Background Mandated by DaimlerChrysler for all tier 1 suppliers

Slides:



Advertisements
Similar presentations
Global Safety Management: Revolution or Evolution? Transitioning to an SMS: Whats Missing?
Advertisements

ISO 9001 : 2000.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Registration Management Committee (RMC) Auditor Training and Workshop Minneapolis, MN July 30-31, 2009WELCOME! Americas Aerospace Quality Group AAQG Registration.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Fundamentals of ISO.
Effectively applying ISO9001:2000 clauses 5 and 8
ISO Quality management International Organization for Standardization International Organization for Standardization It addresses various aspects.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Quality Function Deployment
Detroit Regional Integrated Logistics Center QUALITY ASSURANCE LINC’s Quality System and Introduction to ISO 9002.
Setting up an Internal Audit Program By
ISO 9001: 2000 Certified Audit Process What to do.
Non-conformity Reporting
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
EGA Egyptian German Auto. Co. A DaimlerChrysler joint venture in Egypt Mahmoud Ibrahim ElhefnawiQAADate: Page:1 Error Proofing Error proofing is.
Project Closure. Objectives  Determine when to terminate a project  Identify various reasons why a project is terminated  Describe a project audit.
Quality management systems – Requirements
Internal Auditing ISO 9001:2015
Layered Process Audits Tommy Beheler Quality Manager The Timken Company’s Gaffney Bearing Plant.
QSB Quality System Basics & Q7 tools in practice
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
1 Lesson 9 Managing Food Safety. 2 NASA Food Consultant  You and your team have been put in charge of providing safe food for astronauts traveling to.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
Quality Function Deployment
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Introduction The purpose of this session is to:
Problem 9-3, Page 473 Key Control, Control Test Evaluation
How to Implement an IG Manufacturing Quality Procedure System
Audit Management: Audit Management consists of auditing the deliverables from the phases and tasks which is nothing but verifying the documents and to.
LAYERED AUDITS.
Define, measure, and improve with ISO
Background Mandated by DaimlerChrysler for all tier 1 suppliers
PREPARATION FOR GMP INSPECTION
Fundamentals of ISO.
Daimler-Chrysler Layered Process Audits (DCX LPA)
Daimler-Chrysler Layered Process Audits (DCX LPA)
ISO 9001 Awareness Training.
Introduction In the first lesson we demonstrated the following:-
Setting up an Internal Audit Program
Transition ISO 9001:2008 to ISO 9001:2015
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
Quality Department
Layered Process Audits
Background Mandated by DaimlerChrysler for all tier 1 suppliers
RISK REDUCTION PROCESS
Introduction to ISO & The Quality Process.
Dr. Rob Hasker SE 3800 Note 9 Reviews.
Advanced Product Quality Planning 2nd Edition
DMAIC STANDARD WORK TEMPLATE
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
AS 9100 Awareness Training.
ISO 9001:2008 Quality Management Systems
How to conduct Effective Stage-1 Audit
Quality Audits, and How to Survive them
Utility Billing Balancing the Accounts Receivable
DMAIC STANDARD WORK TEMPLATE
TS
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Better with Augmented Reality
Strategically Aligning Forms Management with Corporate Initiatives
Advanced Product Quality Planning 2nd Edition
HOW TO AUDIT AND TAKE AN AUDIT
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
TS
Nonconformity Writing
TS
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Presentation transcript:

Background Mandated by DaimlerChrysler for all tier 1 suppliers Strongly recommended by General Motors and Ford The Timken Company has been utilizing Layered Process Audits since 2004

LPA’s Like Preflight Checklist. Is Everything Ready for Take-off Definition An ongoing system of process checks that verify proper methods, settings, tools, gages, operator craftsmanship, error proofing devices, and other important inputs are in place in order to achieve optimal results. Redundant process checks to make sure everything is right. Ensure multiple eyes looking at the process to ensure the key work steps are being performed properly.

Requirements for LPA’s LPA’s shall be conducted for high risk elements at a minimum of once per shift. Checklist of high risk items can be established using reference items such as, customer complaints, warranty issues, PFMEA, etc. Audit items should be unambiguous and specific. LPA results should be recorded and posted and reaction plans for non-conformances found during audit shall be documented.

Requirements for LPA’s Non-conformances should be corrected immediately. Audit results shall be summarized and reviewed by plant leadership (non-conformance database) Successive levels of plant leadership shall perform the exact same audit as the first level auditors and insure that first level audits are being done.

Requirements for LPA’s LPA items can be added and taken away. An audit item should not be deleted, unless the risk is eliminated and verified. LPA items should be limited to those items critical to the process or the plant’s objectives. Avoid putting too many items on the audit. Continuously improve the audit process (living document). 20% Scrap Reduction Goal

Benefits of LPA’s Multiple layers verifying critical processes are ready to go. (Rib Angle) Gives management a reason to be on the floor. Makes management presence on floor commonplace. Ensures problem solving solutions (corrective actions) stay in place. Identifies problems upstream, before issue reaches customer. Generates continuous improvement opportunities. 20% Scrap Reduction Goal

Roadblocks to LPA’s Culture shift in some cases to have associates do audits each shift and have management looking over their shoulder. Too many items on LPA, makes it impossible task Can become rubber stamp process. Managers get busy and don’t follow through on audit, undermining audit importance. 20% Scrap Reduction Goal

Roadblocks to LPA’s Nothing done with the data Verification of LPA item not clear to everyone (different interpretation of OK) 20% Scrap Reduction Goal