Data Quality Working Group Meeting 14

Slides:



Advertisements
Similar presentations
Page 1 GEO/CEOS-SIT Call to Action Ken McDonald WGISS Vice-Chair.
Advertisements

Presentation title 1st Sustainable Development Mechanisms Joint Coordination Workshop Module 2.4 Materiality Bonn, Germany, 24–25 March 2012 Marsha Cheddi.
Workshop: Reviewing and Implementing Policies Cat Forsyth, Team leader Learning Disability Team, Salford Royal NHS Foundation Trust.
Project quality management Cody Ronning 3/23/2015.
New Advanced Higher Subject Implementation Events
New Advanced Higher Subject Implementation Events Design and Manufacture: Advanced Higher Course Assessment.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
Copyright Prentice Hall, Inc. 1 Computers: Information Technology in Perspective, 11e Larry Long and Nancy Long Chapter 11 Developing Business Information.
Page 1 ISO/IEC JTC 1/SC 7/WG 7 N Summary of the Alignment of System and Software Life Cycle Process Standards The material in this briefing.
Institutional Arrangements for Adaptation Achala Chandani Researcher International Institute for Environment and Development european capacity building.
Mahindra Satyam Confidential1 BASE TM Methodology Guide Quality Management System BASE TM Methodology - 17 Slides Continue Back.
1 THE NATIONAL ANNUAL PRIORITY ACTION PLAN NATIONAL PARTNERSHIP FORUM JAN 30TH – 1 ST FEBRUARY 2006 By Rose Nalwadda - UAC.
Senior Evaluation Officer GEF Independent Evaluation Office Minsk, Belarus September 2015 Evaluation in the GEF and Training Module on Terminal Evaluations.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
 OpenProcess, Inc WkflDsgn - 1 Part 2 of 6: Methodology Overview Object-Oriented Workflow Design SAMPLE.
Hydrographic Services and Standards Committee 7th MEETING OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE (HSSC) Busan, Republic of Korea,
Concepts/ definitions/ meanings of program plan, program scheme, program development, concept paper Program plan is a systematic arrangement of elements.
ESS GUIDELINES ON REVISION POLICY AND IMPACT STUDY IN NA AND BOP Hans Wouters EUROSTAT.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
1 Joint Clearing-house Mechanism for Information Exchange and its draft strategy By Osmany Pereira Gonzalez, BRS Secretariat Geneva, 7 October 2015.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-8 Agenda item 8 Input from HSSC-7 IHB.
BSA 385 Week 3 DQ 1 User Interface delineations are a key aspect of the Physical Model design description of your proposed system solution. Discuss the.
Integrated Planning System
Certification of Trusted Repositories
Hydrographic Services and Standards Committee
S-100 Test Bed Platform S-100WG / KHOA Presented by KHOA (Yong BAEK)
Design AH Computing.
Report of the Data Quality Working Group
Proposal by the DQWG Portrayal of bathymetry quality in S-101
Agenda Item 5.1 – S-100 Interoperability Specification
Entry into force of the Amendments to the IHO Convention and its supporting Basic Documents
Standards” and by the Council key Priorities
Proposed IHO Work Programme for 2018
IRCC9 Input from HSSC8 Reference Doc: IRCC9-09A
Development of a Data Quality checklist DQWG-13
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
Mercy Corps PAHAL Data Use
Report and Proposals from HSSC
Meso-American - Caribbean Sea Hydrographic Commission (MACHC)
Report of the / Proposal by the DQWG
Report from the S-100WG to NCWG April 2016, IHB, Monaco
Statistics Governance and Quality Assurance: the Experience of FAO
Hydrographic Services and Standards Committee
Updates and Proposals from the HSSC
IRCC 10 Outcomes Complete IRCC report available on the IHO website
Evaluation in the GEF and Training Module on Terminal Evaluations
NCWG Input to the IHO Strategic Plan and IHO 3 Year Work Plan
Work Advancement Meeting WebEx Meeting’s Agenda
Hydrographic Services and Standards Committee DQWG
24 January 2018 Juba, Republic of South Sudan
Proposal for new method to display quality information
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Report of the Data Quality Working Group Rogier Broekman, Chair
NCWG2-11.4A INT1 Symbol Repository
IHO NCWG2 IHB, Monaco April 2016
An Output from the NIPWG Report to HSSC7
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Report of the S-101 Project Team
Hydrographic Services and Standards Committee Report of the ENCWG
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
FAIRMODE WG2 The main aim of WG2 activities is to create a European Framework for Model Evaluation which will include the development of widely accepted.
IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE
NORDIC HYDROGRAPHIC COMMISSION (NHC)
IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE
Date and venue: 23 September, MSFD PCG, DG Environment, Brussels
3rd Meeting of the IHO Council
Presentation transcript:

Data Quality Working Group Meeting 14 Program outline DQWG-14, Monaco, 5-8 February 2019

DQWG-14, Monaco, 5-8 February 2019 DQWG Role DQWG is an advisory WG to other HSSC-WGs. Provide advice on DQ aspects to all WGs/PTs developing S-100 based PS. Harmonization of different views among the WGs. Encourage development through input, guidance and coordination. Advice on three different levels: development stage implementation guidance end user support DQWG-14, Monaco, 5-8 February 2019

Geo-information product life cycle A geo-information product has the following life cycles: development testing acceptance production end user support termination DQWG-14, Monaco, 5-8 February 2019

Data Quality into the life cycle Development -> DQ Checklist -> S-97 Part C - Data Quality. Development -> DQ Checklist -> S1-xx PS DQ paragraph. Testing -> provide advice upon request from testing Parties. Acceptance -> provide advice to HO’s on the concept and importance of DQ required for e-NAV. Production -> Minimum Standard for Data Validation. End user support -> S-67 publication. Termination -> S-57 no longer in use, CATZOC symbolisation obsolete, replaced by Quality of Bathymetric Data mechanism. DQWG-14, Monaco, 5-8 February 2019

DQ aspects from ping to chart to end user From survey data to CATZOC values -> best practices. From survey data to Quality of Bathymetric Data (QoBD) values. DQWG to close the gap between S-44 and S-101. Guidance to HOs: how to allocate QoBD values. DQWG to develop a portrayal concept. Portrayal concept to be evaluated and tested by other WGs. Joint effort to operatively implement this. Re-fine Guidance to HOs based on testing results portrayal concept. Re-fine S-67 End user support. DQWG-14, Monaco, 5-8 February 2019

Graphical overview national methodologies survey to CATZOC decision tree portrayal concept end user support S-44 S-57 S-101 S-101 v2.0 S-67 HSPT ENCWG S101PT S100WG DQWG DQWG DQWG DQWG-14, Monaco, 5-8 February 2019