R. Messner May 2004 Readiness Review

Slides:



Advertisements
Similar presentations
Chapter 7 Flow Control Valves and Other Hydraulic Valves
Advertisements

E906 Gas System 1/7/09 LANL Meeting D. Northacker UIUC.
Installing & Testing Regulators
ČVUT v Praze Fakulta stavební Katedra technických zařízení budov ČVUT v Praze Fakulta stavební Katedra technických zařízení budov SE 20- Heating Control.
André Augustinus 16 June 2003 DCS Workshop Safety.
Sales Meeting June 2006 Vogel Single Line Progressive Lubrication Systems Presented by: Ricardo Gomez.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
The Combination Station Status Report Alex Rust & Nate Lamie.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
C. Lu, K.T. McDonald RPC Flammable Gas Monitor April 15, RPC Flammable Gas Monitor Based on Gas Chromatography Changguo Lu, Kirk T. McDonald Princeton.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
 Switches are commonly employed as input devices to indicate the presence or absence of a particular condition in a system or process that is being monitored.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
More practice with Fractions, Decimals and few other review items Are You Ready for the Test!
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Original CPC Box schematic
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Workshop developed by RCAP/AWWA and funded by the USEPA
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Emission Control Topics covered in this presentation:
Infrastructure & Safety
protoDUNE – single-phase Instrumentation - Gas Analyzers
LST Installation Readiness Review
AEGIS Magnet System.
Laser Monitoring System On behalf of the Caltech group
Provides a continuous supply of ready to use product on demand
Air Distribution Control
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Status of the cryogenic system for B180
Radiation Laboratory Meeting
T-6B On-Board Oxygen Generation System (OBOGS)
Teaching slides Chapter 3.
August 23, 2000 R.N. Dubois Dow Chemical
First Break To establish minimum safety requirements when performing a first break “First Break” – Refers to the initial opening of piping/equipment.
LIGHTING OVEN Steps to Follow.
Flotection: Building Main Shutoff System
(a) the equivalent resistance, (b) V0,
Dip. Software based statistics PhD ( physiology), FICA , IDRA
Cryogenics – The Basics
Installation Status & Operational Readiness Process
Cryogenics – The Basics
T-6B On-Board Oxygen Generation System (OBOGS)
Isolation Procedure Topic 2, Unit 6.
Repair campaign 2017 Repair campaign 2016 Repair campaign 2015 TS2 TS1
Needed for Team A on -End
Presentation transcript:

R. Messner May 2004 Readiness Review LST Gas System R. Messner May 2004 Readiness Review

Will cover a few of the items below Gas Mix – the issue of what gas mixtures will be allowed in the LST system has been resolved FHA: O’Neill, Budnick HEEC review Gas Mixing System In leak test Want to test output flows ASAP Integrate with the GIB Gas Interrupt Box (GIB) Finished with checkout Had found problems with firmware; fixed IR-2 Distribution Panels Flow restrictor in hand, checked out Gas Supply Manifolds Next to be assembled Gas Shack Safety System Expansion underway Electrical External Monitor System

Gas Mix Instead of getting a specific mix approved, we want approval for a region of mixes

Gas Mix The operating region takes into account the stability we have seen in the RPC system

Mixing System Functionality A fourth mass flow meter can provide a tie-breaking vote in case of MFM/MFC disagreement Can also pick up small drifts in mixed gas flows Shut-off solenoids will close if the gas mix drifts out of the allowed region

Gas Rack - in leak test

Gas Rack

Gas Interrupt Box Functionality

GIB in checkout

Overview of the IR-2 Distribution

Silica tubing flow resistor

Check of silica tubing flow resistance

Gas Shack Layout Two new inert gas supplies; Each will have a shutoff valve, orifice, overpressure releases Construct a new isobutane supply rack and manifold; Will have two isobutane shutoff valves, orifice

Summary The loose ends involved in determining a permissible gas mix have been resolved Very close to having a functional mixing system with its monitor system to ensure a non-flammable and a runnable mix Use air or nitrogen, check the self consistency and stability of system It is important to keep moving ahead; sufficient and timely technical support is critical Want the gas rack in the gas shack before the end of May Delayed a bit because we want to get the manifolds done first; then we can do more things in parallel Expansion of Gas Shack safety system in progress EPICs monitor system will be the next item to attack

Spare Slides

Looked at the recent performance of the RPC system Snapshots taken a week apart, a half day at a time This is a measure of the stability of the gas mixture +- 0.0005 out of 0.045 Or ~ 1.0 % of the reading

Recent performance of the RPC system Isobutane Fraction in Gas Mixture