RSA 2019 Interop Demonstration Event Tony Cox Feb 2019
Rationale Requirement to show testing value Commitment to members Participants Industry expectations Spec & Profile development Commitment to members
What actually happened… Interop go ahead given with less than 95 days to go before RSA Interop opens 1 week connectivity Test 2 weeks interop testing Results review was quick and very collegial/cooperative Results collation and review was relatively straight forward Good results for the group overall
Testing Process 7 Clients 6 Servers ~56,000 successful test runs Same point to point testing setup as in previous years Limited (small) number of tests needed a subjective adjustment through analysis Specific Connectivity Test period test eliminated some delays we’ve seen in the past
KMIP TC Interop Results Feb 2019 Tony Cox Graphs based on verified results from the OASIS KMIP RSA2019 Interoperability Demonstration Testing
KMIP Interop Test Results Feb 2019 Client Tests by Encoding
KMIP Interop Test Results Feb 2019 Server Tests by Encoding
KMIP Interop Test Results Feb 2019 Client Tests by Test Case Type
KMIP Interop Test Results Feb 2019 Server Tests by Test Case Type
KMIP Interop Test Results Feb 2019 Client Profile Conformance by Encoding
KMIP Interop Test Results Feb 2019 Server Profile Conformance by Encoding
KMIP Interop Test Results Feb 2019 Client Profile Conformance By Profile
KMIP Interop Test Results Feb 2019 Server Profile Conformance by Profile
KMIP Interop Test Progression 2013-2019
Other Graphs Graphs based on verified results from the OASIS KMIP RSA2019 Interoperability Demonstration Testing
KMIP Interop Test Results Feb 2019 Testing by Vendor (excl vendor-vendor)
KMIP Interop Test Results Feb 2019 Testing by Vendor (inc vendor-vendor)
KMIP Interop Test Progression 2013-2019 Testing by Vendor
KMIP Interop Test Progression 2013-2019 Testing by Vendor (Inc vendor amalgamation)