Building A Northeast RTO: A Measured Approach

Slides:



Advertisements
Similar presentations
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Advertisements

Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Roadmap for Sourcing Decision Review Board (DRB)
Transmission Independence and Investment Pricing Policy for Efficient Operation and Expansion of the Transmission Grid FERC Docket Nos. AD and.
ERCOT: A Work In Progress Board of Directors Austin, TX July 16, 2002.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Roger Urwin, Chief Executive Officer National Grid Group plc EEI Conference 18 February 2002.
Towards Regional Independent Operators – a main driver for successful market integration.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
The Continuing Evolution of U.S. Electricity Markets
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
The Council of State Governments Eastern Regional Conference Gordon van Welie, President and CEO, ISO New England August 16, 2010 Portland, Maine.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
Overview of WECC and Regulatory Structure
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Federal Energy Regulatory Commission Role Of The Market Monitor: ISO New England Dr. Hung-po Chao Director, Market Monitoring FERC Open Meeting Washington,
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
Milestones or Millstones Alex R. Burkart, Deputy Director Office of Nuclear Energy, Safety and Security United States Department of State.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
The Marine Stewardship Council: A Multi- Stakeholder Fisheries Assessment Programme for Sustainable Fisheries Oluyemisi Oloruntuyi (MSC)
FERC Staff’s Report on Demand Response and Advanced Metering.
Monterey Plaza Hotel October 8-10, 2007
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
Introduction to Software Project Management Lecture1.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 14, 2009 Eric Winkler, Ph.D. Project.
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
Mountain West Transmission Group
Regional Assessment Network Meeting
Overview of Project Planning
New England States Committee on Electricity (NESCOE)
Regional Transmission Organizations
Massachusetts Electric Restructuring Roundtable
Regional Assessment Network Meeting
Massachusetts Electric Restructuring Roundtable
The Future of Demand Response in New England
Audit Planning Presentation - Disaster Recovery Plan
FERC Order 1000 One Transmission Owner’s Perspective
A Training Design Tool for Stakeholders Tasked with Evaluating New and Innovative Treatment Technologies for Small Drinking Water Systems Be sure to type.
By Jeff Burklo, Director
Benefits of New England’s Proposed Capacity Market
New England Resource Adequacy
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Comments on Regional State Committee Proposal
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Special MRC – Fuel Security
Vice President, Markets Development
Alternative ICAP Proposal
Northeast Regional Greenhouse Gas Initiative
Update on Energy Imbalance Market
Bringing Power from the North
Bringing Power from the North
Gordon van Welie, President & Chief Executive Officer
Natural Gas and Electricity Interface Challenges in New England
Comments on New England Regional State Committee*
Winter Reliability Program Updated
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
New England’s Response to FERC’s RTO Order No. 2000
Presentation transcript:

Building A Northeast RTO: A Measured Approach ISO New England Inc. October 2001 Building A Northeast RTO: A Measured Approach Gordon van Welie President and Chief Executive Officer ISO New England Inc. Massachusetts Restructuring Roundtable • October 19, 2001 http://www.iso-ne.com

Background FERC issued an order on July 12, 2001 to create a Northeastern regional transmission organization (RTO) 45-day mediation process initiated before FERC administrative law judge to develop RTO business plan Mediation ended Sept. 7 – administrative law judge made recommendations to FERC on Sept. 17 “RTO Week” - October 15-19 Order expected on October 24

What FERC’s order would create A multi-regional wholesale electric power market for the Northeastern U.S. Combine existing markets in PJM, New York and New England: 14 states and D.C. Produce the world’s largest wholesale power market, with 20%+ of U.S. population $20 billion+ market with 140 gigawatts of installed generating capacity Northeast RTO

Building an RTO FERC’s Goal ISO New England Inc. October 2001 Building an RTO FERC’s Goal Build a single Northeastern power market based on the PJM design and incorporating best practices from NY, New England. The Challenge Balance the goal of a quick transition to the new market with the need to manage the risks inherent in such a large and complex undertaking. http://www.iso-ne.com

Considerations in Creating an RTO The process for creating an RTO should: Be realistic and achievable Ensure an orderly, effective transition from the three existing markets while safeguarding current systems and reliability Strike a balance between expeditious implementation and common-sense management of the risk inherent in new markets, new technologies, and the merger of three “high-tech” companies Incorporate stakeholder input

ISO-NE’s Recommended Approach Establish a new RTO board with a “balanced” governance model Develop and implement an approved plan Planning phase (~1 year) Implementation phase (~2 years) Employ best practices for design and implementation Utilize risk management

Establish New RTO Board and Governance Prompt establishment of a new organization and board of directors Full independence from market participants and software vendors Equal representation from existing ISOs

Phase 1: Planning – Key Tasks Develop RTO market rules Define RTO architecture and operating criteria (including appropriate accommodation for an ITC) Define business practices Form implementation teams Technical feasibility assessment

Phase 2 – System and Market Implementation System procurement On-site integration Data conversion Technical audit Training Cut-over

Benefits of a Two-Phase Approach Identifies and resolves key issues first Manages and mitigates risks Ensures appropriate consideration of best practices from New York and New England Enhances cooperation between existing ISOs and the new regional RTO Provides stability during transition period

Alternative Approaches to Building a Single Northeastern Market ISO New England Inc. October 2001 Alternative Approaches to Building a Single Northeastern Market Create the RTO, define the implementation timeframe and let management immediately proceed with implementation “Management works out the details” Create the RTO, define the implementation timeframe and let management immediately proceed with implementation “Management works out the details” Create the RTO and ensure that a viable implementation plan has been developed and approved before starting implementation “Management executes an approved plan” Create the RTO and ensure that a viable implementation plan has been developed and approved before starting implementation “Management executes an approved plan” The second approach, embodied in ISO New England’s proposed plan, is the prudent way to proceed http://www.iso-ne.com

Benefits of ISO New England Approach ISO New England’s approach: Uses best practices to ensure success Ensures that a realistic scope, schedule and cost are determined up front Ensures maximum possible risk mitigation Provides a way to manage potential conflicts – such as resource allocation between existing ISOs and new RTO Provides controls, checkpoints and a structured, measured transition that safeguards reliability

Security, Reliability, and RTOs Security of electricity infrastructure is part of grid reliability equation RTO formation must feature alternate control centers and fail-over/redundancy to support grid reliability and integrity of the power supply ‘Hardened’ facilities may be indicated Communications/computer systems Located away from other risks

Questions?