Misoperations Reduction Strategy

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

THE LUBRECHT REPORT: A MID-WAY ASSESSMENT OF THE 10 -YEAR WILDERNESS STEWARDSHIP CHALLENGE Developed By: The Wilderness Advisory Group April 2010.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Microprocessor-Based Relays: Implementation, Conflicts, and Corrective Actions Steven V. Deases AEP – Station Engineer.
United States Department of Agriculture Food Safety and Inspection Service 1 National Advisory Committee on Meat and Poultry Inspection August 8-9, 2007.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Human Error Reduction – A Systems Approach.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Misoperations Reduction Strategy
NERC Published Lessons Learned Summary
NERC Lessons Learned Summary
Core Competencies Training for Supervisors
Core Competencies Training for Supervisors
Performance Management System
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reducing “Unknown” Misoperation Causes
WECC Regional Standards Update
NERC Published Lessons Learned Summary
Path Operator Implementation Task Force
Operations Event Report Enhancement
Office of Nuclear Materials Safety and Safeguards
What is an Operation and Misoperation
MAC Board Effectiveness Survey
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
Reliability Assessment Guidebook (RAG): Status Report
Overview – Guide to Developing Safety Improvement Plan
Sports Marketing Careers
Air Carrier Continuing Analysis and Surveillance System (CASS)
Reliability Assessment Guidebook (RAG): Status Report
Overview – Guide to Developing Safety Improvement Plan
MIC Committee Discussion
Safety and Security- From Assessment to Implementation
Misoperations in the West: Lay of the Land
Impacts and Actions Resulting from the August 14, 2003 Blackout
Western Electricity Coordinating Council
Human Performance Work Group
Compliance Open Webinar
Commissioning: Best Practices and Possible Traps
WECC August 2017 Reliability Workshop James Merlo, PhD
WECC Performance Analysis
NERC Reliability Standards Development Plan
Strategic Planning Process
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
WECC August 2017 Reliability Workshop James Merlo, PhD
Western Electricity Coordinating Council
2019 Draft Budget Overview Jillian Lessner – Chief Financial Officer
Strategic Planning Process
What is an Operation and Misoperation
Reliability Assurance Initiative (RAI) 101
Randy Spacek AvistaCorp, RWG chair
Human Performance Work Group
Compliance Open Webinar
Commissioning: Best Practices and Possible Traps
Misoperations in the West: Lay of the Land
An Automotive Tier 1 Warranty Process
2019 Draft Budget Overview Jillian Lessner – Chief Financial Officer
Western Electricity Coordinating Council
MAC Board Effectiveness Survey
Internal Controls Assessment
Reducing “Unknown” Misoperation Causes
NERC Reliability Standards Development Plan
Compliance Monitoring Strategy
MIC Committee Discussion
NERC Planning Committee Update
2019 Scorecard September 2019.
Presentation transcript:

Misoperations Reduction Strategy James Hanson, WECC Randy Spacek, Avista Jonathan Meyer, Idaho Power Chris Fleenor, Tucson Electric Power Western Electricity Coordinating Council

Western Electricity Coordinating Council Dream Team Needed Western Electricity Coordinating Council

Advisory Group Created Randy Spacek – Avista Corp. Jonathan Meyer – Idaho Power Company Chris Fleenor – Tucson Electric Power David Sydor – BC Hydro Holly Mitchell – Northwestern Corp. Rich Bauer – NERC Jeff Mitchell – Reliability First Western Electricity Coordinating Council

Western Electricity Coordinating Council Ground Rules Western Electricity Coordinating Council

Western Electricity Coordinating Council Inward Focus Western Electricity Coordinating Council

Western Electricity Coordinating Council Handout Western Electricity Coordinating Council

Issue Summaries and Action Plans Western Electricity Coordinating Council

Improvement Through Best Practices Western Electricity Coordinating Council

Short-Circuit Model Quality Issue Summary Action Plan Short-circuit models are critical to developing settings and studying impacts of elements to the system. Flawed or outdated short-circuit models can lead to incorrect settings and misoperations. Processes for updating and sharing short-circuit model information can ensure settings are based on the most accurate model available and improve setting accuracy. Host webinar to discuss top issues and inconsistencies in short-circuit models with the WECC Short Circuit Work Group (SCMWG). Create an evaluation checklist for short- circuit models and related practices, including communication and information sharing practices. Participate in regional model initiatives or share short- circuit information with neighboring entities. Participate in the WECC SCMWG. Western Electricity Coordinating Council

Western Electricity Coordinating Council Root-Cause Analysis Issue Summary Action Plan When entities report a misoperation as an incorrect setting issue, they are not required to describe in detail why the setting was incorrect, or the root-cause. Thorough root-cause analysis is critical to misoperation investigation because it allows entities to identify underlying issues and prevent future issues. Implementing root-cause analyses can ensure thorough mitigation of misoperations. Develop an ERO Enterprise misoperation investigation root-cause analysis program. Share information with entities regarding their incorrect setting misoperations relative to other entities and the WECC average. Draft a best practice guide with examples of effective misoperations root- cause analyses. Conduct training webinar or in-person training to address root-cause analysis in misoperation investigation. Create an evaluation guide to facilitate entity self-assessment of misoperation root-cause analysis practices. Western Electricity Coordinating Council

Testing Setting Application Issue Summary Action Plan Bringing protection systems online involves a complex process with many opportunities for human error; namely, incorrect application of settings that can lead to misoperations. With the proper controls in place, there are also opportunities to identify and remediate errors before they are issued to the field. Training, process checks, and quality reviews should serve as checkpoints for application testing. Create a guideline for using quality review and power system simulators to confirm application of settings prior to implementation in the field. The guideline will include an evaluation checklist. Develop best practice guide with examples of effective controls concerning application testing. Provide points of contact for entities interested in refining their processes. Perform internal evaluation of practices regarding application testing prior to field implementation, and identify areas for improvement. Western Electricity Coordinating Council

Western Electricity Coordinating Council Knowledge Transfer Issue Summary Action Plan As workforce turnover continues over the next five-10 years, critical knowledge may be lost. To prevent this, protection system and control departments should ensure that valuable information and insight from experienced employees is documented and transferred to incoming and intermediate employees. Developing measures to identify and prevent gaps in knowledge transfer will help accomplish this. Hold webinars on knowledge transfer techniques and challenges specific to the electric industry. Create internal evaluation guide to facilitate entity self-assessment regarding knowledge transfer practices. Develop best practice guide with industry examples of effective knowledge transfer. Western Electricity Coordinating Council

Human Performance During Commissioning Issue Summary Action Plan The commissioning process is crucial to ensuring new equipment is installed correctly and will function as intended. This process can be complex and provides opportunities for errors. Addressing human performance issues associated with the commissioning process can reduce the number of errors and resulting misoperations. Share misoperations data concerning human performance during commissioning (e.g., as-left personnel errors, AC/DC systems). Develop human performance in commission testing guide based on field experience and documents such as the IEEE commissioning document. Bring commission testing issues and questions to the WECC Relay Work Group to be discussed. Western Electricity Coordinating Council

Limited Information for Investigations Issue Summary Action Plan Challenges with the retrieval of information from electromechanical and solid state protection systems can make misoperation investigations difficult, and can lead entities to designate “unknown” causes by default. Addressing this tendency and shoring up investigation practices will help ensure all misoperation investigations are equally robust, regardless of the technology involved. Share unknown misoperations rate information with entities, including how it compares to WECC average and other entities. Determine the extent of condition, break down relay fleet by type, identify percentage of unknown misoperations by relay type, and perform internal evaluations of non-microprocessor systems to identify areas for improvement. Create replacement plans for non-microprocessor systems with performance issues, and implement reinforcement strategies to identify areas where monitoring equipment may capture essential information. Western Electricity Coordinating Council

Application of Settings in the Field Issue Summary Action Plan Settings applied incorrectly in the field lead to misoperations. Controls can help confirm that settings are applied correctly and commissioned in the existing system as expected, and this may prevent costly troubleshooting. A thorough testing process for applying settings in the field will help reduce associated misoperations. Host webinar with presentations from subject matter experts on challenges and techniques for correct application of settings in the field. Follow the checklist provided in the Process, Issues, Trends, and Quality Control of Relay Settings IEEE PSRC Working Group report to review processes involving application of settings in the field and commission testing. Develop a best practice guide with examples of effective commission testing and provide points of contact for entities interested in refining their process. Western Electricity Coordinating Council

Ground Overcurrent Protection Issue Summary Action Plan Many incorrect setting misoperations can be attributed to ground overcurrent settings. In the Texas Interconnection, for example, ground overcurrent settings comprised a large percent of incorrect setting misoperations. To address this issue in the West, we should develop targeted efforts to improve the coordination of ground overcurrent settings. Conduct analysis to determine extent of condition in the Western Interconnection. Host educational webinars addressing Ground Fault Protection challenges. Assess entity ground fault protection practices. Develop a best practice guide with examples of effective coordination of ground overcurrent fault settings. Western Electricity Coordinating Council

Improvement Through Best Practices Internal Analytics Best Practices webinar Microprocessor Complexity Informational webinar Documentation of Processes Education webinar Process for Contracted Work Lessons-Learned webinar Western Electricity Coordinating Council

August 30, 2017 Reduction Strategy Discussion What about misoperations keeps you up at night? What can we do about it? Does the Reduction Strategy set us in the right direction? Western Electricity Coordinating Council

Reduction Strategy Comment Period Reduction Strategy document will be available for content review September 1-October 15 at: https://www.wecc.biz/PerformanceAnalysis/ Western Electricity Coordinating Council