Transboundary Aquifer Management Obligations

Slides:



Advertisements
Similar presentations
GROUNDWATER MONITORING REQUIREMENTS. Comment on the differences between monitoring for surface and groundwater.
Advertisements

Research in support of groundwater conservation Kevin Pietersen Director, KSA: Water Resource Management.
Development of partnership on groundwater issues between the countries (EU and non) EU of the Mediterranean region Development of partnership on groundwater.
Evaluation plans for programming period in Poland Experience and new arrangements Ministry of Infrastructure and Development, Poland Athens,
An Integrated Water Resources Planning (IWRP) perspective Information needs for Water Resources Management to be addressed by WRIM Information Systems.
STRATEGIC PLAN & ANNUAL PERFORMANCE PLAN Templ ref: PPT-ISO-.001 Doc Ref no: STRAT-APP-PCWEA
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
STRATEGIES FOR MONITORING AND ASSESSMENT OF TRANSBOUNDARY RIVERS, LAKES AND GROUNDWATERS Sirkka Haunia Finnish Environment Institute (SYKE) Finland.
Neno Kukuric - IGRAC Almaty - July 2014 The framework, the content and the objectives.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Infusing policy change on transboundary groundwater management in Africa through partnerships, knowledge and tools Karen G. Villholth Presented by Simon.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
River Basin Management in Southern Africa Barbara Schreiner.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
The National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributary Rivers
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
(I)WRM indicators A GWP PERSPECTIVE Water Country Briefs Project Diagnostic Workshop, Geneva, December 2010 Mike Muller : GWP-TEC.
Groundwater at IW Science Conference, Bangkok, 2012 Panellist Input Eberhard Braune UNESCO Chair in Groundwater, University of the Western Cape.
Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on Water Statistics September 2012 Almaty, Kazakhstan The EU Water Framework.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Legal Framework for Transboundary Water Management Towards supranational mechanisms in addressing the challenges of water scarcity in WANA Raya Marina.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
Assessment of Transboundary Groundwaters in South Eastern Europe
Auditing Sustainable Development Goals
IIASA Governance Review
INTER-AMERICAN DEVELOPMENT BANK CAPACITY BUILDING AND TRAINING.
What does inclusive Integrated Water Resources Management look like?
Deputy Chairman of the CIS-Stat
Integrating data, modeling and tools into Basin Planning
The International Plant Protection Convention
Agenda item 5: Discussion of next steps
Sustainable Development Goals (SDGs) and implications for South Africa
Expert Group on the Birds and Habitats Directives (NADEG)
UNESCO-IHP Contribution to SDG 6 on Water and Sanitation
UN Support to SDG implementation in Seychelles.
MOSH Leading Practices Adoption System
Implementation of the UN DA 10 project “The African context”
SDG Global Indicator Framework
State of Water Information and Management Systems in Ontario
UIS Culture Statistics: Program of Work Meeting of the WG Culture Statistics  Eurostat, Luxembourg November 2016 José Pessoa Head of Culture Statistics,
Institutional Framework, Resources and Management
Overview of Bank Water Sector Activities
Evaluation plans for programming period in Poland
Introduction on the outline and objectives of the workshop
Monitoring Guidance Johannes Grath Rob Ward 12th October 2005.
Objective of the workshop
GROUNDWATER MONITORING FOR THE WFD UK approach
Water Directors’ Meeting Common Implementation Strategy
Unit 4 Fisheries Planning
International Groundwater Resources Assessment Centre (IGRAC)
Identifying Transboundary Aquifer hotspots in the SADC-region.
Implementing transboundary aquifer cooperation in Africa: Lessons learned from the Ramotswa and Stampriet Aquifers Jonathan Lautze, Piet Kenabatho, Thato.
GENERAL PRINCIPLES Equitable and Reasonable Utilization and Participation The parties shall participate in the use, development and protection of the River.
WG C Groundwater Progress Report to SCG SCG-Meeting, 07/
Project 2.7 Guidance on Monitoring
Technical Advisory Committee
Umweltbundesamt, Austria
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
The establishment of the Stampriet Transboundary Aquifer System (STAS)
REPORT ON NAMIBIA PROPOSAL FOR THE STRUCTURE OF THE
Testing of GW-quality data from subsequent surveillance monitoring for a significant increase Proposal developed by Umweltbundesamt and quo data (subcontractor)
Streamlining of monitoring and reporting under WFD, Nitrates Directive and EEA's SoE –concept paper DG Environment.
The Water Framework Directive: Challenges, Threats and Opportunities
Draft revision of ISPM 6: National surveillance systems ( )
Objective of the workshop
National Environmental Research Institute
Presentation transcript:

Transboundary Aquifer Management Obligations Critical Review of South Africa’s National Groundwater Monitoring network – Implications to Transboundary Aquifer Management Obligations *K F Netili , K Majola, S Mndaweni , K Pietersen , J Odiyo

Status quo groundwater monitoring in South Africa DWS has mandate to protect, use, develop, conserve, monitor, manage and control South Africa’s water resources in an integrated manner (NWA 1998;NWRS2) South Africa currently has 10 national water resources monitoring programmes managed by DWS and other institutions The national groundwater network (NGMP) provides baseline, status (up to near-real-time) and historical trend reporting of water resources in support of four key strategic monitoring objectives The NGMP covers almost 95% area of the country Monitoring Programme Purpose Measurement Manager Groundwater Quality Trend and spatial variation 412 (328) monitoring stations DWS Groundwater Quantity (Levels) Trend and status of aquifer 2233 (2076) monitoring stations Rainwater Quality (and depth) Rainfall depths, intensities and hydrogeochemistry characteristics at specific sites 100 stations

Distribution of Active GW Monitoring Network Active GW Level Stations in TBAs (116) Active GQ Level Stations in TBAs (46)

Redesign of the national groundwater monitoring network The current groundwater monitoring network coverage is skewed and inconsistent DWS embarked on reconfiguration of the network from 2014- 2017 First step - The spatial design of an “ideal” theoretical network (as if nothing existed) The recent review used spatial density criteria which allowed for the incorporation of best-practices; hydrogeological information and expert knowledge. The methodology comprised the following steps: Define monitoring objectives; Develop optimal positioning criteria; Decide on monitoring parameters and frequency.

Theoretical Monitoring Network Configuration Groundwater monitoring network design methodologies Statistical methods Detailed hydrogeological information Combination of both methods Hydrogeological approach Spatial density criteria based approach Incorporation of best-practices (International and national) Hydrogeological information Expert knowledge

SA TBAs Extent 9 TBAs Lithology: Coastal Sedimentary, Rhyolite_Breccia, Karoo and Dolomite Few active monitoring stations Few studied, less data available

South Africa’s TBAs

Rationale for extending monitoring network to TBA United Nations General Assembly unanimously, agreed to Transforming our world: the 2030 Agenda for Sustainable Development (the 2030 Agenda) in September 2015 SDG Target 6.5: By 2030, implement integrated water resources management at all levels, including through transboundary cooperation as appropriate. Indicator 6.5.2: Proportion of transboundary basin area with an operational arrangement for water cooperation Revised SADC Protocol on Shared Watercourses on 7 August 2000 Agreement for the Establishment of the River Basin Organisations (i.e. ORASECOM, LIMCOM,ETC). The spatial distribution of monitoring networks is not adequate in some cases such that the necessary portions of the TBA to be reported on are either not or partially covered. Currently, there are no cooperation agreements pertaining specifically to transboundary aquifers in the SADC region. To abide by groundwater data sharing and management protocols in reporting to the SDG requirements.

Principles for proposed network Evaluation of the status quo of groundwater provision and shortcomings in South Africa’s National Water Policy Theoretical monitoring network design explicitly considers the need for monitoring to support the management of transboundary obligations Recommendations made for the specialised monitoring programmes are integrated with the national implementation plan such that mandates do not overlap and roles and responsibilities are clear

Design criteria Existing groundwater monitoring activities evaluated against an independent theoretical network based on international accepted densities of groundwater monitoring networks. Data inventory – NGA,HYDSTRA,WMS Data integrity assessment (indicators: Equipment, Data records, Analysis & Audit, Frequency, Data record length, etc) Site positions were determined using the integrated site positioning criteria and available national spatial data as outlined below: The localities for transboundary aquifers. Spatial data sets (Vegter regions, GRAII,Landcover,etc)

Distribution of Active GW Monitoring Network in TBAs

Features of the current groundwater monitoring network in selected TBAs – Khakhea/Bray Dolomite Aquifers Groundwater Monitoring Quality (1) Levels (22) Challenges Actual abstraction volumes (metering) Integrated/Tra nsboundary water level monitoring (both Botswana & RSA) Rainfall monitoring (limited) Distribution of GW Level Monitoring Stations

Features of the current groundwater monitoring network in selected TBAs – Stampriet Aquifer System Distribution of GW Level Monitoring Stations Distribution of GW Quality Monitoring Stations Groundwater Monitoring Quality (2) Levels (1) Challenges Actual abstraction volumes (metering needed) Integrated/Transb oundary water level monitoring (Botswana, Namibia & RSA) Rainfall monitoring (very limited) Still little or no time series data on relevant variables Data limited and unequally spread over the area In order to support informed decision-making for managing STAS groundwater resource, first priority is establishing and operating aquifer-wide monitoring networks (UNESCO-IHP, 2016) There are very few groundwater quality data points in the southern parts, and no information at all in case of the Nossob (deep Karoo) aquifer

Theoretical Baseline Sites

Conclusion TBA spatial design workshop Water quantity and quality – network description constituents and frequencies Site visits, ground explorations, surveys and various other investigations to confirm the locations of all proposed monitoring sites Capital and O&M costs must be determined Highly productive sources (high rainfall areas, high-yielding aquifer systems, high recharge systems, etc.) should be prioritised Protocols for the identification of new sites must be developed to ensure proper integration into the existing monitoring network

Thank You