2026 CCTA Criteria Filter Results

Slides:



Advertisements
Similar presentations
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Advertisements

Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
High-Quality Supplemental Educational Services And After-School Partnerships Demonstration Program (CFDA Number: ) CLOSING DATE: August 12, 2008.
RPCG – CCTA Process Vijay Satyal & Colby Johnson Reliability Planning & System Adequacy April 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Topics to Cover Interconnection Process Overview
1 Quality Control Review of E3 Calculator Inputs Comparison to DEER Database Brian Horii Energy and Environmental Economics, Inc. November 16, 2006.
Agenda Topics • Overview of the accounting cycle from e-doc creation to decision support Components of the accounting cycle (ledger attributes, back office.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Introduction to Standard Reports. Standard Reports 2 How to get information out of AQS Standard Reports Site / Monitor Metadata Detail Data Reports “
Monitoring the MDGs A catalogue of procedures and an assessment of statistical capacity Part 1: International study.
Presentation to HAUC (UK) Wednesday 30 May 2012 RINA London.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
October 28, 2015 Reports Tab. Lesson Overview: Reports Tab  In this lesson we will cover:  Sub Office Management Reports  Support Site Links  Links.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Thank You for Taking a Guided Tour of The Dealer Advantage On-line System.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Beneficiary data are imported from your proposal.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
ESI/SPP Seams Agreement Implementation Update Transmission Planning Summit August 11, 2010.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
Arizona Western College Assessment Workshop 2 Workshop Objectives Enter collected evidence of assessments and notate the findings in your assessment plan.
CCTA Process Review TAS Update – Feb 12th 2016
INNOVATIVE ACTIONS UNDER THE ERDF REGIONAL PROGRAMME OF INNOVATIVE ACTIONS ENtrepreneurship Through Innovation in Epirus “ENTI”
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS & TEPPC Update CCTA Assumptions Vijay Satyal - RPCG Liaison, Sr. Policy Analyst & Colby Johnson - Associate Engineer, SAP W ESTERN E LECTRICITY.
Conditional IRB Approval
Southwest Power Pool, Inc.
Arizona Western College Assessment for Administrative Departments Part 2 Workshop Objectives Enter collected evidence of assessments and notate the findings.
Document Evaluation Process May 2005 Revision
INTERNATIONAL PUBLIC TENDER:
Transmission Planning Update October 20, 2010
1. Open any Office 2016 app, such as Word, and create a new document.
TAS & TEPPC Update CCTA Assumptions
Deliverability Maps for 2017 Peaking Capacity RFP
Arizona Western College Assessment Workshop 2
Quality Workshop The Local Council Award Scheme is a great guide for good practice in our sector and a way for councils to build confidence in their.
The Effect of Construction on Local Businesses: Interim Project Update
Merrill Brimhall – Engineer, Staff
Planning Tools Overview
2018 Loads and Resources Data Request Part 2
New England Resource Adequacy
2026 CCTA Criteria Filter Results
Planning Committee- Map
Western Electricity Coordinating Council
Energy Performance Trends
NEF Negotiation forms IT tool to support Negotiation (Participant Portal) Call FP7-ENV-2013-WATER-INNO-DEMO.
CCTA Process Review TAS Update – Feb 12th 2016
PCM (Production Cost Model) Data Work Group Webinar
Manual Water Ski Directory
2018 State of the Interconnection Overview
2018 WECC Loads and Resources Data Request Part 2
RPCG – 2026 CCTA Results and Next Steps
Planning Tools Overview
ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates
PCM (Production Cost Model) Data Work Group Webinar
2018 WECC Loads and Resources Data Request Part 1
Western Electricity Coordinating Council
2018 Loads and Resources Data Request Part 2
Beth Soholt Director Wind on the Wires
RPCG – CCTA Process Overview
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
westernsydney.edu.au/reviewofgrade
and Forecasting Resources
Common Case Transmission Assumptions
Presentation transcript:

2026 CCTA Criteria Filter Results Colby Johnson, Associate Engineer Western Electricity Coordinating Council

Western Electricity Coordinating Council Overview Criteria Run-Through List of Projects at each criteria Projects that meet Criteria 1&2 To be included in 2026 CCTA Projects that meet Criteria 3, 4, or 5 Projects for RPCG review Western Electricity Coordinating Council

Criteria 1: Regional Significance Starting Point Updates made to various projects Raw Project Information Portal data Criteria 1: Regional Significance Voltage-based; 200 kV and up Apply Filtering No sub 200 kV projects noted All projects in list meet Criteria 1 Number of Projects at Step 1: 67 Next Step Filter through Criteria 2 … Western Electricity Coordinating Council

Criteria 2: Under Construction Starting Point 67 projects which met Criteria 1 Criteria 2: Under Construction How many of the 67 are under construction? Apply Filtering 9 of 67 are under construction 4 of 9 are complete/in-service 5 of 9 to be complete within 1 year These 9 Projects Enter 2026 CCTA These projects were also included on 2024 CCTA Next Step Move to Criteria 3 Western Electricity Coordinating Council

Criteria 3: Financial Commitment Starting Point 67 projects which met Criteria 1 Criteria 3: Financial Commitment How many of the 67 are not under construction, but do have financial commitment? Apply Filtering 14 projects meet Criteria 3 Next Step Move to Criteria 4 Western Electricity Coordinating Council

Criteria 4: Implementation Factors Starting Point 14 projects which met Criteria 3 Criteria 4: Implementation Factor How many of the 14 require an EIS or similar? Apply Filtering 8 projects meet Criteria 4 6 projects no implementation data Next Step Move to Criteria 5 Western Electricity Coordinating Council

Criteria 5: Dependency Check Starting Point 13 projects which met Criteria 4 Criteria 5: Dependency Check How many of the 13 are dependent on another project Apply Filtering 1 dependent project Next Step RPCG Final Review Western Electricity Coordinating Council

Regionally Significant & Under Construction CCTA All projects were included in 2024 CCTA Western Electricity Coordinating Council

Remaining Projects (Criteria 3-4) Included on 2024 CCTA: Boardman-Hemingway Gateway West (Seg. D) Wallula to McNary Central Ferry – Lower Monumental Morgan – Sun Valley Assume to include in 2026 CCTA Nine new-to-2026 transmission projects for review Western Electricity Coordinating Council

Projects for RPCG Review CCTA RPCG Review Not CCTA Talega-Escondido – No further information Wallula to McNary – estimated in-service date 2017 Abel Ball – estimated in-service date 2020 Tres Amigas was excluded for 2024 due to Insufficient demonstration of financial commitment There is inadequate contractual documentation specifying the buyer or identified customers responsible to bear the costs of the project. New to 2026 Process Western Electricity Coordinating Council

CCTA Not CCTA Criteria 1 No Yes Criteria 2 Criteria 3 Yes No No Yes Regional Significance No Project A Project … Project Z Yes Criteria 2 Under Construction Criteria 3 Financial Indicators Yes No No Yes Criteria 4 Implement. Indicators Yes No Passed RPCG Screen Criteria 5 Dependency Check N/A No CCTA Yes Not CCTA Western Electricity Coordinating Council

System Adequacy Planning Western Electricity Coordinating Council Contact Information Colby Johnson System Adequacy Planning Western Electricity Coordinating Council Office: (801)819-7662 cjohnson@wecc.biz Western Electricity Coordinating Council