1st Quarter 2013 VRL Report Gentry Tubbs gtubbs@spp.org.

Slides:



Advertisements
Similar presentations
Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless.
Advertisements

1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
A set of ordered pairs is called a __________.
Interval Heaps Complete binary tree. Each node (except possibly last one) has 2 elements. Last node has 1 or 2 elements. Let a and b be the elements in.
Appendix of Interval Data Plots RESLOWR Round 2 Load Research Report.
Describing Trends in Graphs
SPP Priority Projects Nebraska Area FCITC Sensitivity Analysis.
T ransmission I mprovement For the Red River Valley & West Central Minnesota.
Goshen Area Bus Reconfiguration
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
AMCF Materials Characterization School 2012 X-Ray Photoelectron Spectroscopy Tim Morgan.
 The AirForce 1 Turbines (and most other battery charging turbines) need to be kept under load at all times  The reason for this is that without the.
Let’s go back to this problem: We take N samples of a sinusoid (or a complex exponential) and we want to estimate its amplitude and frequency by the FFT.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Discussion: Use of RAPs in system operations Kris Dixit 1.
DC-DC Converters (choppers) The objective is to convert a fixed DC voltage to a variable DC voltage It is possible to step up and step down voltage.
2nd Quarter 2013 VRL Report Gentry Tubbs
Borah Mitigators Remedial Action Scheme for the Borah West Path Sponsored by: IDAHO POWER Team Members: Kyle Jones Mark Magee Jason Rippee.
Chapter 1-Kraemer.  Undulating periodization  Use a 1 week or 2 week cycle as opposed to a 4 week  Initial concept used hypertrophy (8-12 reps) and.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
West to North CSC Location Scenario 3b WMS August 20, 2008.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
Market Operations Presentation ERCOT Board of Directors October 21, 2008 Updated as of 10/21/08 Betty Day.
QMWG 10/7/13 Generation Resource Energy and Regulation Deployment Performance.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
How to describe changes in numbers and graphs. Bar graph.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
ERCOT 2004 RELIABILITY ASSESSMENT (CONTINGENCY EVALUATION) Purpose Test ERCOT transmission system one year in advance Determine if meeting planning criteria.
3rd Quarter 2013 VRL Report Gentry Tubbs
Voltage Support Service (VSS) for CREZ Region Advanced Network Applications ERCOT.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
3nd Quarter 2014 VRL Report Gentry Tubbs
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Compare and Contrast Reliability Assumptions Bob Pierce May 12, 2006.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Barrilla Junction Area Transmission Improvements Project
Compare and Contrast Reliability Assumptions
Baldwin Traffic Simulation Model for the 9th Elementary School Building Committee John Doggett TMM P13 4/25/2017.
Ensuring Security of Supply in Estonian Transmission Grid
Load Balancing: List Scheduling
4th Quarter 2013 VRL Report Gentry Tubbs
التدريب الرياضى إعداد الدكتور طارق صلاح.
Local Area Planning Update to TRANSAC – September 26, 2018
Building a Combined 25F Nomogram Step 0: Define Terms
Mount St Helens: APRIL 1980 Mount St Helens: APRIL 1981
Integers.
ITP20 Flowgate Selection Introduction

Part (a) Remember that the 1st derivative is the slope. We can find the slope by using Algebra. T’(7) = T’(7) = -7 2 oC / cm.
ECE 476 POWER SYSTEM ANALYSIS
4th Quarter 2012 VRL Report Gentry Tubbs
-1oC It is 4oC The temperature drops by 5 degrees
Physical Geography Geography of Canada.
Load Balancing: List Scheduling
' · · ,.-.., '' !'",. -,..._ ·-.·-...;.· -
Online Pogo Game Customer Service
Pogo Game Customer Care Helpline Number

Call Pogo Contact Phone Number and Enjoy Pogo Game
Presentation transcript:

1st Quarter 2013 VRL Report Gentry Tubbs gtubbs@spp.org

Beginning of Violation TEMP64_18632 Beginning of Violation End of Violation Intervals VRL_TYPE VRL_VALUE ($) CONSTRAINTNAME SHADOWPRICE_AVG ($) 1/30/2013 17:55 1/30/2013 18:55 13 OC VRL 750 TEMP64_18632 585 Monitored Element- JEC – AUBURN 230kV Contingent Element - JEC – SUMMIT 345kV Reason for Violating: Increasing load and decreasing wind as we approached evening load peak.

Beginning of Violation TEMP28_18528 Monitored Element- Hayes – Vine 115kV Contingent Element - Postrock – Knoll 230kV Reason for Violating: Increase in West Kansas wind. Issued was resolved after sharp drop-off in wind. Beginning of Violation End of Violation Intervals VRL_TYPE VRL_VALUE ($) CONSTRAINTNAME SHADOWPRICE_AVG ($) 3/17/2013 13:40 3/17/2013 14:45 14 OC VRL 532 TEMP28_18528 951