Nuclear Physics Group Meeting

Slides:



Advertisements
Similar presentations
1. Find the cost of each of the following using the Nearest Neighbor Algorithm. a)Start at Vertex M.
Advertisements

LI Gain Curves Peter Litchfield Calibration Workshop, 6 th September 2005  Beginning to understand the LI system  Beginning to understand the software.
1 Augmenting Path Algorithm s t G: Flow value = 0 0 flow capacity.
FNAL TB09 Plots Alessandra Borgia Syracuse Unviersity Marina Artuso, Jianchun Wang, Ray Mountain January 20, 2010.
1 Augmenting Path Algorithm s t G: Flow value = 0 0 flow capacity.
Status on Testbeam Analysis Jianchun Wang Syracuse University VELO meeting, August 28, 2007.
Potpourri Vishnu V. Zutshi Northern Illinois University.
1 Cluster Quality in Track Fitting for the ATLAS CSC Detector David Primor 1, Nir Amram 1, Erez Etzion 1, Giora Mikenberg 2, Hagit Messer 1 1. Tel Aviv.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
Responsibility on Next Beam Test Jianchun Wang Syracuse University BTeV meeting 06/27/01.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
What’s the object(ive) of tracking? some things: – hits, wires, clusters, track segments, tracks, trajectories, outer detector matching hits, ….. some.
LEPS Analysis Meeting Kalman Filter of TPCana Jia-Ye Chen
Mu Zhu, University of Waterloo MITACS Workshop Presentation Mu Zhu.
EAS Reconstruction with Cerenkov Photons Shower Simulation Reconstruction Algorithm Toy MC Study Two Detector Configuration Summary M.Z. Wang and C.C.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
KEK data analysis Carleton-TPC (Ar/iC4H10)(95/5) (Ar/CF4)(95/5) B = 1T & B = 0T  ~ 0° & 4 GeV/c  +
Testing of Latch-TDC Da-Shung Su Jia-Ye Chen, Hsi-Hung Yao, Su-Yin Wang, Ting-Hua Chang, Wen-Chen Chang 2011/07/13.
Status of K S   e analysis C. GattiT. Spadaro Selection on data Selection on MC Efficiencies from data, K L   e, K S    ,      , bhabha.
SLAC fDIRC data processing for Hawai’i electronics (SLAC experiment T-492 ) Larry Ruckman & Gary Varner Instrumentation Development Laboratory (ID-Lab)
Pixel Offline Study Jianchun Wang Syracuse University 11/05/04, Pixel testbeam meeting.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
IC59 Cascade Filter Comparison between the recos for (HLC+SLC) and (HLC only) pulses Part I Mariola Lesiak-Bzdak LBNL 1 Cascade Phone Call, Nov. 8, 2010.
Calorimeter Assisted Track Finder Tracking Infrastructure Dmitry Onoprienko Kansas State University Linear Collider Workshop 2007 May 30 – June 3, 2007.
A Clustering Algorithm for LumiCal Halina Abramowicz, Ronen Ingbir, Sergey Kananov, Aharon Levy, Iftach Sadeh Tel Aviv University DESY Collaboration High.
RPC Timing Results with Final Splitters Gianpaolo Carlino INFN Napoli The Napoli RPC Group: M.Alviggi, V. Canale, M. Caprio, G.C., R. de Asmundis, M. Della.
CLAS12 Trigger System part1: Level1 EC Revision 1, Feb 7, 2007.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
Feature Extractor Dima Chirkin, LBNL The future is here.
GE1/1-III GEM Cluster Size and Resolution Studies with the FNAL Beam Test Data Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida Institute of Technology.
Current Status of MDC Track Reconstruction MdcPatRec Zhang Yao, Zhang Xueyao
1 S, Fedele, Student Presentations, 2004/08/04S Amazing Title Slide Reworking the CES Cluster Reconstruction Algorithm By: Steve Fedele Advisor: Pavel.
1 TPC Meeting Institute of Physics, Academia Sinica Jia-Ye Chen
Pile-Up Pulse Decomposition Jia-Ye Chen
1 Status report 2011/8/12 Atsushi Nukariya. 2 Progress ・ FPGA -> Revision is completed. -> Obtained data from front-end chip. ・ Software.
SRS Calibration Part II: Dynamic Range, Signal/Noise, Pulse Shape and Timing Jitter + initial results from scan of FIT zigzag board Michael Phipps, Bob.
RT 2009, 15 th May 2009 Pulse Pile-up Recovery Using Model-Based Signal Processing. Paul. A.B. Scoullar, Southern Innovation, Australia. Prof. Rob J. Evans.
DT calibration software: tentative release schedule S.Bolognesi & S.Maselli & G.Mila Alignement&Calibration Meeting, 25 January 2008, CERN.
Photon Selection Algorithm Ming Yang , Mingshui Chen BESIII Meeting
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Hot Cell Algorithms. Threshold – hot if recHit energy > certain value NADA – hot if recHit energy large compared to sum of neighbor cells Digi – hot if.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
Click Here for Horizon Fitness Australia
Software Design.
Status of Electronics Simulation and Energy Resoluton Estimation
Zhu Han University of Houston Thanks for Dr. Mingyi Hong’s slides
Suman Bhunia and Shamik Sengupta
Michael Lupberger Dorothea Pfeiffer
Tips Need to Consider When Organizing a College Event
أنماط الإدارة المدرسية وتفويض السلطة الدكتور أشرف الصايغ
ماجستير إدارة المعارض من بريطانيا
Simulation study for Forward Calorimeter in LHC-ALICE experiment
Presented at 2016 IEEE Nuclear Science Symposium - N28-32
Aspects of Training Be aware of what should included within a training session Understand training thresholds.
Pad Response Function Update & Puzzle
Bi-Weekly Meeting 2004/09/08 Susumu Oda
Please send any images as a separate file
differentiate double pulse
MUC simulation and reconstruction
Map Information Visualization
LEPS Collaboration Meeting in Taiwan Update of TPC Analysis (II)
Pad Response Function Nuclear Physics Group Institute of Physics, Academia Sinica Jia-Ye Chen
Signal Detection & Processing
Hough 工作进展.
Studies of the Time over Threshold
Beam Beam electronics Block diagram disc gated disc gate disc gated

BES III Software: Short-term Plan ( )
differentiate shoulder pulse
FIT detector as Luminometer for RUN3
Presentation transcript:

Nuclear Physics Group Meeting Jia-Ye Chen 2007.06.27

Outline Pile-up Pulse Decomposition Study Saturated Pulse Pulse Identification : Done & Well Efficiency : Improve Fitting (Kumac : Well & C : ?) Residual : Bad Hit position ?? Saturated Pulse Event Display

Algorithm for Identification Pile-up Pulse peakAdc > threshold (dynamic threshold) Separation of peakTdc > 2 clocks Pulse valley away from prevPeakTdc > 2 clocks Shoulder Pulse ( By Su-Yin Wang ) Δ(ΔADC ) < -8. Separation to neighboring peakTdc > 3.

Fitting of Saturated Pulse

Virtual peakAdc

Fitting of Saturated Pulse

Virtual peakAdc

Fitting of Saturated Pulse

Virtual peakAdc

Event Display

Event Display

Event Display

Event Display

Event Display

Event Display

Event Display

Event Display

Event Display

Event Display

Event Display

Event Display

Residual OLD NEW