Follow up workshop 14 January on streamlining

Slides:



Advertisements
Similar presentations
The Industrial Emissions Directive (IED) 2010/75/EU
Advertisements

1 1 st EIONET Workshop on Industrial Pollution 04 March 2015 Andreas Grangler DG Environment Unit C.4 (new!) – Industrial emissions E-PRTR Refit evaluation.
Workshop Inspire MIG-P/MSCPs and Reporting under environmental aquis January 2015 JRC Ispra Andreas Grangler DG Environment Unit C.3 – Air & Industrial.
Transition to air quality e-Reporting Introduction to e-Reporting: policy driver, IPR pilot activities, timeline, EEA resources, plans for B-G and update.
1 EU Emissions Trading Scheme – New System to allocate free Allowances from 2013 onwards IFIEC Energy Forum Brussels, 9 June 2011 Hans Bergman DG Climate.
Status of INSPIRE implementation in EU Member States. INSPIRE conference – Lisbon, 26/05/2015 Paul Hasenohr, European Environment Agency.
European Commission: DG Environment Streamlining and harmonizing climate change and air pollution requirements TFEIP, 23 – 24 May 2007, Dessau Eduard Dame.
TFEIP-Meeting May 2010 Jochen Theloke 1/ 5 E-PRTR – spatial mapping of diffuse emission sources project Jochen Theloke, Thomas Gauger, Balendra Thiruchittampalam,
E-PRTR dataflow management Introduction and informal review process Eva Goossens Head of Industrial Pollution Group Air and Climate Change Programme.
| Folie | Folie 2 Reporting according to pollution registers Experiences in Austria Mag. Daniela Wappel.
E-PRTR Refit evaluation and Article 17 official data review 1 2 nd Global Round Table on PRTRs 25 November 2015 Andreas Grangler.
The current legal situation
1 Integration of the LCP Reporting Into the E-PRTR Scope and Technical proposal November 3rd.
1 Integration of the LCP Reporting Into the E-PRTR Scope and Technical specifications December 3rd.
Status: Item 6 – WISE developments and Implementation Plan WG D Reporting 21 March 2006.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Monitoring Fact Sheets DIKE TSG1 04. July 2013, Copenhagen Proposal for the use of web-based monitoring “fact sheets” for the purpose of MSFD reporting.
Air Quality reporting and INSPIRE
1 The WISE implementation plan and WISE development support by the Technical Group Stefan Jensen WISE GIS workshop Brussels.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
1 Integration of the LCP Reporting Into the E-PRTR Current status and Technical proposal August 4th.
Reporting on industrial installations
Streamlining of Industrial Emissions Reporting
Support in the implementation of the REFIT actions for ELD phase 2
Joint Research Centre The European Commission’s in-house science service.
Improving assessment of GES Draft conclusions and Way forward
Workshop on the Integration of the LCP Reporting into the E-PRTR
Review of Decision 2010/477/EU and MSFD Annex III
Fitness Check of environmental monitoring and reporting
Review of Decision 2010/477/EU and MSFD Annex III
D1 BIODIVERSITY REVIEW PROCESS
Working Group on estuaries and coastal zones
on Priority Substances Strategic Coordination Group
IPPC Directive Discussion on Reporting on ELV and BAT 4th Reporting Questionnaire, Q. 6.1 IEEG meeting 7 December 2010.
Streamlining of Reporting on Industral Emissions
19th meeting of the WG GES 22/03/2018
Integration of the LCP and E-PRTR dataflows
7. Further developments to improve the IT tools
IPPC Review Stakeholder Hearing
Reporting on Large Combustion Plants under the IED
E-PRTR Refit evaluation and Article 17 official data review
IMPROVING PUBLIC INFORMATION
Management of Natura 2000 Sites
Information on projects
Background document: How to build the Inventory of Emissions, Discharges and Losses: main elements and compilation of existing datasets (2007) DG on inventory.
Natura 2000: points of information
Jill Michielssen European Commission, DG Environment
European Commission, DG Environment Air & Industrial Emissions Unit
Updated information on integration of EU water policy into WISE WD meeting June 2008 Unit D.2 Water and.
WG GES: Decision review progress
J-P. FONTELLE and J-P. CHANG
Updated information on integration of EU water policy into WISE SCG meeting May 2008 Unit D.2 Water and.
The Biodiversity Information System for Europe (BISE)
Water Directors meeting Mondorf-les-bains, June 2005
Quality aspects of EPER
INSPIRE & Art.17/12 reporting
2nd EIONET NRC workshop on Industrial Pollution
Scene setter European Commission DG Environment
Data specifications for IED Annex II Module 4
DG Environment, Unit D.2 Marine Environment and Water Industry
Projects under Pillar I of White Paper on Climate Change Adaptation
DG Environment, Unit D.2 Marine Environment and Water Industry
Review of Decision 2010/477/EU and MSFD Annex III
PRTR in the Netherlands
UWWTD SIIF 2nd Workshop 24 October 2013
Final Version (after MS revision)
Large Combustion Plants dataflow management
Marine Environment and Water Industry
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

Follow up workshop 14 January on streamlining Meeting of the E-PRTR Expert Group 27 November 2014 Andreas Grangler DG Environment Unit C.3 – Air & Industrial emissions 1 1

Streamlining reporting E-PRTR / IE Expert Group workshop 14 January ─ follow up IEEG-3 paper IEEG Meeting 13 June 2013 Comments Implementing Decision IED 2012/795/EU Annex I (2014) Annex II (2017) OJ L 349 p.57 19.12.2012 IEEG/E-PRTR workshop 14 Jan 2014 IEEG-4 paper IEEG Meeting 6 May2014 2012 2013 2014 2

1 2 3 Integration Web form Web form Web form 3 Article 17 official data review 1 2 3 Integration Web form Web form Web form 3

Next steps Reporting on implementation of Directive 2010/75/EU (linking) 1 Reporting on LCPs under IED (integration) 2 3 Further possibilities on streamlining Article 17 official review – E-PRTR REFIT evaluation – project 2015 4

1 Project setup 2015 2016 2017 2018 Task 1: Initial phase Data speci-fications Work plan Methodology Task 2: Develop-ment phase XML, offline-tools, aggregation tools, QA/QC Task 5: Testing phase Deployment, testing with MS, bug fixing, support Task 6: Reporting phase Hosting maintenance Task 7: final phase Processing, database, bug-fixing, handover Task 3: Meeting Task 3: Meeting Testing Task 4: Documentation Technical specification, manual, handover documentation 2015 2016 2017 2018 5

Decision 2012/795/EU - Annex II (IED) Module 2 – installation level – (linking) Reference numbers (IED, E-PRTR, SEVESO, ETS) Name, activities (Annex I IED), other relevant chapters of IED Contact information (name, address, location) competent authorities for permits and inspections and number of site visits Permit information (link to permits, derogations, baseline report) Inspire relevant information

Thank you very much! DG ENV C.3 Andreas.Grangler@ec.europa.eu +32-2-29-66700