Development of Entry Capacity Substitution

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
A regulatory framework for gas quality treatment facilities: recap and update.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Ofgem Open Letter – Next Steps Transmission Workstream
Review Group 221: Option 3 – security provided after allocation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Capacity trade and transfer mechanism and the next AMSEC auction Bob Hull Director, Transmission 9 May 2007.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Aligning the connections and capacity processes 1 Mike Wassell Transmission workstream, January 2012.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Planning Code – Draft Document
Review Group 291- Ofgem Update
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Planning Code
SO Incentives from April 2010
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
NTS Entry Charging Review Update
Capacity Methodology Statements
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Update on Exit Capacity Substitution and Revision
QSEC auction timetable
Entry Capacity Substitution
Review Group 291- Ofgem Update
UNC Transmission Workstream 7th December 2006
The Treatment of “Spare / Sterilised” Capacity
Entry Capacity Transfer and Trade
Entry Overrun Calculation
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Ofgem presentation to Gas Transmission Workstream
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Transmission Workstream 1st February 2007
Review Group 221: Review of Questions from Session 2
Commercial Arrangements For Gas Quality Service – Introduction
Presentation transcript:

Development of Entry Capacity Substitution Bogdan Kowalewicz Transmission Workstream meeting 6 November 2008

Introduction Entry Capacity Substitution obligation obligation introduced as part of TPCR4 fully committed to principle it helps ensure that the size of the system is appropriate to the demands placed on it consumers benefit from appropriate system capacity

Background Changing patterns of supply Declining UKCS production Level of unsold baseline capacity User commitment Responsiveness to signals for incremental capacity Efficient and economic operation of the network

Policy objectives Maximise use of existing Transmission network assets for the benefit of consumers Intention is to avoid both capacity sterilisation and unnecessary infrastructure investment while accommodating changing flow patterns NGG to make informed judgement on how unsold capacity can be put to use in other areas of the network that are signalling investment requirements

Entry capacity substitution aims Ensure substitution minimises costs associated with funded incremental obligated entry capacity Avoids material increases in costs reasonably expected to be incurred by NGG as a result of substitution Facilitate effective competition between shippers and suppliers

Review of Progress Current Position NGG Informal Consultation in August 2008 on methodology following series of workshops over the summer NGG Conclusions Report published September 2008 Ofgem open letter on substitution published in September 2008, prior to QSEC auction

Outcome of informal NGG consultation Most respondents expressed support for the principle of entry capacity substitution; No clear consensus on preferred methodology Concern that application of substitution could have undesirable consequences Need to reconcile NGG’s aims of minimising the costs of funded incremental obligated entry capacity with wider obligations to operate in an efficient and economic manner.

Ofgem’s view Responsive to the concerns expressed Understand the need to remove some of the uncertainty Supportive of the need to explore whether an economic test should be applied Recognise the need for a simple methodology that can be applied in a transparent manner with little scope for challenge or dispute Committed to the principle of user commitment to signal future capacity requirements

Reasons to further develop methodology NGG analysis suggests that, at this time, the timing of the introduction of substitution may have limited impact Allowing time to further develop the methodology will allow a more comprehensive and flexible solution greater consensus reinforce user commitment greater transparency about the risks and effects of substitution

Next steps Further develop the current proposal to take into account the concerns expressed NGG to clarify the risks of substitution (particularly the impact on entry prices) NGG to clarify the costs of restoring baseline capacity where it has been substituted away (including impact on lead times and potential for their reduction)