Dan Packer CM Option Introduction Existing Buildings and Systems

Slides:



Advertisements
Similar presentations
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
Advertisements

Virtual Engineering Lab Faculty of Engineering – Cairo University Construction Management Applications January 11 th 2010.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Dan Packer Construction Management Senior Thesis April 16, 2002
An-Najah National University Graduating project II Delay in construction projects.
EXAMPLE – Quality Control Plan For Consultants
Welcome to Course title goes here Your Logo. Introduction.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
King Fahd University of Petroleum & Minerals
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
TM Research & Development CONFIDENTIAL PROJECT CHANGE REQUEST Project Title: Project Code: Project Manager : Technical Leader: Project Custodian:
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
Around the World on My Birthday
Dr. Susan Codone Mercer University Multimedia Conversion of Room 203 Mickey Mouse, Donald Duck, Hilary Duff, & Brittany Spears December 2, 2004.
Presentation Outline Project Background Project Overview Industry Research: AIA 2030 Challenge and It’s Significance in Renovations Breadth #1: Redesign.
Title Name Teacher’s Last name - # Hour Date Due.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
The Katzen Arts Center Washington, D.C. The Katzen Arts Center Washington, D.C. Introduction LEED Certification Analysis Excavation Support System Analysis.
Process – Stroke Repertoire Observation Schedule 2 sets against opponent of equal ability Full court singles Observer watched my performance and marked.
Research topic here Name Surname Faculty Research Proposal CS10A0862 INTRODUCTION TO RESEARCH METHODS.
Click to edit Master title style Planning and Designing a Lean Manufacturing Facility.
 HCS 446 Week 1 Discussion Question 1  HCS 446 Week 1 Discussion Question 2  HCS 446 Week 1 Individual Assignment Facility Planning - Part I  HCS.
Geoscience and Remote Sensing Society Slide 1 GRSS Web Site Tools for Chapters Leland Pierce, GRSS Webmaster GRSS Chapter Chairs Meeting Beijing, China,
Chapter 4 Assessment.
Welcome to Scottish Improvement Skills
PROJECT COST MODEL 2 – NEW DRIGGS AND VICTOR K-3 SCHOOLS AND RENOVATE EXISTING FACILITIES 1Construction costs based on most recent national and regional.
Waunakee Public Library
PROJECT CHANGE REQUEST
A Design Process Introduction © 2011 Project Lead The Way, Inc.
Development of a FLC Model for Predicting Schedule Impacted by Change Orders in Construction Projects Jieh-Haur Chen Dec
A Prospectus To The Investors
Author name(s) Affiliation
Sample Presentation. Slide 1 Info Slide 2 Info.
Information Session Name of Program Year.
TECHjOSH.COM TechJosh.com.
Create a 10 slides powerpoint presentation of the history of 10 social media sites Create a 10 slides powerpoint presentation of the different founder.
LONGWOOD AT OAKMONT HEALTHCARE CENTER
What Will You Learn 1. How To Plan Projects
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Multimedia Conversion of Room 203
the Franklin Square Hospital Center
HELLO THERE. THIS IS A TEST SLIDE SLIDE NUMBER 1.
Introduction Foundation Re-design Analysis
Construction Management Option
  30 A 30 B 30 C 30 D 30 E 77 TOTALS ORIGINAL COUNT CURRENT COUNT
Knowledge Transfer Partnership 2018
Coppin State University
EFFECTIVE PRESENTATION STRATEGIES
Instructions: PLEASE DELETE BEFORE PRESENTATION
Placeholder for cueing video (Dan Maas animation as sendoff) and break between slides that may help with some FAQs.
Tri-Valley Jr./Sr. High School Hegins, PA
DBIA Manual of Practice
Capital Project Update
Sandy Grove Middle School
Project Name Presented by: Name of presenter
Presentation Structures
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Title Slide: Provide a Title for your Presentation
PLEASE READ ME FIRST Dear Cad Students and Parents,
Difference between 3 COF and 6 COF Open cells in 22” Segment
World History: Final Project
Your I-search Presentation
Kuwait Airways Ticket Cancellation Policy
Chapter 2 – Review ‘construction management’
Essential question or topic
Presentation transcript:

Dan Packer CM Option Introduction Existing Buildings and Systems Structural Redesign Site Planning & 2.5D CAD Wrap Up Dan Packer, EIT Construction Option This slide will contain info on the school and its history - Original Design details - Reasons for detailed site planning Results on schedule, budget Usefulness of 2.5D CAD William Penn Charter Middle School & Site Renovations This slide will contain info on the schools existing facilities - Original Design details - Get familiar with site Thanks to Intech Construction Thanks to faculty Outline Existing Conditions Structural Redesign Site Planning & 2.5D CAD Wrap Up This slide will talk about what the project entails - Reasons for redesign - 2.5D CAD layout and video footage QUESTIONS ?? - What the redesign entailed - Reaction from owner and Contractor on usefulness of site planning and visualization tool Dan Packer CM Option *** Note that information may be on different slides but due to lack of room for outline they appear on the same slide Results Costs Schedule Impacts Conclusions Conclusions on Site planning and 2.5D CAD