Wakulla County Airport

Slides:



Advertisements
Similar presentations
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Advertisements

Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
1 Planning and Environment Linkages: Case Studies Michael Culp and John Humeston FHWA November 2, 2006.
Environmental Assessment Public Meeting
Atlin/Taku Land Use Planning Update Presentation to Multiparty Workshop #4 June 19, 2009.
San Dieguito Wetland Restoration Update on Progress by SCE June 3, 2004.
Wetland Planning Requirements, Tools & Processes.
Moving towards a more comprehensive planning SEA and indicators Per Christensen Aalborg University Denmark.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
State of the Department ABET 2000 Update Presentation to External Review Board October 19, 2001.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
1 WASTE TIRE PROGRAM Utilities Department Orange County Board of County Commissioners January 14, 2014.
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Presentation Outline Summary of efforts-to-date Broward County LRTP Amendment Process Next steps.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Design Phase Coordination and the Regional Environmental Coordinator’s Role.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Blackstone Hydropower Status Report 3 rd Annual River Users Conference Blackstone Valley Tourism Council Tricia Jedele, Conservation Law Foundation Bruce.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
UNICEF’s work and planned activities for the production of data on children with disabilities Claudia Cappa, Data and Analytics Section, UNICEF, NY.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
Construction Report December 8, Projects Track replacement and turf In Progress Walking tracks: Redesign Water wells January 2010 Bleachers January.
Remote Sensing Applications for Environmental Analysis in Transportation Planning : Application to the Washington State I-405 Corridor.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
The journey towards the nirvana of internal communication UNECE work session July , Paris.
Orlando-Orange County Expressway Authority Project Development Process.
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
In-Delta Storage Program Environmental Evaluations Stakeholders Committee Meeting January 22, 2003 Leslie Pierce.
1. 2 Mobility 3 Capacity 4 Efficiency of Commerce.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Alternative Alignments Public Meeting
Comprehensive Trail Planning
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
Nanomaterial Risk Screening Tool (NRST)
Cultural Due Diligence
Overview What is the CEQA environmental review process?
Tampa Hillsborough Expressway Authority Industry Forum 6/15/2018.
MPO School Transportation Working Group
Transportation Sustainability
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Resilient Task Force June 19, 2018.
Tampa Hillsborough Expressway Authority Industry Forum 2/8/2019.
European Commission, DG Environment Air & Industrial Emissions Unit
and Passenger Rail Plan
Draft Equine Ordinance
Water Scarcity & Droughts Policy in the EU Gap Analysis
Stakeholder Engagement
Camarillo Springs Project Draft EIR Scoping Meeting
Environmental Analysis Tools An Overview
Validation procedure Nat. Secretariat and MSG
Presentation transcript:

Wakulla County Airport State Environmental Impact Report

Completed Tasks Public Involvement Plan and Project Newsletter Efficient Transportation Decision making (ETDM) has been submitted to FDOT Should be uploaded in the Environmental Screening Tool (EST) by end of July Field reviews: Wetlands and Wildlife Cultural and Social Engineering Analysis Contamination Utilities

Ongoing and Upcoming Tasks Data collection and desktop analysis for the engineering analysis and report Existing characteristics Floodplain analysis Design analysis Concept Plans Data collection and desktop analysis for the environmental analysis and report Conceptual Mitigation Plan Permit conditions Noise and air quality Geotechnical Field Review Cultural Resource Assessment Survey draft documentation ETDM Screening and Summary Report

What’s Next? Environmental and engineering analysis Public and stakeholder involvement 1 additional Wakulla Board of County Commission (BOCC) Meeting 1 Wakulla County Public Hearing in late 2016 Continue development of the SEIR report