CMS ventilation system

Slides:



Advertisements
Similar presentations
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Advertisements

Objectives u Provide Knowledge and Understanding of Physical and Chemical Properties u Provide Knowledge and Understanding of Health Effects u First Aid.
FLUID BED GRANULATION SWITCH CABINET MANUFACTURER : GLATT AG
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
Purpose of Carburetion
Singapore Polytechnic Singapore Maritime Academy & Maritime Institute Of William Barentsz Bachelor Degree in Maritime Operations (BMO) Diesel Technology.
Hosted By Prissy & Stephy Multiplying exponents Negative exponents Dividing exponent percents
Year 6 mental test 5 second questions
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire? Decimal Edition Question 1.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
1 Copyright Copyright 2012.
World Health Organization
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
3G Monitor. 3G Camera Contents 3G camera Function Features 3G Camera's Application Scenes 3G camera's business mode 3G Camera Technical parameters.
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Secrets of smoke extraction and HPWM in the new deep garage beside Hungarian Parliament Paris Compiled by: Márton Horváth Technical director.
TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Fire Detection and Fire Fighting in ALICE Smoke detection in UX cavern and Counting Rooms in PX Alarms sent to.
Let’s watch a DVD… DVD Instructor Notes
1 BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE.
INTERTANKO,ATHENS 13th April
Demand and Supply: TV Set (Australia)
LED light fixtures Warehouse, Commercial, Industrial, Freezer and Cooler applications Before After.
Ideal Gas Law PV=nRT.
Ottawa Microturbine Application Workshop jan Return of Experience for Microturbines Running on Landfill Gas // waste water gas in Europe
$ TOTAL INCOME 100 Quick Start 4 Within 30 Days of Start Date.
WELCOME to JBT Food Tech presentation Food Town Concept Bulgaria
Part of Wilhelmsen Maritime Services a Wilh. Wilhelmsen group company OFFSHORE AND ENERGY Your preferred Offshore and Energy Partner CAPABILITY PRESENTATION.
End Simplify A. 13B. 147 C. 17D – 2(5)+7.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Partial Products. Category 1 1 x 3-digit problems.
Zone Control Air System Why? 1.Provides room by room comfort control. 2.Reduces equipment run time. 3.Eliminates hot/cold rooms. 4.Works with conventional.
André Augustinus 16 June 2003 DCS Workshop Safety.
The LHC HVAC system Contents: -Layout and history of existing LHC HVAC system -Referential for improvement of existing system -Possible improvements -Conclusions.
Environmental Conditions in the LHC Experimental Caverns JCOV Thursday 18 th March.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Associated detection/extinction systems D. Swoboda.
EN-CV interventions during YETS
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
André Augustinus 9 October 2006 Interlocks update.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.
Bernard Boutherin 1 Feedback after four years of operation.
Building The topic ‘Building’ can be divided into three parts: Passive fire protection Fire protection that is built-in in the building (for example fire.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Update on the PSB Cooling and Ventilation Systems
TS2 preparatory meeting
News from Integration WG
CV maintenance works during YETS
ATLAS Thermosiphon Electrical Distribution and Run Modes
Cryo stop of P8 on 1st of November
Presentation transcript:

CMS ventilation system Air handling units Principle LHC status UX ventilation modes USC ventilation principle Fire detection and smoke extraction Pressurization safe areas Gas extraction Other buildings Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA Air handling units SUX 50 units installed SH Bernard Pirollet TS-CV-EPA USC

Bernard Pirollet TS-CV-EPA Air supplied & air extracted Quality Pressurization Temperature Dew point Smoke and gas extraction Principle BRR/T D M N S L - E V P BA6 BAY BFY BTO BT2 BLP MRM BLO MRE BTT BTB BTA + PRB 180 210 M L BAY BA6 BLO MRE Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA Principle LHC status Cap open / Cap closed LHC run / Shut down Purge Emergency Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA UX ventilation modes Supply Extraction (m3/h) Gas Cap open Shut down 22 500 30 000 (SX) 0 Cap closed Shut down 22 500 22 500 5 000 Cap closed LHC run 22 500 22 500 (recycling) 5 000 Purge (fresh air) 22 500 22 500 (RP control) 5 000 Emergency Cap closed 90 000 90 000 5 000 Emergency Cap open 90 000 90 000 (SX) 0 Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA USC ventilation principle Supply Extraction (m3/h) Gas Service area 20 000 20 000 5000 Post treatment 40 000 Racks areas 20 000 20 000 5000 Post treatment 13 000/ 26 000 Bernard Pirollet TS-CV-EPA

All the air handling units of the concerned area are Cold smoke extraction Actions Detection Fire men All the air handling units of the concerned area are automatically stopped (Ts/cv) Smoke extraction mode activated by fire men (fire men cubicle) During extraction mode extraction filters will be by-passed End of fire men action No action with RP Air handling units in normal mode restarted by TS-CV Material design 400°C/2h Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA “Fire cubicle” Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA Pressurization areas 3 separate & independent areas: Experimental caverns (-) (UX pts 1/2/8 & UXC55 pt5) Protected areas- technical caverns (+) (USA 15 pt1,UX 85 pt8 & USC55 pt5) Safe area (++) (PM/PZ) M M M D S L N E L E V M M M D S L N E L E V M M M D S L N E L E V (-) UXC55 Differential pressure (+) PX56 (+ +) Services Racks Bernard Pirollet TS-CV-EPA PM54 USC55

Bernard Pirollet TS-CV-EPA Pressurization safe areas Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA Gas extraction UX USC55 PX56 PM54 UXC55 Cryogénie Racks SUPERVISEUR : J.ROCHE INDICE CERN ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH C.MARTEL 22/02/2000 UAEW-519/520-SX5-UXC55 Extraction mélange gazeux / Mixing gas extraction Schéma de principe - Principle schematic LHCU.3599.1011.4 Extraction gaz Argon Argon gas Extraction M BLO MRE SX5 - 3585 - Espace confié / Confined room 5 000 m3/h A 5 000 m3/h BLO BLO standby BLO MRE BAY BAY BAY MRE MRE BA6 M BAY M M A M M L L L V BD1 5 000 m3/h BT5 UAEW-519-SX5-UXC55 BLO BAY BLO BLO MRE BAY BAY MRE MRE BA6 M BAY M M M L L L V UAEW-520-SX5-UXC55 UIAE UIAN Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA Gas extraction USC Bernard Pirollet TS-CV-EPA

Bernard Pirollet TS-CV-EPA