IT1 We will calculate the three rates included in the Overall Equipment Efficiency rate taking into account the information included in the problem. The.

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

Total Productive Maintenance
Flow Rate and Capacity Analysis
Chapter 4 Quality Assurance in Context
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 1 1 Disciplined Software Engineering Lecture #7 Software Engineering.
Management: Analysis and Decision Making
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
Total Productive Maintenance (TPM)
TOTAL PRODUCTIVE MAINTENANCE
ABB Reliability Fingerprint
1/32 Equipment Efficiency: Quality and Poka-Yoke (Mistake- Proof, 防錯法 ) Operations Analysis and Improvement 2010 Fall Dr. Tai-Yue Wang Industrial and Information.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Chapter 8: Quality Management Project Quality Management
Chapter 6, Process-Flow Analysis
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Overall Equipment Effectiveness
Just-In-Time & Lean Systems
LEAN system.
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
1 CHAPTER 18 MODERN DEVELOPMENTS IN MANAGING OPERATIONS.
Chapter 12 Recursion, Complexity, and Searching and Sorting
Creating Effort Driven Schedules.  Objectives Understanding Your Job and the Tools Job Understanding Task Types Six Steps to an Effort Driven Project.
Total Productive Maintenance (TPM)
Assembly Line Balancing
Standard Costing and Variance Analysis
11 Grouping of mainteance activities Jørn Vatn, NTNU.
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
ALSARHANI YAHYA 1 Cost Behavior CH 3. ALSARHANI YAHYA 2  The cost behavior meaning : what is the way for changing the cost element. When the level of.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Introduction to OEE (Overall Equipment Effectiveness)
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Charles Brassard, P. Eng., M.B.A. President of Laubrass Inc. Measuring Effective Work Performance MUWG Workshop MAXIMO Utility Working Group.
Why Measure?. What Would You Do First? What Would You Do First?
PRODUCTION PLANNING AND CONTROL (PPC). PLANNING CONTROL CONTROL PRODUCTION.
Equipment Efficiency: Availability, Quality and SMED
Training Course on Integrated Management System for Regulatory Body
Equipment Efficiency: Quality and Poka-Yoke (Mistake-Proof, 防錯法)
EGR 2201 Unit 6 Theorems: Thevenin’s, Norton’s, Maximum Power Transfer
More about Equations (2)
Regression Analysis Part D Model Building
Content * Overview * Project overall * PF meter * Calculation of firing angle * Generation of firing angle * Results * Comparison * Problems.
Introduction Operations Analysis and Improvement 2017 Spring
IENG 451 / 452 Stability: Total Productive Maintenance
TOTAL Productive MAINTENANCE
Training Module OEE 1.
Root cause analysis.
Chapter 2: Cost Concepts and Design Economics
Just-In-Time and Lean Production
Algorithm An algorithm is a finite set of steps required to solve a problem. An algorithm must have following properties: Input: An algorithm must have.
Principles of Accounting 2002e
Fundamental Cornerstones of Managerial Accounting Chapter Six
Standard Costing and Variance Analysis
Total Productive Maintenance © Imants
Service for increased productivity
Quality Management Lecture 9 1/2/2019.
Chapter 2: Cost Concepts and Design Economics
PULSE PROTOCOL – P3 GROUP NUMBER: DELIVERABLES DELIVERABLES FOR P3
Applications of Percent
Chapter 2: Cost Concepts and Design Economics
Service for increased productivity
Chapter 2: Cost Concepts and Design Economics
OVERALL EQUIPMENT EFFECTIVENESS (O E E)
Basic Concepts of Algorithm
Chapter 2: Cost Concepts and Design Economics
Capacity Planning For Products and Services
LEAN Principles Total Productive Maintenance (TPM)
Presentation transcript:

IT1 We will calculate the three rates included in the Overall Equipment Efficiency rate taking into account the information included in the problem. The first step would be improve Quality rate analyzing the defects source.

IT2 The problem is very similar (almost identical) to the Problem nº IT1.The only difference is that the production corresponds to the total production instead of the correct production. We will calculate the three rates included in the Overall Equipment Efficiency rate taking into account the information included in the problem. The first step would be improving Performance rate analyzing the working cycle and the idle time sources.

IT3 The problem is very similar “almost identical” to the Problem nº IT2.The only difference is that there is a 8 hours planned stop. As a result, the load time decreases. We will calculate the three rates included in the Overall Equipment Efficiency rate taking into account the information included in the problem. The first step would be improving Quality rate analyzing the defects source.

Calendar time = 10 days · 8 h = 80 h IT4 First step: consists on transforming the problem data into the variables included in the OEE formula. Then, the OEE rates in both situations (BEFORE and AFTER) can be calculated. Calendar time = 10 days · 8 h = 80 h BEFORE Planned stops 6 hours Load time = 80 – 6 h operating time 400 defects breakdown = 4 h setup = 6 h 20.280 units (2.800 u/d theoretical)

Calendar time = 10 days · 8 h = 80 h IT4. cont Calendar time = 10 days · 8 h = 80 h AFTER Planned stops 6 hours Load time = 80 – 6 h operating time 100 defects breakdown = 5 h setup = 6 h 20.100 units (2.800 u/d theoretical) The figure shows how SMED methodology has not changed the breakdown and the setup time. However, the number of defects do change. Before explaining SMED effects we will calculate the OEE rate. OEE rate has hardly changed, but this does not means that the SMED has been inefficient. The result is coherent with SMED methodology, as can be seen in the SMED chapter. SMED can be applied to achieve flexibility. As a result, the setup total time does not vary but, the time of each change decreases and the Availability rate does not vary. SMED methodology eliminates testing procedures and adjustments. As a result, the defects produced in these steps are reduced or eliminated.

Calendar time = 10 days · 24 h = 240 h IT5 Calendar time = 10 days · 24 h = 240 h BEFORE Load time = 240 h planned stops 0 hours Operating time First step: consists on transforming the problem data into the elements included in the OEE formula. Then, the OEE rates in both situations (BEFORE and AFTER) can be calculated. 100+150+…+200 = 1.470 defects breakdowns = 2+5+2+3 = 12 h setups = 2+1+2+2+2+3+4 = 16 h 12.000+13.280+…+11.700 = 124.680 units (14.500 u/d theoretical)

Calendar time = 10 days · 24 h = 240 h IT5. cont The OEE rate has decreased. Productivity has increased, that is to say, it is possible to produce more parts in a working day. Quality and Availability hardly vary. Nevertheless, idle time increases. As a consequence, performance rate decreases as well as the OEE rate. 200+250+…+180 = 1.875 defects breakdowns = 3+4+4+1 = 12 h setups = 3+2+2+3+2+2+2 = 16 h 15.000+13.200+…+14.900 = 146.200 units (20.000 u/d theoretical) Calendar time = 10 days · 24 h = 240 h Load time = 240 h planned stops 0 hours Operating time

Calendar time = 10 days · 24 h = 240 h IT6 First step: consists on transforming the problem data into the elements included in the OEE formula. Then, the OEE rates in both situations (BEFORE and AFTER) can be calculated. Calendar time = 10 days · 24 h = 240 h BEFORE planned stops 0 hours Load time = 240 h Operating time breakdowns = 3+1+2+1+1+2+5 = 15 h setups = 4+4+4= 12 h 6+7+…+3 = 45 defects 88+70+78+…+79 = 773 units (90 u/d theoretical)

Calendar time = 10 days · 24 h = 240 h IT6. cont Calendar time = 10 days · 24 h = 240 h planned stops 20 hours Load time = 220 h Operating time breakdowns = 1+2+3 = 6 h setups = 4+4+4 = 12 h 5+8+…+7 = 42 defects 77+72+…+75 = 755 units (90 u/d theoretical) The OEE rate has increased. Regardless of the increment of the OEE rate, total production has decreased. As a consequence, planned stops must be reanalyzed to reduce the maintenance time. For example, maintenance task can be studied in order to improve the way they are executed.

Calendar time = 10 days · 24 h = 240 h IT7 First step: consists on transforming the problem data into the elements included in the OEE formula. Then, the OEE rates in both situations (BEFORE and AFTER) can be calculated. Calendar time = 10 days · 24 h = 240 h BEFORE planned stops 0 hours Load time = 240 h Operating time breakdowns = 2+5+3+6 = 16 h setups = 3+3+3 = 9 h 7+6+…+6 =55 defects 70+65+…+67 = 713 units (90 u/d theoretical)

Calendar time = 10 days · 24 h = 240 h IT7. cont Calendar time = 10 days · 24 h = 240 h planned stops 0 hours Load time = 240 h Operating time breakdowns = 3+4+1+7+1 = 16 h setups = 3+3+3= 9 h 16+14+…+2 = 83 defects 81+70+…+69 = 725 units (90 u/d theoretical) The OEE rate has decreased. Quality rate has decreased… It seems to be a non effective solution… According to the theoretical chapter, when applying source inspection and Poke-yoke strategies, the defect rate will increase because many of the process defects that went undiscovered previously are going to be detected.

IT8 The problem is very similar “almost identical” to the Problem nº IT2.The only difference is that there is a rework, which allows recovering some units. We will calculate the three rates included in the Overall Equipment Efficiency rate taking into account the information included in the problem. The first step would be improving Quality rate analyzing the defects source.