Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
UNC Modification Proposal Daily Metered Elective Action 005: User Pays Proposal Simon Trivella – 4 th November 2008 Development Work Group 0224.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
FGO: ASA Service Line Review
Supply Point Enquiry Service
Consideration of issues raised by UNC Modification Proposal 0244
Review of Demand Estimation Times for Modification Proposal 461
Modifications iGT 039 and GT 0440 re iGT Agency Services background
PN UNC Workgroup Invoicing 4th October 2011.
iGT Agency Services Background
Assignment Workshop 2 16th September 09, Solihull.
Project Nexus Workgroup
Project Nexus Workgroup
CSEPs Reconciliation Proposals
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
UNC 0621L: Amendments to Gas Transmission Charging Regime
MOD 258A Demand Estimation Sample Point – Shipper Report.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Topic raised at July 2009 Distribution Workstream
Mod 124 Steve Nunnington.
Project Nexus Workgroup
PN UNC Workgroup iGT Services
June 2019 Release Scope DSC Change Management Committee
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
PN UNC Workgroup Settlement Overview
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
UNC 0621L: Amendments to Gas Transmission Charging Regime
PN UNC Workgroup (Settlement topic)
Modification proposal 330
Options for the Development of a Demand Side Response Mechanism
UK Link Replacement Programme additional supporting UNC modifications
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Project Nexus Workgroup
MOD 640 INVOICING VALIDATION RULES
UNC Modification 0634 (Urgent) – Post Implementation Assessment
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
Assignment of NTS Entry Capacity – Work currently being Undertaken
Project Nexus Workgroup
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Modification 440 Project Nexus iGT Single Service Provision
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
Transmission Workstream 05 November 2009
Mod 0489 EU Balancing Code - Information Provision changes required to align the UNC with the EU Code Debbie Brace 25th April 2014.
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved.

UNC Modification Proposal 0248 Meter Reading Replacement - Review CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved.

Background Raised 03 April 2009 Main aims: Create a simple process to allow the replacement of meter readings when a subsequent reading has been submitted Low cost interim solution until full systematised solution developed through Nexus Enable reduced AQ amendments for Shippers and Transporters Improved data quality Work with xoserve to identify aims and solution Withdrawn 19 April 2010 as no ROM & DCA £40,000 - £80,000 Rough estimate of £400,000 to £1.5m to implement CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved.

Our Experience of 0248 What went badly Supposed to be simple Costs Expectations not managed at the beginning Issues producing demand forecasts Need to engage technical experts Time What went well Customer engagement (eventually) Some costs (eventually) CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved.

CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved.