Class “B” Appraisal Implemented Lessons Learned

Slides:



Advertisements
Similar presentations
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Advertisements

More CMM Part Two : Details.
Process Improvement.
Standard CMMI Appraisal Method for Process Improvement (SCAMPI)
200209–CSSA0001 – 16/25/ :30 AM CSSA Cepeda Systems & Software Analysis, Inc. SCAMPI.
External Quality Assessments
Supplier Relationship Management
PM Summit Overview Daniel Vitek MBA, PMP – Consultant to CDC.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
CMMI Course Summary CMMI course Module 9..
The Evergreen, Background, Methodology and IT Service Management Model
Integrated Capability Maturity Model (CMMI)
COMPANY CONFIDENTIAL Page 1 Final Findings Briefing Client ABC Ltd CMMI (SW) – Ver 1.2 Staged Representation Conducted by: QAI India SM - CMMI is a service.
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
A Project ’ s Tale: Transitioning From SW-CMM to CMMI-SE/SW Warren Scheinin Systems Engineer, NG Mission Systems CMMI Technology Conference & User Group.
CMS 00_ Copyright 2002 Raytheon Company All Rights Reserved CMMI – What a Difference a Sponsor Makes! Ann Turner Raytheon Company
Copyright 2003 Northrop Grumman Corporation 0 To PIID or Not to PIID: Lessons Learned in SCAMPI Evidence Preparation To PIID or Not to PIID: Lessons Learned.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Lecture Topics covered CMMI- - Continuous model -Staged model PROCESS PATTERNS- -Generic Process pattern elements.
Managing CMMI® as a Project
Everything You Ever Wanted to Know About CMMI in 30 Minutes or LESS CCS TECHNICAL SERVICES (484) CCS TECHNICAL SERVICES (484) William.
Software Engineering - I
Making knowledge work harder Process Improvement.
Minimizing SCAMPI Costs via Quantitative Methods Ron Ulrich, Northrop Grumman Rick Hefner, Northrop Grumman CMMI.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
IMPLEMENTING LEAPS IN CENTRAL AND EASTERN EUROPE: TRAINERS’ HANDBOOK Monitoring and Evaluating Results.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
DoD Template for Application of TLCSM and PBL
Project Monitoring Review Class 22 Project Monitoring cont
Sample Fit-Gap Kick-off
Transitioning from CBA-IPI to SCAMPI Appraisals: Lessons Learned
A Program of Training for CMMI®-based Process Improvement
An Effective and Efficient Approach to ARC C Appraisals
The Business Plan : Creating and Starting The Venture
Project life span.
ISA 201 Intermediate Information Systems Acquisition
The Business Plan : Creating and Starting The Venture
Chapter 10 Software Quality Assurance& Test Plan Software Testing
Software and Systems Integration
SAMPLE Develop a Comprehensive Competency Framework
Identify the Risk of Not Doing BA
Project Integration Management
Process Maturity Profile
CMMI Q & A.
TechStambha PMP Certification Training
Presented To: 3rd Annual CMMI Technology Conference and User Group
CMMI Overview.
CMMI – Staged Representation
VENDORS, CONSULTANTS AND USERS
Quality management standards
AdvancED/SACS and Strategic Planning Update
Roadmap to an Organizational Culture of QI
Chapter 2 Performance Management Process
By Jeff Burklo, Director
Use of Tailored PIIs November 17, 2003
Project Management Process Groups
The Community Project Silver Spring International Middle School
Software Engineering: A Practitioner’s Approach, 6/e Chapter 2 Process: A Generic View copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
A Case Study of Transitioning: The CMMI Rosetta Stone
Experiences with a Single PA SCAMPIsm
Presented to National Defense Industrial Association
Small Organizations are Different?
Process Improvements Achieved From Using The CMMI Model: A Success Story At Raytheon’s SAS Engineering Organization Presented to National Defense Industrial.
Independent Expert Program Review (IEPR)
Employee engagement Delivery guide
TECHNOLOGY ASSESSMENT
Internal Audit Who? What? When? How? Why? In brief . . .
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
Presentation transcript:

Class “B” Appraisal Implemented Lessons Learned Presented to National Defense Industrial Association 3nd Annual CMMI Technology Conference and User Group Denver, Colorado Adrio DeCicco Space and Airborne Systems Raytheon El Segundo, CA November 17-20, 2003

Space And Airborne Systems (SAS) Engineering Appraisal Strategy Presentation Title April 3, 2019 Space And Airborne Systems (SAS) Engineering Appraisal Strategy Use The CMMI Model To Measure Process Maturity Selected The Staged Representation And Maturity Level 3 Include Systems Engineering (SE), Software Engineering (SW), Configuration/Data Management (CM/DM), Quality Assurance (QA), And Supply Chain Management (SCM) Form An Integrated Process Group To Develop And Implement CMMI Based Process And Product Improvements SAS Enterprise Process Group (EPG) Conduct A Series Of Both Formal And Informal Appraisals CMMI typical work products were never intended to specify the direct work products that the SCAMPI now expects, so additional guidance is needed. TWPs are today incomplete, and a mixture of direct and indirect 4/3/2019 Speaker Name

Lessons Learned – Executive Management First And Foremost, An Organization Needs A Dedicated And Committed Executive Management Team Provide Leadership And A Vision Identify The Need Measurable Process And Product Improvement Customer Requirements Future Business Opportunities CMMI Representation (Staged Or Continuous) And Rating Level Identify The Scope Entire Or Part Of The Organization SE And/Or SW; Other Disciplines Identify Resources Funding, Resources, Time Frame, Etc. Be The Driving Force 4/3/2019

Lessons Learned – Need A Highly Skilled Process Group Come From Various Engineering And Support Disciplines Does Not Necessarily Depend Upon The Organizations/Disciplines Involved In The Appraisal The “I” In CMMI For Instance, PM Activities Are Spread Throughout The Model Supplier Agreement Management (SAM) Process Area, Etc. Depends Upon How You Are Organized Engineering Make Up (SE, SW, CM/DM, QA, Etc.) Trained In, And Understand, The CMMI Model And The Standard CMMI Assessment Method For Process Improvement (SCAMPI) Possess Skills And Years Of Experience In Their Discipline (s) Also Have Organizational, Planning, Team, And Communication Skills 4/3/2019

Enterprise Process Group (EPG) Appraisal Documentation Collection Flow   Enterprise Process Group (EPG) Programs Program 1 Program 2 Program N Document Collectors Document Validaters Appraisal Document Data Base Appraisal Tool   Appraisal Team 4/3/2019

Lessons Learned – Build A Mature Appraisal Team Interview And Select A Knowledgeable And Compatible Lead Appraiser Understanding Of Your Business/Organization And The Model And SCAMPI Needs To Have The Expertise To Cover All Of The Process Areas Being Considered For The Appraisal Have Same/Similar Team Make Up, Skills And Knowledge As The Process Group The Team Should Consist Of Members Who Have Prior CMMI Appraisal Experience Note: Persons With Less Experience May Participate If They Have Participated In The Previous Set Of Appraisals To Gain Knowledge And Experience Have Members From Within And Outside Of Your Organization Internal Members Can Explain The Organization And Process And Product Development External Members To Provide Their Knowledge Of Other Organizations And An Unattached And Different Viewpoint 4/3/2019

Lessons Learned – Organize The Appraisal Team The Lead Appraiser Should Manage The Appraisal Like A Project Organize Sub-teams That Best Align Each Appraisal Member With His Or His Skills To Particular Process Areas QA Member Be Part Of The PPQA Process Area Consider The Pros And Cons Of Having A Local Appraiser Appraise A Program They Are Working It Is Also Beneficial To Move Appraisers Among Sub-teams Provide A Different Perspective Gain Knowledge And Become A More Diversified Appraiser If A Team Member Cannot Support A Future Appraisal, Other Team Members Will Be Familiar With The Process Area Have An Appraisal Schedule And Work To The Schedule In/Out Brief, Interview Sessions, Team Consolidation, Etc. Especially During The First Week, Sub-teams Should Work Late To Complete Document Reviews Ahead Of Schedule Team Consolidation, Observations, Findings, Etc. Will Consume Time Later 4/3/2019

Lessons Learned – Develop An Appraisal Strategy With The Lead Appraiser Selection Of Appraisal Team Members Within And Outside Of Your Organization And Company Skills And Expertise Required Selection Of Programs/Projects Consider Life Cycle, Program/Project Availability, Etc. Determine In Brief Topics To Provide An Understanding Of The Organization, Processes, And Programs Determine The Level Of Data Review Goal, Some Sub-practices, All Sub-practices, Etc. Approximate Number Of Direct And Indirect Documents To Achieve Compliancy 4/3/2019

Lessons Learned – Select An Appraisal Tool Select An Appraisal Tool That Is CMMI Based And Easy To Use Has CMMI Process Area And Sub-practice Descriptions Has The Capability To Contain Links To Soft Copies Of Documents In General, It Is Easier For Appraisers To Access And View Large Quantities Of Documents Electronically Places To Add Comments, Observations, Findings, Classify Documents As Direct/Indirect, Enter Results, Etc. Note: This Is A Short List To Provide Some Ideas Regarding Tool Features, Which Are Beyond The Scope Of This Presentation 4/3/2019

Lessons Learned – Documentation Collection Team Map Out A Strategy For Document Collection Collect Documents To Satisfy Goal, Some Sub-practices, Or All sub-Practices Level Coordinate The Documentation Strategy With Programs And Develop A Document Collection Strategy With Programs Process And Program Points Of Contact For Each Process Area How Documents Will Be Collected Hard Copies/Soft Copies/Sensitive/Etc. Program E-mails Or Process Document Collector Has Access To Program Server And Who Will Provide URL Addresses For “Hot Links” 4/3/2019

Lessons Learned – Document Validation The Document Validation Team Should Work Very Closely With The Document Collectors Prior To Document Collection, Validaters Identify The Types Of Documents Expected For Each Goal And Or Sub-practice Presentation Material Should Also Include Attendee List, Meeting Minutes, And Action Items In General, Attendee List, Meeting Minutes, And Action Items Serve As Indirect Evidence Generate A List Of Expected Documents For Each Sub-practice Months Prior To The Appraisal Document Validation Should Result In Documents That “Tell The Story” Of How The Organization Or Program Is Performing Its Activities Show A Thread From The Initial Activity To The Final Activity Of A Process Program Plans Provided As Evidence In The Project Planning Process Area Should Be The Same Plans That Are Shown Being Monitored And Controlled In GP 2.8 And Objectively Evaluated In GP 2.9 Document Collectors Validate The “Hot Links” If Using An Appraisal Tool The Week Prior To The Appraisal 4/3/2019

Lessons Learned – Document Collection And Support Team Team Is Needed To Produce Documents Prior To The Appraisal And Comply With Data Requests During The Appraisal Document Collectors Should Be Trained In The CMMI Model Understand What Is Expected For Direct, Indirect, What Is Relevant, Compliancy, Etc. Better Understanding Between Document Collectors And Validaters Train Document Collectors On How To Enter Data Into Electronic Spreadsheets If A Tool Is Used Be Aware That Friction Can Develop Between The Document Collectors And The Document Validaters Collectors May Produce In Excess Of 7,000 Documents Collectors Believe They Already Produced Documents Requested By Validaters Or Appraisers May Not Be Relevant May Be Shown In One Process Area But Also Applies In Other Process Areas 4/3/2019

Presentation Title April 3, 2019 In Summary Need To Have A Dedicated And Committed Executive Management Team Need A Highly Skilled Process Group Design And Implement A Documentation Collection Process Build A Mature Appraisal Team Manage And Organize An Appraisal As If It Were A Project Plan Early And Often Over The Appraisal Life Cycle Develop An Appraisal Strategy With The Lead Appraiser Select An Appraisal Tool Be Prepared To Work Hard And Often, And Be Flexible Enjoy The Results – You Earned It! Different approaches to PIIDs and preparing for appraisals are taken. The approach depends on many factors, such as initial maturity, time line goal, and internal expertise Scorecarding Class C and B appraisals (prepare and readiness assessment) 4/3/2019 Speaker Name