Implementation of Waste Related Provisions of the POPs Regulation

Slides:



Advertisements
Similar presentations
Workshop on Inventories and Projections of Greenhouse Gas Emissions from Waste under WG 1 and 2 of the Climate Change Committee Presentation of UNFCCC.
Advertisements

Workshop on Inventories and Projections of Greenhouse Gas Emissions from Waste under WG 1 and 2 of the Climate Change Committee Summary of reporting on.
Slide: 1Presentation: Liliana Cortellini DG ENV/B1 Bruxelles, 4 April 2006 Nitrates Directive: requirements and experiences of implementation Liliana Cortellini.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Progress in the Electricity and Gas Single.
Patricia de Suzzoni, Chair of ERGEG Customer Working Group Citizens’ Energy Forum, London, September 2009 Regulatory aspects of smart metering in.
Elisabeth Hosner, Vilnius 02/03 March 2004 Slide 1 Ministry for Agriculture, Forestry, Environment and Water Management, VII/2, Austria The Urban Waste.
Reporting of 2007 EIONET air emissions priority data flows, summary of country performance Reporting of 2007 EIONET air emissions priority data flows,
Directive 95/50/EC TDG Checks Application of Annexes Erkki Laakso EUROPEAN COMMISSION DG ENERGY & TRANSPORT TDG Checks Riga June 2006.
PAMUKKALE UNIVERSITY DENİZLİ, TURKEY Rome Meeting July 4-8, 2007.
Gap filling process for the EC CLRTAP inventory B.Gugele, K.Mareckova, ETC-ACC TFEIP EIONET workshop, Vienna, 11 May 2009.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
THE EUROPEAN UNION How does the structure of government within the EU compare with the structure of government in the United States?
EUROPEAN UNION – MAKING OFF European Economic Community
COUNCIL REGULATION No 259/93 (Legal framework) Ton Post / Kees van Hees VROM Inspection Notes.
History of the European Union
Notion and system of European Labour Law
European Union Duy Trinh.
The European Monetary Union – First Years
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
DISTRIBUTION AUTOMATIC - GENERATION
Week 6: The institutional structure of the EU
The European Monetary Union – First Years
Landfilling in the Slovak Republic – legislation and actual situation
Biodegradable waste and its management in the Slovak Republic
Methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) MSCG Sarine Barsoumian 7 April /09/2018.
LAMAS January 2016 Agenda Item Annual Labour costs levels Denis Leythienne Daniel Iscru.
Pesticide data Sales data: Use data: Country use data:
State of play of OP negotiations and OP implementation
Marine Strategy Framework Directive:
The Inventory Questionnaire
The European Parliament – voice of the people
The European Parliament – voice of the people
Support to National Helpdesks
HOW THE EU WORKS.
Urban Waste Water Treatment Directive
Fusions Regional Platform Meeting – Budapest, June 3, 2015
Protection of the EU budget
Consultation process on Milieu's national technical reports Part of Commission Assessment process on art. 11 On technical country reports : Letters and.
Implementation of the COP-4 decisions
DG Environment, Unit D.2 Marine Environment and Water Industry
EU: First- & Second-Generation Immigrants
1st Implementation Report of the Water Framework Directive
Andreas Krüger, Eurostat - Unit C2 National Accounts - production
Role of the European Council and the Council of the EU within the European Institutions Berthold Berger, Director General Secretariat of the Council.
Marine Strategy Framework Directive: Transposition and Implementation
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Regional Accounts
Inventory preparation for priority substances
European Union Membership
State of play of OP negotiations
London Water Directors Meeting
Report on the application of the POP Regulation
Cost Effectiveness Analysis Questionnaire Results
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Marine Strategy Framework Directive: Status of reporting
Update on Derogation Reporting
Update on reporting status
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
Marine Strategy Framework Directive: Transposition and Implementation
New voting rules in Regulatory Committe
Lessons to be learned from the exercise
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Update on Derogation Reporting
Regional Accounts ESA 95 Data Collection
Collecting methodological information on regional statistics
Marine regions - Art. 4 Progress on review and GIS data
J. Cofala, Z. Klimont, F. Wagner, M. Amann
Implementation of Waste Related Provisions of the POPs Regulation
Reports from Member States on:
Update on Derogation Reporting
Presentation transcript:

Implementation of Waste Related Provisions of the POPs Regulation Topics: Commission Study State of work in the TAC PCB Directive Presentation on the 2nd CA-meeting on 21 February 2006 By Martin Pohlmann (e-mail: martin.pohlmann@cec.eu.int)

Commission Study http://europa.eu.int/comm/environment/waste/studies/index.htm Studie includes: POPs mass flow Methodology to identify and proposals for low and maximum concentration limits Methodology, reporting format and examples on POPs waste in another environmentally preferable manner Reference measurement methods

Waste consisting of, containing or contaminated with Waste flow under Article 7 of the Regulation (EC) 850/2004 Waste consisting of, containing or contaminated with PCB * Commission proposal Below low concentration limit acc. to Art. 7(4)(a) + Annex IV ? <50 mg/kg* Recovery or disposal in accordance with other Community waste legislation yes no D9, D10 Destruction or irreversible transformation of the POPs content in accordance with Art. 7(2) + Annex V, Part 1

Waste consisting of, containing or contaminated with Waste flow under Article 7 of the Regulation (EC) 850/2004 Waste consisting of, containing or contaminated with other 12 POPs * Commission proposal Below low concentration limit acc. to Art. 7(4)(a) + Annex IV ? <50 mg/kg* Dealt with in another env. preferable way, acc. to Art. 7(4)(b) + Annex V, part 2? < 5000 mg/kg* Recovery or disposal in accordance with other Community waste legislation Salt mines and underground storage in dry rock formations yes yes no no Solidification or partly stabilisation Landfill for hazardous waste R1, R4*, D9, D10 Destruction or irreversible transformation of the POPs content in accordance with Art. 7(2) + Annex V, Part 1

Waste consisting of, containing or contaminated with Waste flow under Article 7 of the Regulation (EC) 850/2004 Waste consisting of, containing or contaminated with PCDD / PCDF * Commission proposal Disposal in accordance with other Community waste legislation Below low concentration limit according to Art. 7(4)(a) + Annex IV? <15 μg/kg* Dealt with in another env. preferable way, acc. to Art. 7(4)(b) + Annex V, part 2? <5 mg/kg* Recovery in accordance with other Community waste legislation Salt mines and underground storage in dry rock formations yes yes Below 1μg/kg?* no no Solidification or partly stabilisation Landfill for hazardous waste yes no Solidification with ensured max. leachate rate R1, R4*, D9, D10 Destruction or irreversible transformation of the POPs content in accordance with Art. 7(2) + Annex V, Part 1

State of Work in the TAC Last meeting on 25 January 2006: 1 proposal adopted: clarification of permission to carry out pre-treatment operations (Annex V, part 2) 2 proposals no opinion by MS:maximum and low concentration limits (Annex IV and V) Referral to the Council expected by the end of March Two proposals withdrawn from the vote: solidification requirement for PCDD/F > 1 ppb (Annex IV), R4 operation (Annex V, part 1)

Implementation of PCB Directive 96/59/EC MS elaborate Inventories for equipment > 5 l (Article 4) plans for decontamination and/or disposal (Art. 11(1), first indent) Outlines for the collection and disposal of non-inventoried equipment (Art. 11(1), second indent)

PCB inventories (Art. 4) Most MS have sent summaries of their inventories to the Commission Except for Walloon, Slovenia 8 MS with remaining PCB quantities > 5000 tons: Czech Republic, Estonia, France, Italy, Poland, Slovakia, Spain, United Kingdom

Estimation of remaining gross weight of PCB containing equipment; total: 1,1 Mio tons (gross weight) MEURS report for CLEEN, 2005

PCB Plans (Art. 11) Most MS have sent their disposal/decontamination plans to the Commission except for Cyprus (not yet adopted?) Malta (only included in hazardous waste management plan) Slovakia Greece, France, Germany and Spain condemned by the EJC because of non communication of the plans (France, Germany and Spain have communicated their plans in the meantime) 2 MS (Denmark, Germany), where no significant quantities of PCB equipment is still in operation

PCB outlines (Art. 11) Most MS have sent their collection/disposal outlines to the Commission except for Estonia (unclear if covered by plans under indent 1), Cyprus (not adopted yet?) Malta (PCBs only included in general hazardous waste management plan) Slovenia (incomplete) Slovakia Spain condemned by the ECJ because of non-communication of the outlines

Conclusions POPs concentration limits are most likely set by the end of this semestre Commission study provides assistance to the implementation of the POPs Regulation PCB inventories are mostly established Disposal plans and outlines are still unsatisfactory in a number of MS