Rail Safety Summit 1st November 2018 Ian Prosser CBE

Slides:



Advertisements
Similar presentations
Be part of the solution \\ HSEs strategy for health and safety in Great Britain Name Non Executive Board Member / Director… Health and Safety Executive.
Advertisements

Protecting and serving the people of Kent Chief Constable Alan Pughsley Past/Current/Future impact of cuts 21 st November 2014 ‘Provide a first class service.
1 Strategy for risk based health and safety regulation Richard Price IRSC Conference.
Thames Water Behavioural Safety Briefing 1½ hour.
1 The Health and Safety of Great Britain \\ Be part of the solution Geoffrey Podger Chief Executive Health and Safety Executive.
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
Be part of the solution \\ HSE’s strategy for health and safety in Great Britain Eddy Tarn Operational Strategy Division Health and Safety Executive.
Health and Safety Executive Health and Safety Executive Key challenges for the UK construction industry & SMEs Philip White Chief Inspector of Construction.
HSE Plan meeting - November – Health, Safety & Environmental Plan 2015.
International Railway Safety Conference 2008 A regulator’s challenge – inspecting the right things Allan Spence HM Deputy Chief Inspector (Operations)
Leading health & safety on Britain’s railway A strategy for working together Presented by.
Cross Industry E-Reps Forum Increasing Environmental Awareness and the role of the E-Rep 21 November 2012.
Scotland’s Colleges is a trading name of both the Scottish Further Education Unit and the Association of Scotland’s Colleges Incident Recording, Reporting.
Overview Role and function of the Authority
Introduction to Workforce Planning
Office of Rail Regulation
The health and safety at work Act - a new way of thinking
Occupational Violence A health, safety and wellbeing response
September 2009 Presentation to IRSC 2009 Arthur D. Little Limited
“How to make cheese – Cheddar takes longer to mature than Emmental”
Strategy for risk based health and safety regulation
Stakeholders’ Meeting for Strategic Vision
Future Rail and Road developments
Focus on What's Important
Responsible Care Conference
HSE Leadership On The Front Line
Psychological Health and Safety in the Workplace
Title of the Change Project
Safety Systems & Practices for Project Delivery – The Hatch Way
Accident investigations: developments and roles
Improving Patient Safety in the NHS
STEP OVERVIEW PRESENTATION
Accident investigation: what’s the point?
Lifting the quality of risk control
HSE Update Elizabeth Warren Health and Social Care Services Team
Eight principles of quality management.
KEYNOTE STAGE SPONSOR.
Increasing Asset Lifecycle through the application of Innovative Technology
Volunteer Role Description for: Location: Main contact:
Compensation Committee 2017 Goals – Updated
Behavior-based Safety (BBS)
Volunteer Role Description for: Location: Main contact:
Fatigue Risk Management
HAVS: Where do we need to be?
1st October 2018 Volunteer Role Description for: Location:
Boost Your Competitive Strength by Standards!
Transport - Strategy and Sector Plan
Preconditions of chronic disease March 2018
Thank you for this opportunity.
GMHC Board of Directors November 14, 2016
Diffusion of Patient Safety and Performance Improvement across Cambridge Health Alliance: Starting the Journey Gouri Gupte PhD, MHA Director of Performance.
2018.
Harm to assets and equipment
Safe at heart: HS2 Together
QUALITY, HEALTH, SAFETY & ENVIRONMENTAL POLICY
Learning from near misses

Situation Monitoring Know the plan, share the plan, review the risks.
Safety & Health Programs
Safety & Health Programs
Building effective Safety Cultures
Patient Safety WalkRounds
Self Care in Glossop.
Maureen McAteer, Scottish Government
The Role of Mindfulness in Workplace Health & Safety
Behavior-based Safety (BBS)
Safety & Health Programs
Folkestone & Hythe District Council
HAVS: Where do we need to be?
Quality Conversation –
Presentation transcript:

Rail Safety Summit 1st November 2018 Ian Prosser CBE HM Chief Inspector of Railways

Structure of Presentation Our long standing Vision and Goal. The Challenges – Learning the Lessons from recent incidents including Croydon. The Focus - for all parts of the sector going forward to continue the journey for the next ten years.

Our Vision and Goal For 10 years we have had the same Vision and Goal for the GB Rail Sector Vision “Zero Industry caused fatalities and ever decreasing risk to passengers, the workforce and the public”. Through the Goal of: “Excellence in Health and Safety Management and Risk Control, measured through our RM3 Model”.

The Risk Management Model (RM3)

About a Conversation….

Learning the Lessons However, even as we see continuing improvement and fewer major and high potential events, we still need to learn, in particularly around, how to eliminate the very low frequency but high consequence event so getting to the bottom of the triangle is key. Although, we now have our Precursor Indicator Model at its lowest ever level and in one year 2015/16 achieved the Vision, we need to use the Near Miss Data and Lower Level Precursors more. Driving greater use of RM3 across the sector. Sharing more and having more of those conversations (we are working with you to improve RM3 as well). The Recognising that People Performance is critical.

Precursor Indicator Model by Group

However…. Croydon Were there enough controls?

Also seen …. Near misses for track workers in amongst trains and serious construction injuries. Major Infrastructure failures for Civils – Age/Poor Weather. Public fatalities at the interface with the Railway (Level Crossings and Trespass). Issues in managing change and its impact on people.

So what are some of the key challenges Supporting our People They are very often the last line of defence Handling the modern world - pace of life etc. Culture and behaviours and complete Health Management

So what are some of the key challenges (2) Technology Using technology developments to create the extra barrier, increased defence The need to take the human interaction into account, lots of developments ongoing Changing working practices Ensure the Human interface is right

So what are some of the key challenges (3) Pressure on the System Lots of change with plenty of new equipment Increased traffic aging infrastructure Financial strains The External Environment

The Focus going forward 1. On our People Competency in the broadest sense Workload and environment (managing stress) Fatigue management (inside and outside work) The strengths and weaknesses of Human Intervention

The Focus going forward (2) 2. Technology Creating the extra barrier Tools to help make the job safer and more efficient (eg IT tools, remote condition monitoring) Remove people away from harm, eg working in amongst trains! Improve performance reliability and predictability.

The Focus going forward (3) 3. Health and Culture Communication from top to bottom “show you care” Mental Health Trust and a “Just” Culture A healthy workforce saves money.

Conclusion It is all about managing risk of the complete system, designing the human interaction and safety into all we do. Measure how we are doing with RM3, as it is about driving for excellence in the key enablers in what we do. Improving the risk models and using all the data we have, connecting it up and the use of Artificial Intelligence. Lets really focus on our People, Culture and Health, including Mental Health. Bringing them along with us during this time of significant challenges and change.

Keeping Britain’s railways safe

Who we regulate

How we ensure a safer railway

Inspection focus is on key safety themes

Our aim is firm and fair enforcement of health and safety law and our inspectors take action in many ways

Moving health and safety forward