BG Ingénieurs Conseils My project My career path

Slides:



Advertisements
Similar presentations
Safety in Excavation.
Advertisements

Post Graduated Master Course TUNNELLING AND TUNNEL BORING MACHINES
Dublin Port Tunnel Xiaowei Jin, Xinni Wang, Mingqiu Mao.
Post Graduated Master Course TUNNELLING AND TUNNEL BORING MACHINES Subject of the lesson : RME238 series Metro Seville Lecturer : René Raúl Ramírez.
 Location – Maneri to Uttarkashi, India  Length – 8.56km long, diameter 4.75m  Use – a power tunnel, part of the hydro-electric project on the River.
Tunnelling Methods.
Design Parameters.
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
Transportation Tuesday TRANSPORTATION TUESDAY Everyone is a pedestrian! You may spend most of your waking hours behind the wheel, but everyone ends up.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
Northumberland Strait Crossing Confederation Bridge New Brunswick, Canada Will Astley Jonathan Richards.
Obtaining Raw Materials
CONSTRUCTING A FIVE CABIN LATRINE
LAGUNA at Fréjus LAGUNA/LAGUNA-LBNO General Meeting March 3 th -5 th, 2011, CERN Eng. Francesco Amberg.
MATERIALS & CONSTRUCTION TECHNOLOGY MATERIALS & CONSTRUCTION TECHNOLOGY PALESTINE UNIVERSITY Second semester Dr. Ali I. Tayeh.
EXCAVATION. Excavation 1Excavation activity involves use of manual and mechanical means and interaction of both. Hence, safety aspect to plan involvement.
DUSEL S-1 Themes Evolution of the Biosphere Resources: Origin, Discovery and Exploitation Humans and the Environment Problems Questions?
General meeting LAGUNA LAGUNA – Fréjus site
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
CHEMICAL ENGINEER Zachary Pierzchala Personal management 6 th hour.
By: Taher Elsayed. What do they do? Civil Engineers design and supervise the construction of roads, bridges, tunnels, buildings, airports, and other stuff.
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
SVEUČILIŠTE U RIJECI GRAĐEVINSKI FAKULTET UNIVERSITY OF RIJEKA FACULTY OF CIVIL ENGINEERING.
U.S. and Panama Canal Angele de la Cruz & Kristina Brouse.
Carolina Pacchi, DiAP Politecnico di Milano Krakow, SMART-IST. INSTITUTIONAL CAPACITY FOR TERRITORIAL DEVELOPMENT.
JOBS By: Ben Simmons CAREERS OCCUPATIONS. Architect Architects plan and design houses, office buildings, and other structures. I am interested in this.
Civil engineer By Raul Vazquez. What is a civil engineer like A civil engineer design many thing like roads, buildings, tunnels, bridges, dams, or water.
Environmental Dialogue between of Ministry of Natural Resources of Russia and the European Commission, DG Environment Workshop on The Espoo Convention.
Chartered accountants work in accounting firms, government agencies, and in departments of large organizations. They work indoors in offices and spend.
Page 1 Team: Murphy Robot: Lucky Team Members: Snehal Indra Chris Cruise James moore.
TRENCHING & EXCAVATION
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
Welcome to Grenoble Institute of Technology. Who are we ? -5,440 students -1,200 Master’s graduates -200 Ph.D graduates -450 faculty members -€ 146 million.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
GEOTECHNICS & APPLIED GEOLOGY. Prepared by: Group D
Rock & Landforms I-5. Moving Water and Landscapes Water runs downhill –GRAVITY! Water runs downhill –GRAVITY!
Additional site investigations Study on long-term behavior of rock PhD project at Technische Universität München Chair of Engineering Geology Carola Wieser,
How Rocks Deal With Stress Chapter 7: Plate Tectonics.
Substructure Groundworks - Hazards
International workshop on micropiles – Venice, 30 may – 2 June 2002
Industrial Electronics & Maintenance Technology
How deltas are formed Heaviest particles are unloaded first as a river loses momentum, closest to shore, forming a thick layer of sediment. Smaller particles.
Career Crossroads.
Shaping Earth’s Surface
Faculty Of Civil engineering department BMCET,SURAT.
TRANSPORTATION TUESDAY
Visit for more Learning Resources
Chapter 8 review game Sect 8.3 Sect 8.1 Sect 8.2 Chapter review 1 1 1
Geotechnical Engineering II
Construct your own world…. William Hall
Obtaining Raw Materials
学 术 讲 座 System Reliability Analysis: New Perspectives 报告人( Speaker):
GEOLOGICAL STRUCTURES
PES 1000 – Physics in Everyday Life
Risk Management – Correlation and Dependencies for Planning, Design and Construction Philip Sander Alfred Moergeli John Reilly.
Building for travel made by: Pankova Irina Vadimovna
England, Spain, and France
Instructor: Dr. Tatiana Erukhimova
ROUNDTABLE 2 Laying Ground for Successful University-Business-Industry Cooperation in Doctoral Education: How to Prepare Doctoral Candidates to Work.
By Harley Lay, and Travis Reynolds
Department of Civil Engineering
The Moon & Tides.
NEW OPPORTUNITIES AND CHALLENGES IN 3-D GEOLOGICAL MAPPING IN POLAND
Reedy River Basin Sewer Tunnel Project Update
Dead bodies of diatoms fall to bottom of ocean
Marzia Sorrentino Operations Project Manager Work Experience Education
THE LOCKPORT DAM.
Risk Management – Correlation and Dependencies for Planning, Design and Construction Philip Sander Alfred Moergeli John Reilly.
Presentation transcript:

BG Ingénieurs Conseils My project My career path Michele Janutolo Barlet BG Ingénieurs Conseils My project My career path Born in 1984 in Italy (Italian and French citizenship) 2006 : Bachelor Degree in Civil Engineering at Politecnico di Torino (Italy) 2007-2008 : Second year of master at INSA Lyon (France) 2008 : Internship for Lyon Turin Ferroviaire in France 2008 : Master Degree in Civil Engineering 2010: Visiting student at Queen’s University (Canada) 2012 : PhD Degree in Rock Mechanics at Politecnico di Torino 2012 – now : BG Ingénieurs Conseils in France, Design Engineer then Project Manager Mont-Cenis Base Tunnel along the new Lyon-Turin railway line (owner: Tunnel Euralpin Lyon-Turin, TELT) Most challenging activity during this project : design of a mixed shield slurry TBM in the Italian side of the tunnel. The TBM has been designed according to geology: Lithology and rock quality varying significantly Faults with squeezing rocks and high water inflow Excavation under a glacial valley with sand and gravel deposits with an overburden of 55 m (closed mode) Potential asbestos-bearing rocks (special procedure) Why underground An anecdote… My career path : I was born in 1984 in the North of Italy, with Italian and French citizenship (my mother is French) In 2006, I obtained my bachelor degree in civil engineering at Politecnico di Torino. In 2007-2008, I spent my second year of master at INSA de Lyon. In this framework I carried out an internship for Lyon-Turin Ferroviaire. In 2008 I obtained my Master’s degree, again in Civil Engineering. I continued my studies with a PhD in Rock Mechanics, again at Politecnico di Torino. In this framework, in 2010 I was a visiting student at Queen’s University in Canada. In 2012 I obtained the PhD degree. In the same year I started working for BG Ingénieurs Conseils in France, bofore as a Design Engineer and then as a Project Manager. My project : The main project during my career has been the Mont-Cenis Base Tunnel along the new Lyon-Turin railway line – the owner of this project is Tunnel Euralpin Lyon-Turin –TELT-, and the most challenging activity during this project has been the design of a mixed shield slurry TBM in the italian side of the tunnel. The TBM characteristics have been designed according to the geological context, facing the following issues: • Lithology and rock quality vary significantly along the tunnel (micaschists, gneiss, cargneules, calcschists, etc…), with a overburden until 1200 m; The TBM will cross faults in which squeezing rocks and high water inflows are expected. • The TBM will excavate under a glacial valley, with sand and gravel deposits with an overburden of 55 m. It will work in closed mode here; • The TBM will excavate in potential asbestos-bearing rocks for a short length. A special procedure has been defined to deal with these rocks. The variability of geology, rock mass parameters and behaviours during excavation makes tunnelling a challenging and interesting activity. This is by sure the case of the Mont-Cenis Base Tunnel, in which all the main rock mass conditions and the major geological hazards have been encountered or are expected. Tunnel design is not a repetitive task, for this reason I find it really attractive, in contrast to structural engineering for example. When visiting the ongoing excavation in the French side of the Base Tunnel at the foot of the St. Martin La Porte access tunnel, the driver reversed, in order to go out. But the car broke down really when it was perpendicular to the tunnel, blocking traffic and tunnel logistics! The workers tried to repair it, but without success. Finally the car was towed up to the surface. The Base Tunnel excavation was stopped 1 hour due to this problem! We say it was a weapon of the opponents..