Tampa Hillsborough Expressway Authority Industry Forum 2/8/2019.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
U.S. 33 Northern Connector Alternative
Environmental Assessment Public Meeting
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Orlando-Orange County Expressway Authority Project Development Process.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Visit Our Website at: Click to edit Master title style.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
2nd Street Drainage and Paving Improvements
Transportation Engineering Business Development Workshop Department M
Four Winds Condominium Association August 2, 2017
PROJECT INFORMATION SESSION Small Business Enterprise
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Central Polk Parkway PD&E Study
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
Downtown Truck Traffic Study
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
The Oakton Condominium Association September 12, 2017
Public Workshop #1 August 18, 2010.
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Public Information Meeting NW 100th Street Reconstruction Project
Tampa Hillsborough Expressway Authority Industry Forum 6/15/2018.
Florida Transportation Commission FY 2009
Mobility Fund High Impact/Low Cost Projects: Cape Fear RPO
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Tampa Hillsborough Expressway Authority
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
SR 400 Express Lanes: Market Sounding
SE 12th Street Roadway Improvements February 8, 2005.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
PROJ. 566(17) LOR PID MAJOR WIDENING
Lyle Parkway to SR 540 (Winter Lake Road)
Wakulla County Airport
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Harbour Island Force Main Replacement
Parks Highway Reconstruction: Lucas Road to Big Lake Road
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
East Selmon Capacity Project PD&E Study Industry Forum
White Flint North Entrance Feasibility Study
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
New Hanover Comprehensive Plan
State Route 55 Improvement Project from Interstate 5 to State Route 91
CalACES JPA Board of Directors Meeting February 22, 2018.
Presentation transcript:

Tampa Hillsborough Expressway Authority Industry Forum 2/8/2019

Introductions Man Le – THEA Contracts & Procurement Manager Dave May, PE – THEA Director of Expressway Operations Bob Frey, AICP – THEA Planning Director Christina Kopp, AICP – THEA Deputy Planning Director Sue Chrzan – THEA Director of Public Affairs & Communication Anna Quinones – THEA Project Manager Jim Drapp, PE – THEA GEC Laura Lockwood-Herrscher – THEA GEC Al Stewart, PE – THEA GEC

Agenda Project Overview & Schedules Whiting Street Ultimate PEIR Misc. Planning & Design Nebraska/Twiggs Improvements SEIR Selmon East PEIR Procurement TRC Members Questions

Whiting Street Ultimate – Whiting Street Extension & Ramps PEIR Project Overview Whiting St. from Jefferson St. to North Meridian Ave. including Reconfiguration of Selmon Expressway on-ramps at Jefferson St. and off-ramps at Florida Ave. PEIR: PD&E study will be conducted as a PEIR No state or federal funds Follow procedures and requirements set forth in FDOT PD&E manual

Whiting Street Ultimate Project Roles: Tampa Hillsborough Expressway Authority (THEA) – Owner/Developer/Operator HNTB – General Engineering Consultant for THEA Project Objective: Evaluate operational & design improvements based on traffic needs, costs, impacts Additional lanes, roadway extension and widening, ramp relocations, widenings and removal and other operational and safety concerns Coordination: THEA’s Selmon South Capacity PEIR SPP/KHA/Stantec

Whiting Street Ultimate Project Public Involvement Public Involvement Plan (PIP) in accordance w/PD&E Manual Advance notification and transmittal letter Public Meetings: Minimum one public meeting Minimum one public hearing Additional stakeholder/small group meetings as needed Develop list of stakeholders Provide website content and update as needed Legal ads, notices, informational material, news releases, mail outs, court reporting, responses to stakeholders Meeting coordination; identify/reserve venue, set up, tear down, meeting notes, agendas, presentations, seating, sound, audio/visual equipment, displays

Whiting Street Ultimate Engineering Analysis Field review Survey – LiDAR 3D Model Geotechnical data Traffic: Existing available data from THEA, FDOT or other agency Current counts, truck counts, ramp and mainline counts Turning movement counts at ramp intersections Traffic methodology statement in accordance with FDOT’s Project Traffic Forecasting Procedure (#525-030-120) Travel demand forecasting TBRPM base year 2015 VISSIM Future years 2026, 2036, 2046 –build alternatives for each year + no build scenario

Whiting Street Ultimate Project Engineering Analysis Evaluate crash data Identify safety improvements Typical sections, design alternatives, access management Structures (preliminary work by KCA & KHA) Drainage Concept plans Prepare typical section package Multimodal accommodations MOT/Phased Construction Comparative analysis and evaluation matrix Preferred alternative ROW and construction estimates Preliminary Engineering Report

Whiting Street Ultimate Project Environmental Analysis Sociocultural Resources Planning consistency Cultural Resources Environmental screening tool Research design and survey methodology Cultural Resources Assessment Survey (CRAS) Natural Environment Noise Contamination Prepare PEIR

Schedule Procurement: February, 2019 – June 2019 Whiting Street Ultimate Project Procurement: February, 2019 – June 2019 PEIR: July, 2019 – December, 2021 Public Meetings: 2020 & 2021

Miscellaneous Planning & Design Roles: Tampa Hillsborough Expressway Authority (THEA) – Owner/Developer/Operator HNTB – General Engineering Consultant for THEA Project Objective: Perform miscellaneous planning, design and CEI assignments Contract Information: THEA will select 3 to 5 consultants Assignments up to $200,000 Design or CEI of Projects with construction value of less than $2,000,000

Schedule Miscellaneous Planning & Design Procurement: March, 2019 – July 2019 PIER: July, 2019 – June, 2022 Three year contract w/two one year options

Nebraska SEIR Project Overview Nebraska Avenue from South of Twiggs Street to North of the Cass Street/Nuccio Parkway Intersection SEIR: PD&E study will be conducted as a SEIR Follow procedures and requirements set forth in FDOT PD&E manual

Nebraska SEIR Project Roles: Tampa Hillsborough Expressway Authority (THEA) –Developer Florida Department of Transportation (FDOT) – Owner/Operator City of Tampa – Owner/Operator HNTB – General Engineering Consultant for THEA Project Objective: Evaluate short-term operational capacity improvements along Nebraska Avenue from south of Twiggs Street to north of Cass Street/Nuccio Parkway Coordination: THEA’s planned DB project to add an additional westbound lane along Twiggs Street from Meridian Avenue to Nebraska Avenue (Project #O-00918) City of Tampa, FDOT & CSX

Public Involvement Nebraska SEIR Project Public Involvement Plan (PIP) in accordance w/PD&E Manual Advance notification and transmittal letter Public Meetings: Minimum one public meeting Minimum one public hearing Additional stakeholder/small group meetings as needed Develop list of stakeholders Provide website content and update as needed Legal ads, notices, informational material, news releases, mail outs, court reporting, responses to stakeholders Meeting coordination; identify/reserve venue, set up, tear down, meeting notes, agendas, presentations, seating, sound, audio/visual equipment, displays

Engineering Analysis Nebraska SEIR Project Field review Survey/aerial photography – LiDAR 3D Modal (curb to curb) Geotechnical data Utilities Traffic: Existing available data from, FDOT, City of Tampa, Hillsborough County or other agency Current counts, truck counts, ramp and mainline counts at toll gantry Turning movement counts at intersections specified in scope Traffic methodology statement in accordance with FDOT’s Project Traffic Forecasting Procedure (#525-030-120) Travel demand forecasting, TBRPM base year 2015 VISSIM Future years 2026, 2036, 2046-operational build analysis for alternatives

Engineering Analysis Nebraska SEIR Project Evaluate crash data Identify safety improvements Typical sections, design alternatives, access management Railroad operations Drainage Concept plans Prepare typical section package Multimodal accommodations MOT Up to three alternatives for Nebraska Avenue Preferred alternative ROW and construction estimates Preliminary Engineering Report

Environmental Analysis Nebraska SEIR Project Environmental Analysis ETDM tool Sociocultural Resources Planning consistency Cultural Resources Environmental screening tool Research design and survey methodology Cultural Resources Assessment Survey (CRAS) Natural Environment Noise Contamination Prepare SEIR

Schedule Procurement: August, 2019 – December 2019 Nebraska SEIR Project Procurement: August, 2019 – December 2019 SEIR: January, 2020 – December, 2021 or earlier Public Meetings: 2020 & 2021

East Selmon PEIR Project Project Overview Recommended Improvements from ongoing East Selmon Study PEIR: PD&E study will be conducted as a PEIR No state or federal funds Follow procedures and requirements set forth in FDOT PD&E manual

East Selmon PEIR Project Roles: Tampa Hillsborough Expressway Authority (THEA) – Owner/Developer/Operator HNTB – General Engineering Consultant for THEA Project Objective: Evaluate capacity improvements based on traffic needs, costs, impacts Additional lanes, barrier wall, inside paved shoulders, elevated lanes, additional lanes to inside and outside of existing lanes, dynamic toll pricing and other operational and safety concerns Coordination: THEA’s South Selmon Safety Project DB, FDOT, Hillsborough County, City of Tampa & CSX

Schedule Procurement: August, 2019 – December, 2019 PEIR: January, 2020 – December, 2021 Public Meetings: 2020 & 2021 East Selmon PEIR Project

Procurement Letter of Interest Short-list Presentations/Q&A by Short-listed firms

TRC Members and Technical Advisors Dave May, PE – THEA Bob Frey, AICP – THEA Christina Kopp, AICP – THEA Technical Advisors: Sue Chrzan – THEA Jim Drapp, PE – THEA GEC Al Stewart, PE – THEA GEC Laura Lockwood-Herrscher – THEA GEC Julian Gutierrez, PE– THEA GEC

Project Documents http://www.tampa-xway.com/procurement/# Once advertised, the cone of silence will be in place for all THEA, FDOT, HNTB, COT, Tierra and OMNI staff. All questions should be emailed to Man Le, THEA Contracts & Procurement Manager: man.le@tampa-xway.com Answers will be posted on the THEA website

Questions?