Workshop: Preventive Maintenance

Slides:



Advertisements
Similar presentations
International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Advertisements

MBS ROAD MAP Mike Chalk, MBS Manager Phil Goble, CIO.
Price List Utilities.
User Friendly Price Book Maintenance A Family of Enhancements For iSeries 400 DMAS from Copyright I/O International, 2006, 2007, 2008, 2010 Skip Intro.
Microsoft Access.
State of Connecticut Core-CT Project Query 8 hrs Updated 6/06/2006.
ASENT_IMPORT.PPT Importing Data From Templates Last revised 11/03/2009.
People Soft Travel and Expense Advanced Topics
ZIMS With Medical Release 2.0 R2 An overview of the Medical Module in ZIMS 1.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
FLEET User Manual July 1, Part One – User Names & Passwords I.User Names & Passwords A. Creating an Account B. Forgot Password C. Updating .
Workshop: Maintenance Work Requests May 3, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Workshop: PM Structure April 26, Agenda  Introductions  Project Overview  Plant Maintenance Project Timeline  Future Blueprinting Sessions 
Unit Training Management (UTM)
PM Bills of Material Getting the Most Out of BOMs Session 3604
Ed Gray, PE Public Service Electric and Gas
SAP Preventive Maintenance An Overview
The Production Process
The Production Process
SAP R/3 Materials Management Module
SAP Preventive Maintenance An Overview
Module 10 Setup for Production.
ZIMS With Medical Release 2.0 R2 An overview of the Medical Module in ZIMS and how it impacts the Animal Husbandry (R1) Module 1.
Production Planning Processes Theories & Concepts
Enhanced Shipping & Handling A Feature of D-Plus An Enhancement For iSeries 400 DMAS from  Copyright I/O International, 2005 Skip Intro.
Configuring Maximo using RulesManager Michael Tubbs.
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
S9k Preventive Maintenance & Equipment Inventory.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Cash and Cash Management.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
PM_WO_310 Components v41 PM Components PM_WO_310.
Workshop: Measurement Points and Permits
Lorie Stolarchuk Learning Technology Trainer 1 What has changed with the 2.7.X Upgrade to CLEW?
Smart Data OnLine Training
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Enhancements From R6, R7.x to R9 Enterprise Product Data Management (EPDM) David Kemp
eOrders inventory ordering software! Introduction Use easy functions, letting you order products that you need automatically. Use easy functions, letting.
Click Here. Choose Shop Click Here Choose Enter.
PM MD03 – Bill of Materials
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
PREVENTATIVE MAINTENANCE
Capital Asset Management May 14, 2008 Today’s Presenters: Anna Jensen, Director of Auxiliary Accounting, Capital Asset Management, Accounts Receivable,
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Workshop: Timekeeping June 13, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow.
Working Hours Utilities. An easy to use tool that helps maintain your company resources (setup working hours for users, update when facilities and equipment.
IFM APPORTIONMENTS Elisa Vick
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
Dynamics GP Inventory GPUG St. Louis Chapter Meeting Tuesday, September 15 th, Getting more out of your.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Together we can build something great FORWARD | 2016 FSM (Field Service Management) for contractERP Bill Natalie and Tracie Folscroft.
 Tata consultancy services Production Planning WORK CENTERS.
Workshop: Work Completion Process May 16, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
ASENT_RCM.PPT Reliability Centered Maintenance (RCM) Analysis Last revised 01/14/2011.
PantherSoft Financials Smart Internal Billing
MRP: Material Resource Planning
Preventive Maintenance Agreements
Standard Operating Procedure
Standard Operating Procedure
Workshop: Materials Use
Mission SoftTotalQC: Navigating Your Quality Control Concerns
ZIMS With Medical Release 2.0 R2
Order-to-Cash (Project-Based Services) Scenario Overview
Cash and Cash Management
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Product Training Jobs Where “Lean” principles are considered common sense and are implemented with a passion! ©2008 TTW.
Order-to-Cash (Project-Based Services) Scenario Overview
Workshop: High Level Reporting
Workshop: Equipment June 29, 2006.
Presentation transcript:

Workshop: Preventive Maintenance June 20, 2006

Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials Allow enhanced scheduling and planning for work assignments Provide work scheduling as well as management reporting tools Accommodate the use of mobile technology to reduce paperwork Accommodate the use of GIS with SAP Improve automated updates to customers about the status of work Implement a Preventive Maintenance system for buildings, areas, and equipment Utilize standard SAP functionality to collect utility usage and cost information for recharge calculations

Agenda Introduction Discussion of Task Lists Discussion of Maintenance Plans Discussion of Plan Scheduling Preview of Next Blueprinting Session Other Discussion

What is a Task List? A task list is a maintenance procedure. It includes planned labor and materials. There are three types of task lists: General Task Lists Functional Location Task Lists Equipment Task Lists A task list looks very much like a planned order, without dates!

What is a Task List? Why 3 Types? The General Task List is used as a “model” maintenance procedure. The work goes into the procedure planning and then this is copied to specific Functional Location (building, room) and Equipment task lists. A Functional Location task list may ONLY be used for preventive maintenance for that specific functional location. An Equipment Task list may ONLY be used for preventive maintenance for that specific piece of equipment. STOCK materials and labor may be planned on any task list type. NON-STOCK materials, services, and text items from the Equipment or Functional Location BOM may be planned on Equipment or Functional Location Task Lists.

Naming a Task List Functional Location and Equipment task lists have sequentially assigned numbers. The task lists are found using the Equipment or Functional Locations. General Task lists may have either numbers assigned by SAP or may have alphanumeric names. The length of the name field is 8 characters. (This may be useful for Medical Center WHUPOS).

Creating a General Task List There are separate transactions for Functional Location, Equipment, and General Task Lists.

Creating a General Task List This task list is being given the name “TEST0613,” rather than allowing SAP to assign a name.

Creating a General Task List The task list is given a description and default work center.

Creating a General Task List A short description, labor estimate, number of workers is entered.

Creating a General Task List As much long text as is required may be added. This is copied to the work order when it is created.

Creating a General Task List A stock part is added and the task list is saved.

Creating an Equipment Task List

Creating an Equipment Task List The equipment number is the “name” of the task list.

Creating an Equipment Task List A task list already exists for this equipment. Select “+” to add another.

Creating an Equipment Task List A description and default work center are entered.

Creating an Equipment Task List A description for the operation, the labor, and number of workers is entered.

Creating an Equipment Task List From the component screen, the Component Selection button is chosen to select parts from the Bill of Material.

Creating an Equipment Task List As many parts as are appropriate are selected.

Creating an Equipment Task List Notice that stock, non-stock, and text items may be chosen from the BOM. The Functional Location Task List is similar to the Equipment Task List.

What is a Maintenance Plan? A maintenance plan associates: A Task List An object to be maintained Functional Location Task List A maintenance cycle Some parameters around order creation

Creating a Maintenance Plan This example will create a simple “single-cycle” maintenance plan based on the calendar (rather than a measurement point).

Creating a Maintenance Plan There are also “strategy” and “multiple counter” maintenance plans.

Creating a Maintenance Plan SAP may assign a number or one may be entered. This is a 12 character alphanumeric field.

Creating a Maintenance Plan

Creating a Maintenance Plan

Creating a Maintenance Plan The “Call Horizon” determines how far into the maintenance cycle the order should be generated. This is a monthly plan, so 90% will generate the order 3 days before it is due. The “Time-Key Date” tells SAP to generate the order on the same day each month (rather than every 30 days).

Scheduling a Maintenance Plan Creating the Maintenance Plan assigns a cycle and some order parameters. Scheduling start this plan running to create orders.

Scheduling a Maintenance Plan Enter the plan number.

Scheduling a Maintenance Plan Notice that no scheduling has been done.

Scheduling a Maintenance Plan Click “Start”. SAP suggests the current date to start the plan. Note: The first order is created at the END of the cycle. (If you want an order from a monthly plan tomorrow, start it 29 days in the past.)

Scheduling a Maintenance Plan The first order will be created with a start date of 6/14/2006.

Topics For Next Blueprinting Session Determine High Level Reporting Requirements Please bring your thoughts on current reports which are used frequently in your area.