WG FpML Representation for Public Price Transparency.
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
ISDA ® The New CDS Landscape Auction Settlement International Swaps and Derivatives Association, Inc. ISDA ® Copyright © 2009 International Swaps and Derivatives.
Preparing Data for Quantitative Analysis
Multi-Stage Bidding.
Pricing Understanding and Capturing Customer Value
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Slide 1- 1.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 9-1 International Business Environments & Operations 14e Daniels ● Radebaugh ● Sullivan.
Flowers For The World A Business Game to Support the Teaching of MIS Concepts.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 5 Part 1 Conditionals and Loops.
Forest River, Inc – Dealer Central. Available Dealer Options.
International Swaps and Derivatives Association, Inc. International Swaps and Derivatives Association, Inc. Understanding the 1992 ISDA Master Agreements.
1 HOW TO APPLY FOR EU FUNDING - MAJOR STEPS THE BULGARIAN EXAMPLE – RURAL DEVELOPMENT PROGRAM Skopje, November 10, 2009.
Chapter 16 Capital Goods McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Electronic Trading in OTC Markets: A Risk Management Windfall PRMIA, Toronto February 18, 2009.
11-1 Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter 11 Marketing Processes and Consumer Behavior.
BUILDING A SPECTRUM AUCTION SYSTEM. N O N P A C K A G E B I D D I N G 1995 FIRST AUCTION BID ENTRY CHANGES NEW BID INCREMENT CALCS WEB BASED BIDDING.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
McGraw-Hill/Irwin Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved. 3-1 How Securities Are Traded Chapter 3.
ISDA ® 2009 ISDA CREDIT DERIVATIVES DETERMINATIONS COMMITTEES AND AUCTION SETTLEMENT CDS PROTOCOL International Swaps and Derivatives Association, Inc.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 9 Derivatives: Futures, Options, and Swaps.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Copyright © 2011 Pearson Education, Inc. Publishing as Pearson Addison-Wesley. Chapter 4 Applications of the Derivative.
2.02Classify the functions of marketing and the marketing mix.
Copyright © 2007 Pearson Education Canada 1 Chapter 21: Completing the Audit.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
LPTV and TV Translator Digital Companion Channels Auction 85 Lynne Milne, Senior Attorney Auctions and Spectrum Access Division Auction Anti-Collusion.
Farnborough Airspace Change Proposal Briefing to FACC 26 th November 2014 TAG Farnborough Airport.
Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Copyright © 2011 Pearson Education, Inc. Publishing as Longman.
Chapter Fourteen Building a Marketing Plan. Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall14-2 Building a Marketing Plan Creativity.
External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing.
UNITED IN SERVICE TO OUR NATION UNCLASSIFIED Filter Tasks and Requirements.
Managing Auction Listings on the MLS James Harrison, RCE, CAE President and Chief Executive Officer MLSListings Inc.
1 Settlement Dispute Validation Commercial Operations Subcommittee January 27, 2005 Presented by ERCOT Wholesale Client Services.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
Investments, 8 th edition Bodie, Kane and Marcus Slides by Susan Hine McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Roundtable November 12, 2015 Auditorium C, DHMC.  The continuing Resolution is good until December 11, 2015….stay tuned.  Non-competing awards are issued.
March, SLIDE 1 Copyright © 2011 International Swaps and Derivatives Association, Inc. FpML Reporting WG FpML Representation for Public Price Transparency.
Copyright © 2009 Pearson Education, Inc. publishing as Prentice Hall 9-1 Part Four World Financial Environment Chapter Nine Global Foreign Exchange And.
May 3, 2016 Presented by: Jamila Piracci, Vice President, OTC Derivatives Alessandra Riccardi, Director of Capital and Risk NFA Webinar: Margin Model Approval.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
ASH BUS 435 Week 2 Business Concept Check this A+ tutorial guideline at business-concept Prepare.
Market Trials Open Market Participant Call
Click ’n’ Transact EnronOnline
Calculating CRR Auction Portfolio Exposure:
Mod_06_12 Improved Efficiencies in LCF Process 31 January 2012
Market Trials Open Market Participant Call
Warranty Claims.
Five-Minute Settlement Program: Executive Forum 1
The Incremental Proposal
Copyright © 2011 Pearson Education, Inc
Analyzing Business Markets
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Analyzing Business Markets
2008 Quebecor CDS Protocol Auction Timeline
Section 6.7 Financial Models
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
Meter Data Publication Timing
Value of items received Cash adjustment to get fair share
TRANSMITTAL FUNDS NETTING
Update on Market Trials
Manage Sourcing - Supplier
Copyright © 2011 Pearson Education, Inc
Presentation transcript:

Dual Auction Timeline Subordinate Auction Senior Auction Open Interest Inside Market Midpoint Adjustment Amount PUBLISHED 9.45 10.00 SUBMIT Valid Inside Market Submission Dealer Physical Settlement Req Customer Physical Settlement Req 11.00 Adjustment Amount 12.00 Senior Auction Initial Bidding Period Limit Bids / Limit Offering (Dealer & Customer) Subsequent Bidding Period 1.00 2.00 Final Price etc…… 3.00 Final Price 11.15 11.30 10.45 This timeline is a summary of certain settlement procedures set forth in the 2006 Dura CDS Protocol (the "Dura Protocol"), as published by the International Swaps and Derivatives Association, Inc. on November 8, 2006, and is provided for information purposes only. It does not summarize all provisions set forth in the Dura Protocol. The user must refer to the Dura Protocol itself for the specific details concerning the auction timeline and other elements of the Dura Protocol. Copyright © 2006 by International Swaps and Derivatives Association, Inc.