on behalf of Barrel RPC Collaboration

Slides:



Advertisements
Similar presentations
Bologna Fabrizio Odorici - INFN Bologna DT Sector Collector LVDS link: - 2 Ethernet cables/minicrate FTP cat.6 - TX 480 Mbps (< 50 m),
Advertisements

1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Sept 25, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
12th Workshop on Electronics for LHC and Future Experiments Valencia Sept F. Loddo I.N.F.N. Bari An RPC-Based Technical Trigger for the CMS.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
GPL Board Pattern Generator for the Level-0 Decision Unit Hervé Chanal, Rémi Cornat, Emmanuel Delage, Olivier Deschamps, Julien Laubser, Jacques Lecoq,
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
CMS Drift Tubes Gruppi di Bologna, Padova, Torino G.M. Dallavalle
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
F. Odorici - INFN Bologna
Work on Muon System TDR - in progress Word -> Latex ?
DAQ and TTC Integration For MicroTCA in CMS
The Totem trigger architecture The LONEG firmware archtecture
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
The Ohio State University
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
CMS November Upgrade Week
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
HCAL Data Concentrator Production Status
The University of Chicago
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
DT Consolidation Summary
Jan Królikowski Warsaw University
MicroTCA Common Platform For CMS Working Group
14-BIT Custom ADC Board JParc-K Collaboration Meeting
RPC HV&LV systems Introduction Detector description Requirements
Front-end electronic system for large area photomultipliers readout
Current Status of CSC Trigger Elements – Quick Summary
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
CSC Trigger Muon Port Card & Sector Processor in production
RPC Front End Electronics
RPC Detector Control System
RPC Detector Control System
Test of Link and Control Boards with LHC like beam, CERN, May 2003
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC Front End Electronics
The CMS Tracking Readout and Front End Driver Testing
Resistive Plate Chambers performance with Cosmic Rays
RPC HV-LV project Introduction System requirements and description
DCM II DCM II system Status Chain test Schedule.
RPC Electronics Overall system diagram Current status At detector
Pierluigi Paolucci & Giovanni Polese
Digitally subtracted pulse between
PHENIX forward trigger review
The Trigger Control System of the CMS Level-1 Trigger
FED Design and EMU-to-DAQ Test
Presentation transcript:

on behalf of Barrel RPC Collaboration RPC Technical Trigger Flavio Loddo I.N.F.N. Bari on behalf of Barrel RPC Collaboration CMS Week 14-16 March 2005 F. Loddo INFN-Bari

CMS Week 14-16 March 2005 F. Loddo INFN-Bari RPC Technical Trigger Phase I: Sector Trigger for testing RPC (and DT) during Commissioning RBC (RPC Balcony Collector) RPC Cosmic trigger Phase II: Technical trigger to be used during off-beam periods for RPC (and other detectors) calibration RBC + TTU (Technical Trigger Unit) CMS Week 14-16 March 2005 F. Loddo INFN-Bari

Block Diagram of RPC DAQ CMS Week 14-16 March 2005 F. Loddo INFN-Bari

RPC LBBox In Barrel LBBox it is unused It can provide the OR of 96 strips (half RPC) CMS Week 14-16 March 2005 F. Loddo INFN-Bari

Phase I: RBC (RPC Balcony Collector) Main Features Generic Barrel Sector Receive 2x13 (or 15) ORs from LB (LVDS) (OR of 96 strips (1 bi-gap = half RPC)) Produce Sector Trigger Mask noisy/dead Ors Force selected ORs to be in the coincidence to increase trigger selectivity Majority level selectable between 1 and 6 I2C Interface Re-Transmit input OR electrically (LVDS) to TDC Transmit input OR optically to Counting Room (GOL) RB4 RB3 RB2_OUT RB2_IN RB1_OUT RB1_IN CMS Week 14-16 March 2005 F. Loddo INFN-Bari

CMS Week 14-16 March 2005 F. Loddo INFN-Bari RBC Block Diagram CMOS-LVDS Driver FPGA (Spartan IIE) to TDC LVDS-CMOS converter 13 (15) ORs Programmable Majority Logic From 2 LBBoxes Trigger 1 (2 sectors) 13 (15) ORs Trigger 2 Controller GOL Reconf HFE4383 ( Reconfigure FPGA every ~ 5 mins to recover eventual SEU loss of configuration) to Optical PP QPLL Deskewed HF clock I2C (from CB) 1 RBC per 2 sectors 6 RBC/Wheel 30 RBC/Barrel 40 MHz LHC Clock (from LB) CMS Week 14-16 March 2005 F. Loddo INFN-Bari

CMS Week 14-16 March 2005 F. Loddo INFN-Bari RBC Status FPGA design is under development. What was done: I2C Interface Masking and Forcing feature Trigger generation (but I’m waiting for further input/suggestions from Users) Still to do: GOL management Board design ……………. ……………. Open issues: Board location Fibers routing and patch panels INFN Financial approval ……. CMS Week 14-16 March 2005 F. Loddo INFN-Bari

Phase !!: RPC Technical Trigger Implementation USC area UXC area TTU VME Crate LBBox RBC LBBox RBC 1 RBC/ 2 sectors Fiber Receiving panel Barrel Wheel 10 Optical Ribbons 1 Optical Ribbon/Half wheel CMS Week 14-16 March 2005 F. Loddo INFN-Bari

TTU (Technical Trigger Unit) Block Diagram (Preliminary) Receive optical link from RBCs Combine ORs from 1 Wheel (or from Half Wheel) …………………….. Programmable Majority Unit TLK2501 TLK2501 Trigger TLK2501 TLK2501 6x16 bit data TLK2501 HFBR782 6x16 bit data 6 Fibers Deskewed HF clock VME Interface QPLL TTCrx Comm. line LHC Clock CMS Week 14-16 March 2005 F. Loddo INFN-Bari

CMS Week 14-16 March 2005 F. Loddo INFN-Bari Cost Estimation RBC: QPLL+GOL+VCSEL ~ 100,00 € FPGA ~ 100,00 € PCB ~ 300,00 € Various ~ 100,00 € NRE ~1000,00 € Tot (30 RBC) ~20.000,00 € Fibers (6000 m) ~ 6000,00 € 5 TTU: ~ 15000,00 € 1 VME crate: ~ 5000,00 € 1 VME controller (V2728): ~3000,00 € CMS Week 14-16 March 2005 F. Loddo INFN-Bari