INDUSTRIAL COMPLEX & PECEM PORT
INDUSTRIAL COMPLEX AND PECEM PORT DIRECTOR PLAN POWER PLANT INTERMODAL – CARGO TERMINAL REFINERY PREMIUM II CSP (COMPANHIA SIDERÚRGICA DO PECÉM) INDUSTRIAL ZONE ZPE (ZONA DE PROCESSAMENTO DE EXPORTAÇÃO)
GENERAL INFORMATION PECEM PORT TERMINAL 56 KM FROM FORTALEZA BONDED PORT AREA: 1,000 HA TERMINAL OFF-SHORE MONTHLY AVERAGE: 40 SHIPS HANDLING OF 4.1 MILLIONS TONS DEPTH UP TO 17 m STRATEGIC LOCATION: EUROPE AND USA HANDLING OF 154,000 TEU’S 3 PIERS: 6 BERTHS
TERMINAL INFRA ACTUAL SITUATION
BREAKWATER “L” TYPE OF BREAKWATER, WITH LENGTH OF 2,768M (1,800M PARALLEL OF LAND AND 968M PERPENDICULAR OF LAND. PURPOSE TO BRING CALM WATER WHERE CAN SHELTER 3 PIERS.
PIER 1 HANDLING PRODUCT TECHNICAL FEATURE DESIGNED FOR SOLID DRY-BULK OPERATION. CURRENTLY HANDLE COAL AND GENERAL CARGO (STEEL COIL, DOWEL AND STEEL WIRE). TECHNICAL FEATURE LENGTH 350M WIDTH 45M INTERNAL BERTH EXTERNAL BERTH PRODUCT SOLID DRY-BULK GENERAL CARGO DEPTH 15M 16M VESSEL’S GROSS CAPACITY 75.000 TPB 125.000 TPB
PÍER 2 HANDLING PRODUCT TECHNICAL FEATURE DESIGNED FOR LIQUID CARGO AND LIQUID GAS. CURRENTLY OPERATE FOR NATURAL GAS WITH LNG (LIQUEFIED NATURAL GAS) STATION TECHNICAL FEATURE LENGTH 396M WIDTH 35M INTERNAL BERTH EXTERNAL PRODUCT LNG STATION DEPTH 16M 17M VESSEL’S GROSS CAPACITY 125.000 TPB 175.000 TPB
TMUT HANDLING PRODUCT TECHNICAL FEATURE DESIGNED FOR CONTAINER OPERATION AND GENERAL CARGO TECHNICAL FEATURE LENGTH : 760,00M WIDTH : 115,00M DEPTH : 17,00M VESSEL’S GROSS : 140.000TPB CAPACITY
ACCESS POINT UP TO PIER 1 - 1.730M UP TO PIER 2 - 2.143M UP TO TMUT - 2.491M WIDTH OF THE ACCESS POINT - 7.2M CROSSWALK WIDTH - 1,3M TUBING HOLDER - 6,75M
STORAGE AREA 380.000 M²
POWER SUPPLY FOR REEF CONTAINERS PLUG PARK WITH 888 UNITS 3 POWERPACKS WITH THE TOTAL OF 120 PLUGS
GENERATOR GROUP 8 GROUPS OF GENERATOR WITH TOTAL CAPACITY OF 15.250 KW
TWO WAREHOUSE ONE WITH 10.000 m² OF AREA OTHER WITH 6.250 m² OF AREA
LOCALIZATION LATITUDE 30º30’30’’ S LONGITUDE 39º50’00” W Philadelfia 6 days Algeciras 7 days LATITUDE 30º30’30’’ S LONGITUDE 39º50’00” W
CARIBE / GULF / AMERICAS PORT OF SPAIN - AMAZON PECEM SERVICE REGULAR SERVICES NAVIGATION LONG COURSE MARKET CARIBE / GULF / AMERICAS MEDITERRAN / EUROPE EAST COAST USA EUROPA CARRIER MSC HAMBURG SUD MAERSK LINE FREQUENCY WEEKLY WEEKLY (friday) WEEKLY (sunday) SERVICE PORT OF SPAIN - AMAZON PECEM SERVICE SPAIN NEW TANGO SAMBA COMPANY APM NAVIGATION FEEDER MARKET MERCOSUL CARRIER ALIANÇA FREQUENCY WEEKLY (wednesday) SERVICE NORTH SOUTH COMPANY APM
CARGO HANDLING (TON)
CONTAINER HANDLING (TEU’S)
CARGO PROFILE 2012 (TON)
HANDLING SHARE 2012 EXPORTATION LONG COURSE
MODERNIZATION AND TERMINAL EXPANSION UP TO 2017
SERVICE UNIT BLOCK (BUS)
TMUT (2011) 1st STEP OF EXPANSION OF PECEM PORT TERMINAL CEARA STATE GOVENMENT INVESTMENT / BNDES
TMUT PRESENTATION NEW TERMINAL WITH 2 BERTHS TO SUPPORT MODERN GENERATION OF VESSELS – UP TO 4TH GENERATION; EXPANSION ESTIMATED CAPACITY TO HANDLE CONTAINERS 150.000 TEU/YEAR PARA 750.000 TEU/YEAR; DIMENSION : 760m OF LENGTH X115m OF WIDTH; AMOUNT OF IMPLEMENTATION: R$ 410 MILLIONS EXPANSION OF THE BREAKWATER (1.000m); PERIOD OF IMPLEMENTATION: 30 MONTHS STORAGE YARD FOR CARGO : 87.000m2; DEPTH: 17m;
CONVEYOR BELT (2011) 1st STEP OF EXPANSION OF PECEM PORT TERMINAL
27
BERTH FOR EXPORTATION OF SLAB (2015) ROAD ON THE BREAKWATER (2015) NEW BRIDGE OF ACCESS (2015) 2nd STEP OF EXPANSION OF PECEM PORT TERMINAL CEARA STATE GOVENMENT INVESTMENT / BNDES
NEW BREAKWATER (2017) BERTH FOR EXPORTATION OF SLAB (2017) BERTH FOR REFINARY (2017) 3rd STEP OF EXPANSION OF PECEM PORT TERMINAL CEARA STATE GOVENMENT INVESTMENT / BNDES
LAY-OUT FINAL (2017)
PECEM PORT TERMINAL