W. Shannon Black Manager, Standards Processes New Chair Orientation
Overview Role of the Chair Role of Staff Role of WSC The “Procedures” Development Principles Procedural Mandates
The Role of the Chair Primary Secondary Timely product of work product Ensure the team keeps moving forward Facilitate within the four-corners of the Procedures “Voice” of the team Coordinate with the WSC as needed Secondary Subject Matter Expert
The Role of the WECC Staff Support Manage the calendar / admin / website Technical support on Due Process Technical support on quality review / drafting Produce and control all documents File with NERC/FERC as required
The Role of the WSC Procedural Oversight Approve the SAR Appoint the drafting team Monitor each posting Approve for ballot Forward to Board / Interface with the Board The Standing Committee no longer controls the development process.
The “Procedures” WECC/NERC/FERC Approved Document Exhibit “C” of the Delegation Agreement Basically a Contract Contains specifics of delegated authority Is not all inclusive Needs interpretation Staff will assist
Development Principles The DT’s Development Principles includes the following: All DT meetings shall be open and publicly noticed on the WECC website. A 15 day notice period is required to hold a DT meeting. Notice of each DT meeting shall be posted on the WECC website for a minimum of 15 days prior to the meeting.
Development Principles All participants eligible to vote in a Ballot Pool retain full opportunity and representation to vote on the final document. Nothing in these Development Principles shall infringe on an individual’s appellate rights under the Reliability Standards Development Procedures (Procedures). All DT members are encouraged to always be present; proxy voting by a DT member is not allowed.
Development Principles The Procedures do not require a quorum to be present before a DT vote is taken. The Procedures do not require notice that a DT vote will be taken. The Procedures do not require notice that a subset of the DT will meet. An affirmative majority vote of the entire DT is required to forward a document to the WSC with a recommendation for ballot. For all other actions, a simple majority vote of the DT members present is sufficient to carry a ballot.
Development Principles DT voting may take place face-to-face, electronically, in real-time, or within a scheduled window. Voting on which position to adopt on a drafting issue is reserved for the DT members. Voting on inclusion or exclusion of specific language in the document under development is reserved for the DT members.
Development Principles Voting on minutes and related business motions is reserved for the DT members. Straw Polls are of excellent advisory value; however, the DT is not obligated to abide by a straw poll.
Procedural Basics 15 day notice to hold a meeting Draft it Posting 1 = 45 days Posting 1+= 30 day (minimum) Respond to all Comments Post Responses Redraft and Repost as needed WSC / Board / NERC / FERC
Drafting Basics Follow the NERC templates Avoid Applicable entities NERC Functional Model for Standards Not required for “Other Projects” (Criteria) Requirement and Measures Each X shall do Y. Evidence may include… Avoid Adjective, pronouns, adverbs Do not incorporate by reference Don’t use “C”aps unless defined
Responses to Comments Each Comment Requires a Response Can be aggregated
Questions?