CONTOUR NGIMS Electronics Test History

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 1 GATS Cosmic Dust.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
SphinX - electronics and software The schematic representation of the instrument’s electronics. Details of the software together with respective Electrical.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Solar Probe Plus A NASA Mission to Touch the Sun Andy Driesman.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly September 10-11, 2008.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
FIELDS MEP Thermal Vacuum Cycling iPER
Solar Probe Plus – FIELDS Main Electronics Package
GLAST Large Area Telescope:
Gayle K. Martin November 14, 2016
Code Generation from SEDS
I&T&C Organization Chart
(EFW Systems Engineer) University of California, Berkeley
ESA GSE.
GLAST Large Area Telescope:
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
FIELDS SCM Thermal iPER
CONTOUR NGIMS PRE-SHIP REVIEW
StratoBuoy II Matt Voll Brian Mayernik Pat O’Hara.
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
Digital Sub-System Bob Goeke.
CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly
Launch and On-orbit Checkout
GLAST Large Area Telescope
Integration and Test Organization Chart
Operation of Target Safety System (TSS)
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Presentation transcript:

CONTOUR NGIMS Electronics Test History Florence Tan Code 915/Swales Oct 29th, 2001 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

NGIMS Flight Electronics Test Summary All boards tested individually at temperature (-45C, RT, 60C) voltage (+/- 10% where applicable) Number hours assembled flight electronics tested: 400-500 at room temperature Comet encounter mass sampling strategies for closed and open sources 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

NGIMS Test Configuration Vacuum Test System – Simulates comet environment except for dust and high speed neutral gas Spacecraft Simulator Simulates spacecraft command and data handling system A PC with a 1553 I/F card Ground Support Workstation Oracle database for: Commanding functions Telemetry data repository 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

Vacuum Test System 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

NGIMS Sensor 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

NGIMS Electronics 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

NGIMS Flight Electronics Testing Testing done between July 9th - October 12th 2001 Room Temperature Phases: Ongoing V&V Ongoing Baseline Lens Tuning at Goddard Calibration at Goddard Spacecraft interface at APL 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

Testing Details – Ongoing V & V and Baseline Tests July 9th 2001 – Oct 12th 2001 Tested GSE, HW & SW using V&V SW Generated and tested instrument baseline and functional tests for verifying operation of the instrument from calibration to post-launch 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

Testing Details – Lens Tuning July 9th 2001 – September 16th 2001 To determine best lens voltages Ion source cleanup prior to gas calibration by simultaneously operating all 4 filaments Analog hardware DAC's calibrated and engineering unit conversions determined Exercised limits of high voltage amplifiers Characterized analog response times and slew rates 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

Testing Details – Calibration August 28th 2001 – September 16th 2001 Calibration closed source and open source thermally accommodated gas modes tested using single gases mass peak tuning determined using high molecular weight compound open source testing with an ion gun over energy range expected for comet encounter and flight parameter values determined for equations tested in-flight gas calibration system 500+ Baseline, characterization & calibration runs 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

Testing Details – Spacecraft Interface at APL Oct 9th, 10th, 11th 2001 Verified connector between S/C and NGIMS Powered on using S/C power Commanded NGIMS using S/C GSE Collected and verified telemetry from S/C 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

GSE Test Setup at APL 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History

CONTOUR Spacecraft / NGIMS Interface Test 10/24/2001 C:\Documents and Settings\Ftan\My Documents\NGIMS Electronics Test History