Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.

Slides:



Advertisements
Similar presentations
Conclusion Kenneth Moreland Sandia National Laboratories Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company,
Advertisements

1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
MVWG Report to TSS January 2013
Western Electricity Coordinating Council Market Issues Subcommittee Report to the Market Interface Committee Philip Tice October 30-31, 2008.
Photos placed in horizontal position with even amount of white space between photos and header Sandia National Laboratories is a multi-program laboratory.
WECC Operating Committee Operations Training Subcommittee Report Bill Simmons, OTS Chair March 25, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Siemens Power Technologies International
SRWG Chair Report March 2015 WECC HQ
Jun Wen, MVWG Chair Southern California Edison
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Transition Plan for Removing Wind Phase 1 Generic Models
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
User Experience with New Solar PV Models California ISO
SAND Number: P Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department.
MVWG Report to TSS May 2014 Stephanie Lu, MVWG Chair Seattle City Light.
WECC Renewable Energy Modeling Workshop Conducted by the WECC Renewable Energy Modeling Task Force (REMTF) and Modeling and Validation Work Group (MVWG)
MVWG Report to TSS February 2015 Stephanie Lu, MVWG Chair Seattle City Light.
Wind / PV / Diesel in Off-grid: Lessons learned Best Practices
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye University of Illinois at Urbana-Champaign 1 Lecture 23: Renewable.
SRWG Meeting 15-2 Power Plant Validation Tools Eric Bakie July 2015.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Jun Wen, MVWG Chair Southern California Edison
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
MVWG Report to TSS May 2016 Jun Wen, MVWG Chair Southern California Edison.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
WECC REMTF Workshop Spencer Tacke WECC Renewable Energy System Models Workshop March 9, 2016.
Modeling DER in Transmission Planning CAISO Experience
Western Electricity Coordinating Council
Song Wang, MVWG Chair PacifiCorp
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Philip Augustin TSS Chair
Reliability Assessment Committee
SANDIA NATIONAL LABORATORIES
Transition Plan for Removing Wind Phase 1 Generic Models
Reliability Assessment Committee Reliability Workshop Priorities
Results of Eddy Current Analysis
Hawaii Energy Storage Seminar: Other Energy Storage Technologies
WECC REMTF Workshop Spencer Tacke
CMPLDWG Composite Model with Distributed Generation Approval
NERC-WECC Coordination
Jonathan young ColumbiaGrid
Andrew Christensen, SDWG Chair
NERC-WECC Coordination
Composite Load Model with Distributed Generation (CMPLDWG)
MODELING DG IN BASE CASES
System Review Work Group
Siemens Power Technologies International
Reliability Assessment Committee Reliability Workshop Priorities
Modeling Subcommittee (MS) Updates
MODELING DG IN BASE CASES
CMPLDWG Composite Model with Distributed Generation Approval
SRWG Chair Report March 2015 WECC HQ
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT
Donald Davies Chief Senior Engineer
User Experience with New Solar PV Models California ISO
Tracy Rolstad TSS Chair
Transition Plan for Removing Wind Phase 1 Generic Models
Model Validation for Large Scale PV Plants
WECC REMTF Workshop Spencer Tacke
SRWG Meeting 15-2 Power Plant Validation Tools
Variable Generation Subcommittee Update to PCC
Andrew Christensen, SRWG Chair
WECC REMTF Workshop Spencer Tacke
Presentation transcript:

Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake City, UT Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear Security Administration under contract DE-AC04-94AL85000.

WECC REMTF Generic Models Approved (new), under development Inverter-based (PV, WT3/4 plants, storage) “Phase II” WT1/2 wind plants Module Use WTxG Generator WTxT Turbine WTxP/A Pitch control/aero WT2E Rotor resistance Module Use REPC_A Plant controller REPC_B Enhanced plant controller REEC_A Electrical controls (Wind) REEC_B Electrical controls (PV) REEC_C Energy storage REGC_A Generator/Converter WTGT_A Drive Train WTGAR_A Aerodynamics WTGPT_A Pitch Control WTGTQ_A Torque Control Distributed PV Module Use PVD1 Discrete DG PVD2 Enhanced discrete DG CMPLDWG Distributed generation All dynamic models except for CMPLDWG require explicitly generator representation in power flow

Generic Energy Storage Model

REEC_C: Energy Storage Module Status: Specifications Testing Implementation MVWG technical spec approval Add to WECC AML

CMPLDWG: Distributed Generation REMTF Recommendation/Request Add hooks to allow different DG models (like PVDX) to be used with CMPLDWG

Update PVDX Model? Items REMTF will consider: CA SIWG and CA Rule 21 Phase 1 Phase 2 Phase 3 Items REMTF will consider: Additional active power controls Add time dimension to trip functions Auxiliary input for other functionality Would become PVD2

Wind/PV Plant Control Model

REPC_B: Enhanced Plant Controller Adds new features Interface with multiple WTGs Interface with reactive support devices (MSC, SVC, synchronous condensers) Plant level power factor control option Expect approval item in June meeting

PV/Wind Model Updates Good models, but the existing MDF is deficient Many Wind/PV plants modeled as synchronous generators or load-netted Example from 2022LSP High Renewables Case used in WWSIS III study: 18GW modeled, 4.5 GW modeled as genrou or motor1, 2.5 GW load-netted Most of the PV/wind (Type 3/4) plants in the MDF are modeled as WTXX (models being phased out) or GEXX (not an approved model) Almost none of the wind/PV data in the MDB has been validated, some considered suspect How can the current situation improve? Information (validation guidelines, workshops, etc.) Compliance enforcement with reasonable transition plan Have patience

Wind Model Validation at BPA BPA effort had mixed results Technical assistance needed Previous work by an REMTF member on similar BPA data produced better results

Model Validation Support PV Plant Model Validation Guide under development Document in late draft. Step-by-step procedure, example Expect approval item in June meeting Wind Plant Model Validation Guide is next REMTF organizing a model validation webinar (June? Coordinate with SRWG workshop this summer?) What else can REMTF/MVWG do? Map 1st Gen into 2nd Gen?

REMTF Documentation Technical specs, Application guides, Validation guides Issue: updated documentation hard to find Best way to handle would be a WECC.biz public folder Recent IEEE papers (2015 PES GM)

WECC Plan to Transition to New REXX Models Eric Bakie’s Report (separate presentation) WECC model transition is underway, but it will not be completed by June 2015, as planned last year. What else can be done? Move milepost and increase pressure? WECC to migrate 1st Gen to 2nd Gen models without changing the ? Intermediate step until model validation requirement catches up REMTF/MVWG could come up with parameter lookup tables; software developers could automate May not create data ownership if done right (preserve response) There may be other prickly issues – need to look into it carefully!!!

Limitation of Generic Models Exploring numerical stability of positive-sequence simulation programs with respect to very high penetration scenarios and low SCR On-going research project at Sandia REMTF white paper on RE model limitations