C. Adorisio Extracted from the presentation given at

Slides:



Advertisements
Similar presentations
Simulations des niveaux de radiations en arrêt machine M. Brugger, D. Forkel-Wirth, S. Roesler (SC/RP)
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains S. Bally, O. Beltramello, I. Bergstrom, N. De Bortoli, H.Vincke,
ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Dose Measurements S. Roesler (DGS-RP) Collimation WG – IR3 passive absorbers 4 June 2012.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
RSSOs at CERN Prepared by Ans Pardons for the CERN RSSO training day With input from J. Pedersen.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
1 July 2004 Radiation Protection Issues 1 M.Brugger, D.Forkel-Wirth, S.Roesler, H.Vincke SC/RP Review of the LHC Collimation Project 30 June – 2 July 2004.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains O. Beltramello, H. Vincke, G. Corti on behalf of the Working.
Radiation Protection: How (radio)active are we going to be? S. Roesler (on behalf of DGS-RP) Chamonix 2011 LHC Performance Workshop January 24-28, 2011.
The Panorama of the Future Radioactive Areas from now to 2020 S. Roesler on behalf of DGS-RP Workshop on remote manipulations and diagnostics in radioactive.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
1 Assessment of previous ORE evaluation by comparison with 3D exposure analysis. Analysis of the main difference contributors and optimisation of the calculation.
ENERGY DEPOSITION AND TAS DIAMETER
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
S. Roesler (on behalf of DGS-RP)
TAXS and TAXN ABSORBERS - OVERVIEW
Transposition of Requirements set out in the Basic Safety Standards for Nuclear Facilities in Lithuania Gintautas KLEVINSKAS Albinas MASTAUSKAS Radiation.
Installation of an Instrument on a CERN machine
Residual dose rates in the FCChh detector
Radiation Protection Issues After 20 Years of LHC Operation
HEL – Safety aspects Christelle Gaignant
Radiation protection of Linac4 M. Silari Radiation Protection Group
Accelerator and Experiment Interface Session: LS2, LS3
Review of the MQW and MBW lifetime taking into account results from the reading of the dosimeters collecting data in the 2016 RUN Dosimeter (installation,
IP7 losses scaling and impact on forecast for HL-LHC era
Dose levels at the SPS, monitoring and calculation.
Valloni A. Mereghetti, E. Quaranta, H. Rafique, J. Molson, R. Bruce, S. Redaelli Comparison between different composite material implementations in Merlin.
Energy deposition studies in IR7 for HL-LHC
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
Optimization of radiation protection at Bohunice NPP
1st HiLumi LHC / LARP Collaboration Meeting 2011 Nov 17th
Thomas Hansson & Francois Javier, ESH
FLUKA Energy deposition simulations for quench tests
Current Radiation Protection Legislation in Slovakia
Presentation transcript:

HL-LHC - Residual Dose Rate Estimations in the LSS1 and LSS5 (from TAXS up to Q7) C. Adorisio Extracted from the presentation given at 7th HL_LHC Collaboration Meeting – CIEMAT, 13-16 November 2017

Outline A reminder Residual dose rate outlook Summary Rules and regulations Limitation Optimization/ALARA Optimization during design Methodology Design options Residual dose rate outlook LHC/HL-LHC operation scenario considered FLUKA geometry Residual dose rate estimations Summary A reminder C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

Rules and regulations a reminder

Safety Code F Limitation Design and operation ! Radiation Workers Not occupationally exposed workers Environment Category A: 20 mSv/y Category B: 6 mSv/y 1 mSv/y 0.3 mSv/y C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

Safety Code F Limitation Total number of working hours per year: 2000 hours (example: Supervised Area 3 µSv/h × 2000 h = 6 mSv) Low-occupancy: < 20% of working time C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

Safety Code F Optimization (ALARA) Design and operation ! Optimization by balancing: individual doses number of persons exposed risk costs consequences of potential failures Workers on CERN site 100/10 µSv/yr Outside of CERN (environment) 10 µSv/yr C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

Safety Code F Limitation / Optimization 6/20 mSv/yr 1 mSv/yr 300 mSv/yr Radiation Workers On CERN site Other workers Population outside CERN Optimization / ALARA to be demonstrated 100 mSv/yr 10 mSv/yr 10 mSv/yr Limits Optimization Thresholds Optimized (by definition) C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

Optimization during operation ALARA procedure CERN dose objectives Operational Periods Long Shutdowns 3 mSv/yr Primary criteria Individual Dose Collective Dose Secondary criteria Ambient dose equivalent rate Airborne activity Surface contamination Level I Level II Level III 100 mSv 500 mSv 1 mSv 5 mSv 50 mSv/h 5 CA 10 CS 2 mSv/h 200 CA 100 CS Detailed work-and-dose planning ALARA committee ALARA categories for individual interventions 100 mSv / intervention C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

Residual dose rate outlook

LHC/HL-LHC Operational Scenarios Year of (HL-)LHC Operation Peak / levelled luminosity [cm-2s-1] Integrated luminosity [fb-1] ≤2012 0.8E+34 30 LS1 2015 6.30E+33 4 2016 1.40E+34 40 2017 1.60E+34 50 2018 LS2 (2 years) 2021 2.0E+34 60 2022 2023 LS3 (3 years) Nominal Ultimate 2027 5.0E+34 7.5E+34 250 300 2028 2029 LS4 (1 year) 2031 2032 2033 LS5 2035 2036 2037 LS6 past ~TOT 350 fb-1 HL-LHC 3 blocks of 3 consecutive years of operation + 1 year Long Shutdown each Nominal: 5.0x1034 – 250 fb-1/y Ultimate: 7.5x1034 – 300 fb-1/y TOT ~2600 fb-1 TOT ~3050 fb-1 C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

LHC – Simulation geometry Long Straight Sections in the two interaction regions, IR1 and IR5: Actual machine layout Real collimators settings Thanks to the FLUKA Team LHC IR1 LSS LHC IR5 LSS C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

LHC – Simulation/measurement comparison During the year, simulations are performed in order to prepare the Work and Dose Planning (WDP) in advance for each Technical Stop (TS) Radiation measurement, which performed at the beginning of TS, in order to classify the area and prepare WDP for interventions, used to benchmark the simulation C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018

LHC - Residual Dose Rate estimation LS3 – IR1 Ambient dose equivalent rate – 1 month cooling time ~ 4050% more Residual dose rate estimations are available for LS2 and LS3 periods and can be used for the individual/collective dose evaluation for the consolidation/dismantling works C. Adorisio - Study & Readiness for the LS3 dismantling activities of WP8, 28 September 2018