Linac Coherent Light Source (LCLS)

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Degree and Graduation Seminar Scope Management
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Chapter 5: Project Scope Management
Fundamentals of Information Systems, Second Edition
Course Technology Chapter 3: Project Integration Management.
Chapter 5: Project Scope Management
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Trish Mast External Independent October 9, 2007 Linac Coherent Light Source (LCLS) The Rebaseline Process Trish Mast October.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Software Project Management (SPM)
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
SOFTWARE PROJECT MANAGEMENT
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Project Cost Management
Camera PDR/CD1 Planning 19 September 2008
Project Cost Management
Project COST Management
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
IF 3507 Manajemen Proyek Perangkat Lunak
Copyright All Rights Reserved by
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
Module nine PMP® Mastery 2016 APMG Create WBS
Plan Schedule Management
Project Management W. J. Foyt
ENGR 281 Engineering Scholars Program Project Management Life Cycle Overview K. F. Reinschmidt J. L. Frank / Marathon Ashland Petroleum LLC Chair in.
Establishing and Managing a Schedule Baseline
Project Cost Management
Project Integration Management
Chapter 5: Project Scope Management
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
Earned Value Management
Dave Bachman DAU / CDSC September 9, 2004
EVM 202—Lesson 3 EVMS Guidelines and Compliance
Chapter 5: Project Scope Management
Project Management.
A Stitch in Time Saves Nine
LSST Project EVMS Performance Overview Kevin E
Project Cost Management
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Scope Management Chapter 5
CIS12-3 IT Project Management
Project management Learning Unit 5.
Project Cost Management
Project Integration Management
PMCS Approach - Past and Current Projects
DOE Review of the LCLS Project
Project Integration Management
EVMS Status and Overview
Chapter 3: Project Integration Management
Scope Management Chapter 5
Linac Coherent Light Source (LCLS)
Linac Coherent Light Source (LCLS)
Project Time Management
Linac Coherent Light Source (LCLS)
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Linac Coherent Light Source (LCLS) Project Management Control System Trish Mast August 11, 2004

PMCS Development The LCLS PMCS and methodology is modeled after the B-Factory PMCS. Utilize personnel experienced with the B-Factory PMCS system for both implementation and execution. Software selection (Cobra, P3 and wInsight) based upon: Comprehensive evaluation matrix (process drives software) Software was tested with project data Successful experience The LCLS PMCS meets DOE Order 413.3, Program Management for the Acquisition of Capital Assets and the 32 criteria from DoD 5000.2 on the Industry Standard for Earned Value

PMCS Baseline Development Integrated Cost and Schedule Baseline Development Establish the WBS Detailed Schedule Development Schedule Integration Funding reconciliation Establish the Performance Measurement Baseline (PMB) Integrate the Cost and Schedule Baseline We started the process in Aug ’03 and finalized the baseline in Mar ‘04

PMCS Baseline Development Detailed Schedule Development 100% of scope covered Simplest approach is to schedule the WBS Logic-driven schedule networks Identify interfaces (needs and availabilities) with other systems Consistent use of calendars, units and resources for reliable calculations Proper activity coding for reporting and summarization The EIR concurred that all requirements had been met

PMCS Baseline Development Schedule Integration IPS Activities I promise to do lots of things I promise to deliver you something I can’t start until you give something to me Interface Milestones “contract” between organizational elements Delivering organization Receiving organization

PMCS Baseline Development Funding Reconciliation Typically, the ‘bottoms-up’ plan yields a different funding requirement than what has already been established from the ‘top-down’, requiring schedule iterations Identify and correct funding issues at lowest level of detail plan to fit within the existing funding constraints Establish the PMB Develop the work packages Cost load the schedule to establish the budget and obligation profiles Identify performance measurement techniques Implement “Rolling Wave” philosophy for detail planning

Integrate the Cost and Schedule Baseline Accounting Systems WBS / Cost Estimate Performance Analyzer Reports for Mgmt/DOE Performance Measurement Baseline Integrated Project Schedule Integrated Cost/Schedule Database Status Worksheets CCB Actions All tools and processes are completely integrated and automated

Project Execution and Control Monthly Reporting Cost/Schedule Drill Down Approach Project Level SPA Chart Project Level Cost Report – (CPRs, CSSRs) Project Level Performance Analysis System Level SPA Chart System Level Performance Analysis System Level Cost Report (Budget Element) Work Package Detail Cost Report Detailed Accounting Report /Schedule Traditional Analysis (Critical Path, Variance, EAC)

Milestone Reports Performance Analysis SPA vs Funding Sample Monthly Reports

Critical Path Analysis Cost/Schedule Performance Reports Manpower Reports Critical Path Analysis Cost/Schedule Performance Reports Sample Monthly Reports

Execution and Change Control Change Control Process Prepare project scope change request form (tech description, cost evaluation and schedule impact) Approve and incorporate changes to the baseline

All reports and logs tie out each month Change Control Log All reports and logs tie out each month

Detailed Cost Estimate All budgeted quantities tie to Basis of Estimate

Still to Do… PMCS Validation in Oct/Nov as noted in EIR Report FY05 Work Package Planning Refine collection of Actual Costs Implementation of wInsight