Modeling Subcommittee (MS) Updates

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
MWG Webinar January 25, 2016 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
Technical Advisory Subcommittee Quarterly Meeting August 15-16, 2016
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Western Electricity Coordinating Council
Studies Work Group Update
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
GENESYS Redevelopment Strawman Proposal
Hydro Modeling Improvement for TAS Approval May 4, 2017
TEPPC Review Task Force Meeting February 4-5, 2016
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Unscheduled Flow Administrative Subcommittee Report
Reliability Assessment Committee Proposal TSS Meeting
Updates to the Path Rating Process for Approval by the PCC
Grid Integration of Intermittent Resources
Recommended Hydro Improvement April 11, 2017
Kenneth Silver Los Angeles Department of Water & Power
Planning Tools Overview
Solar Eclipse Overview August 2017
Module 4 Smart Grid Implementation Issues
Scenario Scoping Process
Reliability Assessment Committee Reliability Workshop Priorities
ColumbiaGrid Planning Meeting WECC Update February 9, 2017
Mid-Continent Area Power Pool
Jonathan young ColumbiaGrid
Tyler Butikofer Associate Engineer II
WECC Short Circuit Analysis
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Jonathan Young, SDWG Chair
Western Electricity Coordinating Council
ADS and WPR Seed Case Background
Andrew Christensen, SDWG Chair
Transforming Scenario Narratives into Study Cases
PCM (Production Cost Model) Data Work Group Webinar
Byron Woertz, Manager—System Adequacy Planning
WECC Short Circuit Analysis
Hydro Modeling Improvement for TAS Approval May 4, 2017
Jonathan Young SDWG Chair
Reliability Assessment Committee Reliability Workshop Priorities
Scenario Scoping Process
Planning Tools Overview
Recommended Hydro Improvement April 11, 2017
Byron Woertz, Manager—System Adequacy Planning
Shelli Nyland Supervisor, Administrative Services and Support
SRWG Chair Report March 2015 WECC HQ
Forecasting and Operations CAISO Case
Tyler Butikofer Associate Engineer II
PCM (Production Cost Model) Data Work Group Webinar
ADS and WPR Seed Case Background
Kenneth Silver Los Angeles Department of Water & Power
Variable Generation Subcommittee Update to PCC
Jonathan Young, SDWG Chair
Proposed Quorum Language
PDWG Validation of the 2028 ADS PCM V1.0
Managing Data Corrections Between SDWG & PDWG
Data Subcommittee Production Cost Model Data Work Group (PDWG) Update
Tyler Butikofer Tom Carr
Presentation transcript:

Modeling Subcommittee (MS) Updates Jamie Austin DS Liaison Western Electricity Coordinating Council

Topic Common to RAC Committees Protocols for rotating Governing Body Members JGC Update Edits to proposed quorum language Western Electricity Coordinating Council

Multiple Power Flow Solutions in WECC Cases—Sina Baghsorkhi Part two presentation, first was presented last November. The work is not final yet; more testing is needed before making a final recommendation. Is the solution to power flow unique? Can we make distinctions between or characterize these solutions? When solution corresponds to the true operating point of the system? Purpose: looking for multi solutions to facilitate Load Serving capability under the most severe conditions Western Electricity Coordinating Council

MVWG Update - Update Song Wang, PacifiCorp Load Composite Model – Model structure is implemented, tested and benchmarked and is in the WECC base case Renewable Energy Modeling Model is implemented, tested and benchmarked in four software platforms Composite Load Model + DER_A Model Testing and Benchmarking is underway Western Electricity Coordinating Council

Western Electricity Coordinating Council Modeling Overview Generation Energy System modeling Overview The renewable energy generator – converter models The renewable energy electrical –control models The renewable energy plant – controller models The mechanical and aero-dynamic models associated with wind turbine generators Mechanical and Auxiliary Models Shared Priority list of 2019 scheduled work Western Electricity Coordinating Council

Western Electricity Coordinating Council SCMWG Update Amos Ang SCMWG reviewed action items from past meetings Round trip conversion of ASPEN-CAPE-ASPEN by Salt River Project The comparison between cases shows significant errors for single line-to-ground faults The conversion between ASPEN still shows problems SCMWG also discussed the future of the work group Considering building WECC-level cases with all networked system included, regardless of voltage level Presented on the Network Sequence Data Common format approach Western Electricity Coordinating Council

PMWG Update Yi Zhang, CAISO PMWG Activities in 2018 Implemented hydro modeling enhancement Reviewed key PCM data structures and functions Work Plan for 2019 Continue to review PCM data structure and modeling needs Production Cost Simulation Engine, Hydro Model, Energy Storage Model, Market Models, etc. PCM Modeling Handbook Western Electricity Coordinating Council

Enhanced Modeling of Demand Resources (DR) in PCM Andy Satchwell, LBNL Two types of DR modeling assumptions are needed: DR Resource Quantities: how much DR is available to be dispatched in any given hour for each load Zone? DR dispatch mechanics: when is the DR dispatched and how does it affect hourly loads and peak demand? DR resource quantities are based on non-firm load forecasts reported by Balancing Authorities to WECC. The goal is: to realistically model DR resources within the constraints of WECC’s production cost model. ito ultimately model DR endogenous to the PCM model. Western Electricity Coordinating Council

SCIT Presentation Yi Zhang & H. McIntosh SCIT stands for Southern California Imports The nomogram was created after 2-significal blackouts on the Western Interconnect in the early 1980. MS has an Action Item covering Nomograms in general, looking for its enhanced modeling in PCM. Concluded at the StS meeting on Monday was for StS to work jointly with SDWG on develop a recommendation for what should be modeled. Western Electricity Coordinating Council

Western Electricity Coordinating Council Contact Information Jamie Austin Jamie.Austin@pacificorp.com Western Electricity Coordinating Council