Gas cell apertures with dimensions (original)

Slides:



Advertisements
Similar presentations
Recap of heat loads and peak doses from HL-LHC Q1 to Q7 L.S. Esposito, F. Cerutti HL-LHC WP3 meeting, 22 May 2014.
Advertisements

D2 conceptual design and field quality optimization Ramesh Gupta, BNL Slide No. 1 Nov. 13, 2013 D2 Conceptual Design and Field Quality.
20 June 2008E906 Collaboration Meeting1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Station 1 Status.
Meson Production at 8 GeV for IDS120h X. Ding, UCLA Target Studies, Dec. 27, 2011.
On MICE Coordinate System Yury Ivanyushenkov RAL.
Stereolithography Technology for Creating Solid Prototypes.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Radial T Profile Across Wall Separating Hot & Cold Fluids 1.
Theme 2: The theoretical eye Form and dimensions of the eye Optical constants of the eye Optical Geometry applied to the eye Schematic model of the eye.
Due to the oscillating charge in the antenna Along this line one does not observe any acceleration Radiation from a dipole-antenna To get the dimension.
Design of Vacuum Chambers of SSRF Storage Ring Yonglin. Chen, Dikui. Jiang SSRF Vacuum Group Shanghai Institute of Applied Physics(SINAP) China Academy.
Sensors for Clear Object Detection
Takeyasu Ito University of Tennessee EDM Collaboration meeting August 19-20, 2004 Nature of a Separate Production Cell What dimensions are appropriate.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
PANDA Collaboration Meeting, GSI November 2010 H.O. Cluster-Jet works at GSI Herbert Orth, GSI Darmstadt, Germany Title.
The reading is 7.38 mm. The reading is 7.72 mm.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
“CENTRAL SUPPORT FRAME” -
L. Gentini, A. Bertarelli, F. Carra
Mitosis and Meiosis Review
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
From: Gas-Filled Encapsulated Thermal-Acoustic Transducer
Copyright © 2000 American Medical Association. All rights reserved.
Date of download: 10/26/2017 Copyright © ASME. All rights reserved.
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
EBTF Design Review Technical Meeting Group
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
sub-femtosecond correlated dynamics probed with antiprotons
PANDA Collaboration Meeting
New ATLAS VI Mechanical Tolerances and Aperture Approvals
Hcal Geometry (second version)
Temperature and Volume Relationship of Gases (Charles’s Law) Temperature and Pressure Relationship of Gases (Gay Lussac’s Law) A.10/A.11 In text.
קורס פיננסי – מושגים פיננסיים / כלכליים
Standard Form to Scientific Notation
Magnetic gap calculation
Slit electrode simulation using CST
Pneumatic nebulizer 4. Larger particles are smashed against the
Jasper Johns.
Preliminary Design Review
Documentation Standards
Tolerances.
Exploring the Effect of Changing Dimensions on Area & Perimeter
DESY drift chambers efficiency and track reconstruction
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Test RF gun cavity Takuya Natsui.
The upstream effect on back pressure ratio
SksMinus status 08 HB meeting 2008/7/10 白鳥昂太郎.
CMS vacuum chamber. Geometry for wakefield calculations
MERIT Beam Collimator Design
4.1 Cell Biology Lesson 4.
Robot design, component fabrication, and assembly.
Difference between 3 COF and 6 COF Open cells in 22” Segment
Targets position survey
Similar Figures.
Beam Halo Considerations for Back Angle Running
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
1 min each time, 2 persons share a torch they speed of slower person
Centroid TUTORIAL.
Vacuum in LER and HER. First estimation for the pumping system requirements A.Variola for B.Mercier, C.Prevost, F.Letellier.
Fig. 1 Characterization of Suv420h dKO mice.
Crab crossing plan Optimize the crabbing system for best beam stability and minimum emittance impact Study and specify tolerances on cavity multipole components.
RHIC Magnets for JLEIC Yuhong Zhang May 11, 2018.
accumulation octopole
Option 1: Reduced FF Quad Apertures
Presentation transcript:

Gas cell apertures with dimensions (original) >1.8mm Beam 1.8 mm (.071”) 1.6mm (.063”) 1.6mm (.063”) orifice 1.5mm (.059”) 1.75” 1.94” .315” 1.61”

Measured Old Gas cell apertures with dimensions (16/02/2015) 1.8mm 2.5mm Beam 1.8mm 1.7mm 1.8mm 1.75” 1.94” .315” 1.61”

New Gas cell apertures with dimensions (16/02/2015) 2.5mm 2.5mm Beam 2.5mm 2.5mm 2mm 1.75” 1.94” .315” 1.61”

New gas cell 16/02/15) Ø=2.5mm=0.0984” Ø=2mm=0.0787”

Beam

Gas cell (target) Chamber Beam

8” conflat 6-way cross Baffle With aperture