A. Freyberg Aug 2016 ECT’16 =>

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
The present CEBAF Wien Spin Manipulator: Designed for 100kV beam and max rotation +/- 110 degrees Adaptation of SLAC design (how different?) X turn coil.
CEBAF Polarized Electron Source: Outlook & Horizon Operations Group Meeting May 13 th & 20 th, 2009 Joe Grames M. Poelker, P. Adderley, J. Clark, J. Grames,
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
12 GeV CEBAF INJECTOR Reza Kazimi Users Group Annual Meeting June 4, 2012.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Update Puck and Gun Magnet February 16, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Eliminating one constraint for the scheduling committee Jay Benesch
Report Technical Director Storage-Ring-Installation Completed
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
Status of HESR 18th March Gießen Dieter Prasuhn.
Bubble Chamber Schedule – 2017
SUMMER 2017 SUMMER 2018 >= SUMMER 2019
Joe Grames Center for Injectors and Sources
UITF – Upgrade Injector Test Facility
CEBAF Injector Update PREX/CREX March 3-4, 2017
Overview of LERF Status, Plans and Goals
Why are we removing our very good gun?
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
Junji Urakawa (KEK) for ATF International Collaboration
CEBAF Injector Overview
Tunnel Penetration Tunnel Floor Gun Little Oil Tank ISB Rack
Upgraded Injector Test Facility
keV region overview Polarized Source Inverted Gun with 450 kV HVPS
Electron Source Configuration
Summer ‘09 SAD Same good photocathode PREP and LOAD chambers
Pulsed Ion Linac for EIC
Center for Injectors and Sources
Upgraded Injector Test Facility
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
Test of Booster at UITF Reza Kazimi (12/12/18)
Polarized Source: Recent Activities
Feb CIS meeting Marcy Stutzman.
Electron Gun UP (EGUP) Plan
Upgraded Injector Test Facility
Electron Collider Ring Magnets Preliminary Summary
Injector Physics C.Limborg-Deprey Feb.8th 2006
IR Beam Transport Status
Andrew Hutton Concept suggested independently by Haipeng Wang
Presentation transcript:

A. Freyberg Aug 2016 ECT’16 =>

Injector Upgrade Project (past R100) 200 kV Must Increase gun voltage and Wien filters for 200kV operation Beam line must be compatible for 200kV (PSS kicker, chopper RF) Locate Wien (energy) filters upstream of pre-buncher cavity avert New SRF booster eliminates capture, RF kick & x/y coupling Other RSR groups are planning system upgrades, needs to be integrated Should NEG coat beam line to limit outgassing, SEY, add a little pumping Upgrade keV quads to manage Wien and dipole focusing Upgrade keV solenoids to address focusing gradient across chopper and beam size Complete diagnostics to setup beam Augment or reconfigure 0L02-0L03 section with MeV solenoids

CEBAF Source (2018 SAD) Status Installed 350kV/4.5mA PS that now sits in tunnel beside Gun2 in SF6 tank Upgraded HVPS software & PSS controls, retained capability to backout to 150kV PS Added two new M20 style BPM’s to the NEG tube just downstream of Gun2 Replaced Gun2 electrode with one including a HV shed (made beam at 180 kV), imparts large kick to the beam orbit. Operated new HVPS and gun successfully for Fall program but requires managing asymmetrical beam Electrode w/ smaller shed to reduce kick designed, fabricated and being polished. What’s next? Commission new electrode at UITF for 200kV and beam quality, install CEBAF 2019 or 2020

Critical points for the baked 200kV beamline 200 kV Gun NEG w/ BPM’s (addressed) New single gun Y-chamber 7.5deg (delivered) Repurpose Wien Filters (next slides) Prebuncher after Wiens Upgrade PSS kicker 200kV (need to help PSS group) Retain A1/A2 (drift)

Upgrade plan for the 200 kV Wien filter Wien Upgrade for 100 deg precession Beam Voltage keV 200.00 Integrated BL G-cm 3993.86 Magnet Current A 15.36 Electric Field MV/m 2.67 Electrode High Voltage kV 20.05 Modify existing 130 keV Wien filters for 200 keV operation Magnetic Field Replace 10 A coils with 20 A coils (J. Benesch, JLAB-TN-15-032) Replace 10 A trim with 20 A rack mount supplies Modify steel to accept 20 A coils Electric Field Replace 14 kV supplies with 30 kV power supplies Upgrade feedthroughs Barrel polish electrodes

Status of 200 kV Wien Filter Upgrade Prototype Wien filter installed at UITF Magnetic Field Coils fabricated but multiple iterations (shorts, tight fit), re-evaluate for final Successfully powered to 20A (15A required for 200kV requirement) New 20A supply at UITF (two more ordered for CEBAF), work fine Pair 20A PS ordered for installation at ISB Summer 2019 Electric Field Pair +/-30kV Matsusada PS at UITF w/ new software, good Safety evaluation for x-ray potential in vacuum (60 keV) HV design insufficient for 20kV (makes ~10 kV, FE), re-evaluate E-field design Additional Matsusada PS + controls arrived (staged in ISB) New racks in ISB + controls and HV swtiches at ISB by Summer 2019) Team effort needed to complete design, demonstrate reliable operation and to improve quadrupoles to round up Wien filter optics.

Testing CEBAF Upgrade Cryounit at UITF Upgrade Cryounit Commissioning at Test Lab Spring 2017 – cryostat positioned at UITF Summer 2017 – keV vacuum beam line connected Winter 2018 – application of klystron power

Segue to Chopper, Booster and Beyond Polarized Source Baked Beamline Chopper Booster Beyond How about we continue discussion in the following order ? Scope of work for the Booster section Upgrading solenoids in the chopper (extend same/similar to rest of keV region) Augmenting MeV section with LCW cooled version of solenoid, matching to NL The road before us requires an actionable plan (design, purchases, fabrications, tests) to successfully begin an installation and commissioning period in April 2020.