Windward Community College ARLISS/USLI Presentation Fall 2009 KCC, Ohi’a Room 118 November 21, 2009 Premo Ames II Todd Esposito Joleen Iwaniec Patrick Lancaster Jasmine Maru
ARLISS 2009
Thank You!
University Student Launch Initiative Team Members Todd Esposito Patrick Lancaster Joleen Iwaniec Premo Ames II Jazmine Maru
Utah Conference 2009 Advanced Rocketry Workshop Bonneville Salt Flats
Level 1 Certification flight Bonneville Salt Flats, Utah Todd Esposito
Level 1 Certification Attempt Black Rock, Nevada After Before
Certification Launches Black Rock, Nevada Level 1 Level 2
Level 2 Certification Complete
Educational Outreach USLI is education outreach oriented Minimum 2 outreach events
Community Support
This Is A Competition! Preliminary Design Review 100 Critical Design Review 150 Flight Readiness Review 150 Education Engagement 100 Website 50 Successful flight and Recovery 200 Altitude 150 Final Report 100 Total: 1000
Characteristics, Construction, & Recovery
Initial design criteria 5,280 ft Carry a student payload National CanSat program No bigger than a 12 fl oz soda can Mass no greater than 1 kg USLI requires a dual deployment recovery
Characteristics Electronics in nose cone Air brake system Three fin design
Construction G10 fiberglass Motor K560W by Aerotech 2,560 Newton seconds (thrust)x(burn time) 120 lbs of thrust 4.5 seconds of burn time
Flight Profile 5 phases Boost phase Coast phase Deployment of drogue chute at apogee Initial decent rate Approximately 60 ft/sec Deployment of main chute at 500 ft Slows approximately to less than 20 ft/sec Close and intact recovery
WEB PRESENCE The team shall have a web presence maintained/updated throughout the period of performance that will be judged at random times throughout the year. No set guidelines for web presence in USLI rules book NASA MSFC will receive the required documents through website
Far Exceeds Expectations SCORING Website (5%) Website updated PDR Far Exceeds Expectations 5 Website updated CDR Website updated FRR Total (15) 15 Points (50): % of Website total 100 50
WCC CAE WEBSITE Currently hosted on Laulima Limited capability using Laulima editing tool. New website under construction
Gantt Plot
Any Questions?