Program Design Addendum Process

Slides:



Advertisements
Similar presentations
What it takes to sign your contract Heather Kelley Contracts & Administrative Services Manager.
Advertisements

Steps to Homeownership and the Homebuyer Assistance Program Process Homebuyer Education ClassLoan OriginatorReal Estate Specialist HAP Processing Loan.
Sandhills Center ICF-MR Provider Training. ICF-MR Level of Care Initial Review  An ICF-MR Level of Care (prior approval assessment) is required for any.
NCLB Monitoring NCLB/ESEA Cycle Legal Requirement: EDGAR Part 80.40(a)—monitor subgrant activities to assure compliance with applicable.
Independent Health Facilities Changes to IHFP Relocation Policy Presentation to IDCA Presented by: Nora Peterson Diagnostic Services & Planning Branch.
Step by Step Process. Checklist and Form Instructions A checklist is provided on the website to help applicants track their progress in completing the.
0 SMCS CME Program CME Documentation Kristine Wakefield June 23, 2011.
Page 1 of 23 The FMT system utilizes Roles to determine ownership and levels of responsibility within the FMT system. The Well Licensee/Unit Operator is.
 Receive an Approval Letter from DIDD Provider Enrollment Coordinator.  Contact per letter’s instructions, Julia Jinnette by phone, or letter.
Small Enough to Give the Personal Touch Diversified Evaluation Network, Inc. Toll Free: (888) Fax: (248) Independent Medical Evaluation.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
1 LSE Certification Process ERCOT August 23, 2006.
Office Procedure Manual and Checklist W. Mack Palmour Director of Admissions Gainesville State College.
Post Completion OPT ITU Admissions. Topics Covered  What is OPT  Who is Eligible  How to Apply  When to Apply  Forms  Mailing your Application 
DOI Complaint Response Timeline Claims Services 2015 This timeline is applicable to DOI Inquiries/Complaints for all states where we do business. The dates.
NCLB Monitoring September 19, 2012 Webinar.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) April 2013.
Setting up a Public Information Coordinator (PIC) System Lauren Downey, Office of the Attorney General Cary Grace, City of Austin Bob Davis, Texas Department.
On Site Review Process. 2 Overview of On Site Review Materials and Process.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March 2012.
Children System of Care Application Process for Behavioral Assistance & Intensive In-Community Department of Children and Families, Children’s System.
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
0 Vendorization Process HABILITATION SERVICES. 1 Title 17 Requirements  All existing Title 17 vendorization regulations that apply to regional center.
Florida Department of Business and Professional Regulations Ken Lawson Juana Watkins Secretary Director Division of Real Estate.
Rationale, Policies and Procedures OSP Seminar May 27, 2014.
2017 Annual Travel Coordinator Training
CayuseIRB A Quick Start Guide for IRB, IACUC, and IBC Researchers
Dependent Eligibility Audit CEWW Health Insurance Consortium
Eligibility Process for Cohort 4 & 5 HRA Approval Studies (post CSP) RM&G Lead’s 09 March 2015 Louise Lambert: Non-commercial Research Initiatives.
Ray Street Academy Home of the “Lions”
Polices, procedures & protocols
PLWG Review 6.9 and the Interconnection process
Hiring Manager onboarding
End User Process Help - (Canada)
With rosa sanchez pdr coordinator
Getting Started- Online Submission
End User Process Help - (Canada)
Independent Contractor Process New and Improved
Submission and Approval of Graduate Student Documents
CAEP Orientation: Newcomers
/ProStartProgram /ProStartProgram
Navigating the A-Z of Physical Therapy Licensure
Receiving Transmittals from Contractors
Offer Process in PageUp
Emergency License Suspension, Closure and Systems Improvement Agreements Presenters: Mary T. Henderson, TX LTC, Derek Jakovich, TX LTC and Ramiro Cantu,
Curricular Practical Training
Super Heroes in Training: Budgeting & Purchasing
Non-Geographic Porting Process : SWEDEN
Ocean Transportation Intermediary License Renewal System February 2017
Residential Placement Application 2011
Retail Markets Producer Portal Demo.
Click Training Agreements Module
HREC Operating Procedures for the Review of Low and Moderate to High Risk Projects
Current Service Agreement Proposal Process
F-1 OPT Workshop.
Document Submission, Acceptance, and Validation Process
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
Geographic Porting Process : SWEDEN
The SMI Evaluation and Determination Process
Change of Facility Name
Performance Indicators
Psychology Learner Quick Start Guide: Practicum/Internship Application
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
GSA eBuy Seller’s Tutorial
Welcome to the NC-SARA Webcast SARA Notification Requirements
Using the AIM Alternative Testing Module (for Instructors)
Using the AIM Alternative Testing Module (for Students)
Psychiatric Residential Treatment Facility- PRTF
Using AIM (for Instructors)
Curricular Practical Training
Presentation transcript:

Program Design Addendum Process Resource Development

Types of Changes Change of Ownership/ Entity Change For Sole Proprietors becoming Limited Liability Corporations, Corporations or a Partnership. Facility Name Change Location Change Type Change Change in Program/Service Design Change in Mailing Address, Email Address or Phone Number (process does not require an addendum and is completed with the Vendorization unit directly)

Addendum Process for Change in Ownership/Entity, Name Change or Type Change Before Contacting IRC to make the change, must be in the process of updating Community Care Licensing, Department of Health, Professional or Business License as applicable. A current updated license reflecting the change, or proof that it is in pending status is required. Before the process is complete a copy of the updated and active license must be submitted. IDT meetings with IRC Consumer Service Coordinator, and the individual to occur to review the changes being made. *Please note: For Change in Ownership/Entity, new prospective provider will be required to attend IRC’s New Residential Provider Orientation.

Letter of Intent Notify the QA Liaison of change in writing. Send the Letter of Intent to NRSPO@inlandrc.org Must contain the following: Vendor Name Current Licensee and Administrator (if applicable) Type of change requested Indicate whether or not the Tax ID will be changing RDTU CSTIII will respond to the email with a checklist to complete the addendum

Addendum Checklist The addendum must then be completed according to the checklist, and with all required supporting documentation included. Once complete, the addendum, supporting documentation and the checklist should be sent to RDTU by email at NRSPO@inlandrc.org. The addendum will then be assigned to a Community Resource Specialist to review. With each submission the Community Resource Specialist has 45 days to review the addendum Once Approved, the Community Resource Specialist will inform the vendor and forward the addendum and supporting documentation to the Vendorization Unit to complete the Vendorization process.

Addendum Process for Location Change Prior to any location change, the new location must first be approved by IRC’s Quality Assurance Liaison. Inform the QA Liaison in writing of the proposed location and moving date, and request to schedule a walkthrough of the new location with QA Liaison. At this point it is advised to begin the process of getting the new location licensed with Community Care Licensing. If QA Liaison approves the new location, RDTU will be informed, and a program design addendum checklist will be emailed. Return the completed addendum, with all necessary attachments and the checklist to RDTU by email at NRSPO@inlandrc.org The location change addendum will be assigned to a Community Resource Specialist for review. (with each submission there is a 45 day timeline to review) Once approved, the Community Resource Specialist will respond in writing.

Change in Program/Service Design IRC must be notified 30 days prior to any change to the program design or service design in accordance to Title 17, Sections 56712(B); 56762(C), 56780(B) Notify QA Liaison, of the requested change in writing A Community Resource Specialist will be assigned to request an addendum With each submission the Community Resource Specialist has 45 days to review the addendum Once approved, the vendor will receive written notification, and The Community Resource Specialist will notify all applicable parties, including, Vendorization, Quality Assurance and the RDTU Program Manager. A copy of the approved addendum will be sent to IRC’s Vendorization and Quality Assurance Units.

Questions???