WMO Information System

Slides:



Advertisements
Similar presentations
RA I WIGOS IMPLEMENTATION PLAN Status Report as at 8 March 2013 By Amos Makarau.
Advertisements

Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA VI Jochen Dibbern, RA-VI Focal Point WMO Regional Association.
RA-VI WG-TDI-3 RA-VI WORKING GROUP ON TECHNOLOGY DEVELOPMENT AND IMPLEMENTATION Report of the Chairman Jochen Dibbern Prague, Czech Republic, February.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
RAI WIGOS IMPLEMENTATION Situation Report as at 16 February 2015 Amos Makarau Chair of the RAI WIGOS Implementation Task Team.
World Meteorological Organization Working together in weather, climate and water RA VI Workshop on the Implementation of WIS Sofia, Bulgaria, 1 – 3 November.
Truus Warsodikromo Head of the Synoptic Division Meteorological Service Suriname address: RA-IV WIGOS Implementation.
WMO RA I WIGOS Implementation Workshop, Walvis Bay, Namibia, 2-4 November 2015 WIS CENTRES SUPPORTING WIGOS Francis Mosetlho OPS-FABL-WMO RA I WIGOS_2-4.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Progress Report Document 3.5 Prof G-R-Hoffmann.
World Meteorological Organization Working together in weather, climate and water RA VI Workshop on the Implementation of WIS Sofia, Bulgaria, 1 – 3 November.
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
GCOS Welcome and Update
WIGOS regulatory and guidance material
The Plan, Status and First Results
WIGOS Implementation Activities in RA IV
Report by the President
Concept Proposal for RA-III Regional WIGOS Centre
Regional WIGOS Centres
The CGMS Baseline in the WIGOS Regulatory Material
The Jakarta Declaration
Report of EG-PWS EG-PWS Co-Coordinators Mr Lap-shun Lee
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
IAEA Perspectives on Implementation of the optimization principle
Review of RA-I 16th Session Resolutions related to
RAII WIS IMPLEMENTATION PLAN
WIGOS Data Quality Monitoring System (WDQMS)
Agenda Item 3.4 Manual on WIS
(Dakar, Senegal, 28 – 30 September 2016)
The Plan, Status and First Results
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
R. Kolli Chief World Climate Applications & Services Division
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
WIGOS Implementation Activities in RA IV
WIS overview Submitted by: Secretariat (Doc 02b)
Regional WIGOS Centres
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
Roadmap to Enhanced Technical Regulations of WMO
Agenda item 2.3 Report of OPAG ISS Matteo dell’Acqua
Status of the WMO WIS Implementation at NOAA/NWS October 2015
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS implementation in RA II
Role of NMHSs in the WIGOS Implementation
REPORT BY THE CHAIR OF THE OPEN PROGRAMME AREA GROUP ON THE DATA-PROCESSING AND FORECASTING SYSTEM Ken Mylne
GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)
Inter-Commission Coordination Group On WIGOS
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Overview of WMO Strategic Planning Initiative
Co-chair Introduction
WIGOS Preparedness Report by RAI
Flood Forecasting Initiative
(Name of the country) Presentation
Workshop (… 2016) WIGOS Project Office
Status of RA II WIS Implementation Plan
Status and Plan of Regional WIGOS Center (West Asia) in
Drivers of Change Challenges and Consequences
Guidance on WIGOS Data Partnerships Draft v1.0
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
Regional WIGOS Centre Tokyo
WIGOS Implementation in Region IV
Development of common training materials
WIGOS regulatory and guidance material
Regional WIGOS Centre Plans of India
The WIGOS Pre-Operational Phase
Trinidad & Tobago Presentation
The status and Plan in 2019 for the WIGOS centers in RA II
COLLABORATION AND ENGAGEMENT WITH CROSS-CUTTING WMO PRIORITIES; WIGOS MAIN OBSERVING COMPONENTS GLOBAL CRYOSPHERE WATCH 25 Jan 2019 Árni Snorrason Chair,
Inter-Commission Coordination Group On WIGOS
Presentation transcript:

WMO Information System RA-I Working Group on Observation, Telecommunication and Infrastructure 26 September 2016

Contents WIS as essential infrastructure WIS planning in Region I Status of WIS in Region I

WIS as essential infrastructure

WIS underpins all activities Observations NWP Climate SWFDP

Where are the observations?

RA-I WIS Implementation Plan: http://wis.wmo.int/file=1139 WIS Planning in RA I RA-I WIS Implementation Plan: http://wis.wmo.int/file=1139 1. Executive Summary 2. Introduction 3. Scope and purpose of the RA I WIS Implementation Plan 4. Description of WIS 4.1 WIS Services 4.2 The structure of WIS 4.3 WIS Centres 4.4 WIS data networks 4.5 Benefits of WIS 4.6 WMO information sources and regulations on WIS 5. WIS in Region I (Africa) 5.1 Current status of RA I telecommunication 5.2 WIS centres in RA I 6. WIS planning and implementation by RA I Members 6.1 Pre-requisites for participation WIS operation by an NMHS as an NC 6.2 Pre-requisites for participation of WIS operation by other centres 7. Challenges associated with WIS implementation in RA I 7.1 General WIS acceptance 7.2 Lack of staff resources for operational WIS centres 7.3 Discovery Metadata knowledge 7.4 Adoption of new technologies at national level 8. RA I WIS Implementation Plan – Execution and Timeline 8.1 Approval 8.2 Regional coordination and monitoring 8.3 National Implementation Plans 8.4 Capacity-building – training and support 8.5 Goals and timeline 8.6 Progress and Performance Monitoring Time line (readable version on later slide) 2014 (a) September 2014: RA I WG-OI/ad hoc TT-WIS workshop – set the direction for WIS implementation; (b) November 2014: Updated Regional WIS Implementation Plan available in English and French; (c) Mid-December 2014: RA I Management Group has reviewed Regional WIS Implementation Plan; (d) December 2014: National WIS Focal Points notified to WMO and national preference for Principal GISC notified to TT-WIS (Appendix III); 2015 (e) 14 February 2015: RA I-16 adopts Regional WIS Implementation Plan; (f) April 2015: Formal notification from PRs to WMO of their Principal GISC together with the agreement of that GISC; (g) Mid-2015: GISC Pretoria becomes operational and workshop introducing RA I Members to WIS and GISC Pretoria; (h) Mid-2015: GISC Casablanca becomes operational and WIS training workshop; (i) Mid-2015: subject to funding approval, conduct “train the trainer” metadata management workshop; (j) May 2015: National Focal Points inform TT-WIS of target operational dates for national WIS centres; (k) May 2015: Cg-17 informed about the RA I WIS Implementation Plan; (l) April–December 2015: Act on the National WIS Implementation plan by each Member, with the help and support from its Principal GISC, to archive the goal outline at the beginning of this paragraph. Information Actions Risk Monitoring

September 2016 Status of WIS in RA-I

Status of plan - 2014 milestones 2014 (a) September 2014: RA I WG-OI/ad hoc TT-WIS workshop – set the direction for WIS implementation; (b) November 2014: Updated Regional WIS Implementation Plan available in English and French; (c) Mid-December 2014: RA I Management Group has reviewed Regional WIS Implementation Plan; (d) December 2014: National WIS Focal Points notified to WMO and national preference for Principal GISC notified to TT-WIS (Appendix III);

Status of plan – 2015 milestones (e) 14 February 2015: RA I-16 adopts Regional WIS Implementation Plan; (f) April 2015: Formal notification from PRs to WMO of their Principal GISC together with the agreement of that GISC; (g) Mid-2015: GISC Pretoria becomes operational and workshop introducing RA I Members to WIS and GISC Pretoria; (h) Mid-2015: GISC Casablanca becomes operational and WIS training workshop; (i) Mid-2015: subject to funding approval, conduct “train the trainer” metadata management workshop; (j) May 2015: National Focal Points inform TT-WIS of target operational dates for national WIS centres; (k) May 2015: Cg-17 informed about the RA I WIS Implementation Plan; (l) April–December 2015: Act on the National WIS Implementation plan by each Member, with the help and support from its Principal GISC, to achieve the goal outline at the beginning of this paragraph.

Status of WIS implementation in RA-I September 2016 Countries with WIS Focal Points: 27 GISCs Casablanca operational Pretoria operational Training French Casablanca GISC training (French, English, Arabic) WIS/WIGOS workshop No volunteer Second workshop English Nairobi WIS training (assisted by GISC Casablanca) Pretoria WIS training being planned

Planned activities Casablanca Teleconference with WIS centres attached to GISC Casablanca This should an activity supporting RA-I WG-OTI Pretoria WIS training/planning workshop being planned for end of October. Invitations not yet sent Secretariat Pilot project to help Regional Training Centres deliver training

In summary

Key Actions RA-I WG-OTI has to make this happen GISCs operational Nominate Focal Points Train technical managers and staff Provide discovery metadata Improve exchange of information Use WIS capability Make procedures work RA-I WG-OTI has to make this happen

Multi-Hazard Warnings WIS WIGOS GFCS Multi-Hazard Warnings

Thank you Merci