Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B

Slides:



Advertisements
Similar presentations
Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Advertisements

FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Setting the flip-flop The normal value of R and S is zero. S (set) = 0 R (reset) = 0 remembered value 1.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
LV power cables for iTOP
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
EE: Servicetype#cablesL avg L tot Costs est [ksfr] LV50mm 2, (1) (US?) EE fibres yellow ribbons US HV (SCEM ) 25 (13+12)
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
1 H C A L HF Cable Plant Options HF Cable Plant Options December 22, 2010 T. Shaw.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Duct numbering for EE- Wolfgang Funk - CERN CMS 12/05/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Calorimeter Mu2e Development electronics Front-end Review
Update of MVD services and requests
Beam
DCS: Temperature Probes
- CT INSTALLATION PROCEDURE OVERVIEW -
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
DCS: Temperature Probes
Cooling pipes and Space for Services
UT Optical Connections
HPS Motherboard Electronic Design
Chamber Design and Integration RE3/1 and RE4/1
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Overview of T1 detector T1 is composed by 2 arms
4x5 SC array for the test beam in Apr 2007
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
Surface Area of a Cylinder
Prepared for CSC by Fred Borcherding FNAL
Presentation transcript:

Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B

Note: N2 of EE is always on top of Dee, sniffer on bottom View towards I.P. for EE+ LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 3*4.3X2 (27) signal 1*9 (64) View from I.P. for EE- CO 1*14 is (314mm**2) CO 1*14 con (154) N2 1*10 (78) OF 15*4.3X2 (129) HV 4*14 (616) Duct 05.A Sum: (1858) P F B ret N2 Duct 06.B Similar to Duct 03.A Note that the EE HV cables are only the indicated size where there is no space problem. The mantle is cut off elsewhere (curves) and saves almost 60% of cross section. Note: N2 of EE is always on top of Dee, sniffer on bottom LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) Duct 05.B P ret Sum: (1960) Duct 06.A Similar to Duct 03.B 09/06/2008 Wolfgang Funk - CERN CMS 2

Wolfgang Funk - CERN CMS 3 LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Duct 04.A Sum: (1987) P ret P F Duct 07.B Similar to Duct 02.A LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) signal 2*9 (128) HV 4*14 (616) CO 1*14 is (314) OF 15*4.3X2 (129) Duct 04.B Sum: (2149) P F Duct 07.A Similar to Duct 02.B 09/06/2008 Wolfgang Funk - CERN CMS 3

Note: FES F is always on upper part of Dee, FES R on lower LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 is (255) CO 1*14 con (154) OF 15*4.3X2 (129) HV 2*14 (308) Duct 03.A OES FES F Sum: (2549) BF BF BF OES BF R Duct 08.B F Similar to Duct 05.A Note: FES F is always on upper part of Dee, FES R on lower LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 3*4.3X2 (27) Signal 1*9 (64) LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) Duct 03.B Sum: (1969) P ret P F Duct 08.A Similar to Duct 05.B 09/06/2008 Wolfgang Funk - CERN CMS 4

Note: PE is only in in 9A-/2B+ for ES and not in 18A-/11B+ LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) Duct 02.A Sum: (2122) P ret P F Duct 09.B Similar to Duct 04.A Note: PE is only in in 9A-/2B+ for ES and not in 18A-/11B+ PE 1*3.6 (10) LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) OF 4*4.3X2 (36) signal 2*9 (128) CO 2*14 is (628) Laser 1*10 (79) OF 15*4.3X2 (129) Co 1*14 (154) MEM 24*2.2 (92) MEM 4*1.5X2 (12) MEM 6*2X10 (120) Duct 02.B Sum: (2340) P F P F ret B ret Duct 09.A Similar to Duct 04.B Note: additional cables between MEM and balconies: Hybrid (5V,2.5V Ving, sensing for all) 2*12.3 (238), OF 2*4.3X2 (18) MEM cables (MEM 24*2.2 (92), MEM 4*1.5X2 (12) and MEM 6*2X10 (120) )are only between MEM and Dees Sum: (2403) 09/06/2008 Wolfgang Funk - CERN CMS 5

CO 1*71 (3960) Duct 01.A Duct 10.B 09/06/2008 Wolfgang Funk - CERN CMS 6

CO 1*71 (3960) Duct 01.B Duct 10.A 09/06/2008 Wolfgang Funk - CERN CMS 7

Wolfgang Funk - CERN CMS 8 LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) OF 5*4.3X2 (45) signal 2*9 (128) CO 2*14 is (628) Co 1*14 (154) HV 4*14 (616) OF 15*4.3X2 (129) Duct 18.A Sum: (2652) P F P F B ret ret Duct 11.B Similar to Duct 16.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) Duct 18.B Sum: (2122) P ret P F Duct 11.A Similar to Duct 16.B 09/06/2008 Wolfgang Funk - CERN CMS 8

Note: FES F is always on upper part of Dee, FES R on lower LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 3*4.3X2 (27) Signal 1*9 (64) LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) Duct 17.A Sum: (1969) P ret P F Duct 12.B Similar to Duct 15.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 con (113) CO 1*14 con (154) OF 15*4.3X2 (129) HV 2*14 (308) Duct 17.B OES FES R OES Sum: (2407) BF BF BF BF R Duct 12.A F Similar to Duct 15.B Note: FES F is always on upper part of Dee, FES R on lower 09/06/2008 Wolfgang Funk - CERN CMS 9

Wolfgang Funk - CERN CMS 10 HV 4*14 (616) CO 1*14 is (314) OF 15*4.3X2 (129) LV1 8*7.4 (344) LV2 8*6.1 ( 240) HV 2*15.3 (368) signal 2*9 (128) Duct 16.A Sum: (2139) P F Duct 13.B Similar to Duct 18.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 5*4.3X2 (45) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Duct 16.B Sum: (1987) P ret P F Duct 13.A Similar to Duct 18.B 09/06/2008 Wolfgang Funk - CERN CMS 10

Note: N2 of EE is always on top of Dee, sniffer on bottom Note: in 14B-/15A+ for ES only LV2 2*6.1 and not 4! whereas in 5B-/6A+ LV2 4*6.1 existent LV1 4*7.4 (172) LV2 4*6.1 (120) OF 2*4.3X2 (18) signal 2*9 (128) LV 10*12.2 (1169) CO 1*14 con (154) Signal 1*10 (79) Duct 15.A P ret Sum: (1840) 14/23 Duct 14.B Similar to Duct 17.A Note: in the ducts 14B-/15A+/5B-/6A+ ES LV1 and ES LV2 all cables run to counting room since used for heating LV1 2*7.4 (86) LV2 2*6.1 (60) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) HV 6*14 (924) OF 15*4.3X2 (129) Sniff 1*10 (78) CO 1*14 is (314mm**2) CO 1*14 con (154) N2/sniff 1*12 (113) Duct 15.B Sum: (2124) P F B ret N2 Duct 14.A sn Similar to Duct 17.B Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter), upper line is N2, lower sniffer Note: N2 of EE is always on top of Dee, sniffer on bottom 09/06/2008 Wolfgang Funk - CERN CMS 11

History New version 14/7/03 to avoid crossing of services at EE patch panel area according to Justin’s proposal of patch panel design of spring ’03: Move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes). Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over ring flange bean. Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings. Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings. Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in 9B-/11A-, no overall cross section increase. New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new “EE-mechatronics’’ design of Tony: 2 more LV EE cables each in ducts 7B-,9B-,11A-,13A- . New version 11/8/03 to increase space in ducts for ES cooling pipes. Move EE backplate return pipes from 10B-/10A- into 9A-/11B- . 09/06/2008 Wolfgang Funk - CERN CMS 12

History(2) New version 23/9/03 to adapt latest version of ES services: Remove one OF from of 9A-. Remove separate LV cables for controls 14A- (are part of standard LV system) New version 03/12/03 to adapt latest version of EE/ES services: One ES unit contains now only one signal- (control) cable instead of 2 with exception of duct 14B-. One ES LV unit contains now of 4*7.4 and 4*6.1 instead of 6*7.4 MEM services adopted to new information EE HV 2*13 mantles/Dee (each has 13/12 coax) replaces single coaxes, changed some positions to equalize filling factors. New version 2/03/04 to adapt latest version of EE/ES services: In 14B- ES now only 2 LV 6.1mm instead of 4 (but not other Dee (5B-), where are still 4) In 14A- ES only 2 LV 6.1mm and 2 LV 7.4mm instead of 4 each before Only 4 signal cables/Quadrant for EE instead of 6 before One more optical fiber in all ducts where there was a fiber for ES (spare) 09/06/2008 Wolfgang Funk - CERN CMS 13

History(3) New version 30/7/04 to adapt latest version of ES/EE services: 4 less OF spares/ Dee than before. Implement 1 OF spare per double MEM Implement 1 protection conductor per ES disk New version 09/06/08 to adapt latest version of ES/EE services: FES Fill always un upper part of each Dee, FES Return always on lower part N2/Sniffer pipes of EE are 10mm OD and only one N2 and sniffer pipe per Dee. 09/06/2008 Wolfgang Funk - CERN CMS 14