1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL.

Slides:



Advertisements
Similar presentations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Advertisements

Multiplying Powers Dividing Powers Zero ExponentsNegative.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Low Alpha & CSR in the MLS (PTB) G. Wüstefeld (BESSY) et al, ESLS XVI, Daresbury, Nov 28th Low Alpha Optics and Coherent Synchrotron Radiation.
1 Diamond RAL Particle Physics Masterclass 12 March 2003 Glenn Patrick
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Start Up with Electrons Preliminary Schedule. Tasks Polarity Check Transfer Line Store Beam BBA ORM Feedbacks Aperture, Acceptance Filling Schemes and.
Tango Meeting DESY Status Report Thorsten Kracht Grenoble, 13. May 2009.
Richmond House, Liverpool (1) 26 th January 2004.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
VOORBLAD.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
LC-ABD2 Work Package 2: Damping Rings Andy Wolski University of Liverpool and the Cockcroft Institute 12 April 2007.
Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
Slide: 1 Welcome to the Non Linear Beam Dynamics Workshop P. Elleaume Non Linear Beam Dynamics Workshop, ESRF May 2008.
Stability studies at SOLEIL Nicolas HUBERT # on behalf of the stability group: N. Hubert, L. Cassinari, J-C. Denard, L. Nadolski, M-A. Tordeux #
Addition 1’s to 20.
Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Equal or Not. Equal or Not
Slippery Slope
FEL and linac plans at MAX IV laboratory
Plasma Wakefield Acceleration at CLARA G. Xia Cockcroft Institute University of Manchester 113/01/2014IoP CLARA Community Meeting.
DEELS workshop, ESRF, 12.– 13. May 2014 Friederike Ewald Difficulties to measure the absolute electron beam energy using spin depolarisation at the ESRF.
EUROFEL DS3-DS4 TASK meeting CEA - Saclay, MAY 2005 M. Ferianis EUROFEL DS3-DS4 TASK meeting Proposed synchronization schemes for 4GLS: impact on.
Lecture 4. High-gain FELs X-Ray Free Electron Lasers Igor Zagorodnov Deutsches Elektronen Synchrotron TU Darmstadt, Fachbereich May 2014.
A SMALL TRUTH TO MAKE LIFE 100%
X-ray Free Electron lasers Zhirong Huang. Lecture Outline XFEL basics XFEL basics XFEL projects and R&D areas XFEL projects and R&D areas Questions and.
Weekly Attendance by Class w/e 6 th September 2013.
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
J. Feikes, HZB (Berlin, Germany) The Metrology Light Source, ESLS XXII,Grenoble, France November 2014 The Metrology Light Source - Status Jörg Feikes,
SPEAR3 short pulse development J. Safranek for the SSRL accelerator physics group* Outline: Timing mode fill patterns Short bunches –Low alpha Bunch length.
R. Nagaoka, A. Nadji, M.E. Couprie, O. Marcouillé
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Status of the Diamond Light Source R. Bartolini Diamond Light Source Ltd and John Adams Institute, University of Oxford ILCW CERN, Geneva, 20 th October.
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
ESRF interest & commitment to (ultra-) fast science with X-rays Kees Scheidt Diagnostics group, Machine division.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
1 R. Müller, HZB, Automation Dec , Lund Automation at light sources: BESSY II, MLS examples General Automation Tasks Baseline operational states.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
PETRA III, A New High Brilliant Light Source At DESY
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Machine Operation and Studies at SSRF Wenzhi ZHANG Dec. 16, 2013 Spain.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
SLS-2/Cosami meeting Mar. 16, 2016
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
Light Source Upgrade Projects R. Bartolini Diamond Light Source and John Adams Institute, University of Oxford 3 rd EUCARD2 Annual Meeting Malta, 26 April.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Performances of the French synchrotron light source SOLEIL Actions to enhance the reliability of the equipment J.F. Lamarre*, E. Patry X. Delétoille, A.
PETRA III, Status and Upgrade
SOLEIL synchronization system
Diamond Light Source Status and Future Challanges
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Session 5: Instability Modeling, Observations and Cures
The TWIICE workshop Benoit for the ABP participants (Andrea, Gianni, Giovanni, Hannes, Lotta, Stefania, Yannis) ABP information meeting March 31st 2016.
SOLEIL Operation and Adaptation to the New Common Metrics
Coupling Correction at the Australian Synchrotron
Machine Operation and Progresses in SSRF
LHC (SSC) Byung Yunn CASA.
Operation Progress and Upgrade in SSRF
An Overview of Collective Effects in 3rd Generation Light Sources
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Presentation transcript:

1 Amor Nadji January , SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

OPERATION in 2013 ROCK 98% Photon Beam availability in 2013 : 98% new beamlines (total of 29) 68 h MTBF : ~68 h 1h23 MTTR : 1h23 January , SOLEIL, TWIICE

5 Modes of Operation for the Users Mode of operationUser Operation in 2013 Ultimate performance achieved Multibunch 430 mA 500 mA Hybrid 425 mA + 5 mA 425 mA + 10 mA 8 bunch 88 mA 110 mA 1 bunch 15 mA 20 mA Low : bunch length and current 4.7 ps RMS and 65 A per bunch < 8 ps FWHM and 10 A per bunch All in Top-up injection 3 5 feedbacks simultaneously in operation: TFB, SOFB, FOFB, BTUNE-FB, Coupling-FB January , SOLEIL, TWIICE 2014

26 Very Diverse Insertion Devices are installed HU65 HU256 W installés 1 à venir U18 4 EM Mixte HU640 Légende U20 HU60 HU80HU44 HU60 U20 HU36 HU52 HU80 U20 PM WSV50 U18 U24 HU80HU44 HU52 HU64HU42 January , SOLEIL, TWIICE 2014

FEMTOSLICING UNDER COMMISSIONING Laser hutch January , SOLEIL, TWIICE – 200 fs FWHM100 – 200 fs FWHM Soft X (Tempo) andSoft X (Tempo) and Hard X-ray (Cristal) Hard X-ray (Cristal) Commissioning withCommissioning with beam will start by beam will start by January 24th. January 24th. Laser at the modulator location

6 In future ring-based light sources (DLSR), the combination of ultra low emittance, high current and narrow chambers will mean that collective effects will be important! January , SOLEIL, TWIICE 2014 Collective effects phenomena occurring in synchrotron radiation sources include: Beam instabilities Lifetime-limiting effects Ion effects Strongly influence the quality of synchrotron radiation delivered to the users. In view of the high costs in constructing a synchrotron radiation facility, a reduction of the beam quality due to collective effects is not acceptable. Countermeasures have to be considered at an early stage of the machine design.