Saclay Test Facilities

Slides:



Advertisements
Similar presentations
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Advertisements

3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
THALES ELECTRON DEVICES
FCC week March 2015 Marriott Georgetown Hotel Superconducting RF: Novel Cavity Concepts & Cryomodules Fundamental Power Coupler (FPC) Eric Montesinos,
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
SPL Collaboration Meeting _ IN2P3 December 11 th 2008 Patxi DUTHIL.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
1 Main Linac Design Chris Adolphsen GDE SLAC April 6-7, 2006 MAC Review at FNAL.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
 High Power RF Systems (352 MHZ - 12 GHz)  High Efficiency Power Sources  High Voltage Systems  High Gradient Accelerating Structures.
First 200 MHz Superconducting Cavity for NuFact H. Padamsee, R. Geng, E. Chiaveri, R. Russo Presented by D. Hartill.
I. Syratchev, April 2015, EuCARD2, Barcelona. Review of Efficient RF Sources I. Syratchev, CERN.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
WG4 Summary RF Power, Industrial and Medical
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Third SPL Collaboration Meeting – CERN - 11 November 2009S. Chel 1 XFEL: cryomodule assembly at CEA/Saclay XFEL facility & Superconducting linac Main assembly.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
J. Osborne LHeC Linac Design Issues Frank Zimmermann 10 December 2010.
Status of E-XFEL Module Assembly at Saclay
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Status of SCRF Accelerator Activities at CEA-Saclay
WP5 Elliptical cavities
Development of high-power IOTs as an efficient alternative to klystrons Morten Jensen Energy for Sustainable Science 24 October 2013, CERN.
High Energy Proton Synchrotrons
Thales Klystrons for Linacs
Uppsala Commitment to ESS and FREIA Planning
Plans for a Superconducting Proton Linac at CERN
The situation is far better than I had thought.
Notkestrasse 85, Hamburg, Germany
CW Operation of XFEL Modules
Superbeams with SPL at CERN
Review of the European XFEL Linac System
Status of RF Group HZB (former BESSY) Wolfgang Anders.
Nick Walker (DESY) EU GDE Meeting Oxford
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
EU-XFEL summary of performance degradation
A Superconducting Proton/Electron Linac
Cryomodules Challenges for PERLE
On the Korean Contributions for
Presentation transcript:

Saclay Test Facilities 2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI

Industrialisation of XFEL Cryomodule Assembly Cryomagnetism 30 November2010 Industrialisation of XFEL Cryomodule Assembly

Industrialisation of XFEL Cryomodule Assembly Cryomagnetism 30 November2010 Industrialisation of XFEL Cryomodule Assembly

Industrialisation of XFEL Cryomodule Assembly Superconducting RF 30 November2010 Industrialisation of XFEL Cryomodule Assembly

Industrialisation of XFEL Cryomodule Assembly Superconducting RF 30 November2010 Industrialisation of XFEL Cryomodule Assembly

Industrialisation of XFEL Cryomodule Assembly Clean Room Layout ISO 7 (class 10 000) 28 m2 5.92 m x 4.72 m ISO 5 (class 100) 38 m2 7.72 m x 4.72 m ISO4 (Class 10) 112 m² 7.8 m x (6.6+7.8) m 15.6 m 30 November2010 Industrialisation of XFEL Cryomodule Assembly

Industrialisation of XFEL Cryomodule Assembly Cryogenics 30 November2010 Industrialisation of XFEL Cryomodule Assembly

Industrialisation of XFEL Cryomodule Assembly High RF Power Two 352 MHz klystrons of 1 MW CW (LEP) on loan from CERN One 1.3 GHz klystron, 1.5 MW, 1ms 10Hz pulsed (Thales) One 704 MHz klystron, 1MW pulsed (CPI) One 704 MHz IOT, 80 kW CW 30 November2010 Industrialisation of XFEL Cryomodule Assembly