STAZIONE ALTA VELOCITÀ NAPOLI-AFRAGOLA

Slides:



Advertisements
Similar presentations
BPB TROPHY 2006 – PLASTER Jury Presentation Plaster.
Advertisements

CON 4003 Construction Estimating Prof R. V. Locurcio.
A Building Area: (sf) 60,000 Cost per Square Foot: $275 Construction Cost $16.5 M Date of Substantial Completion: 2009 Location of Project: University.
WINDOWS An opening especially in the wall of a building for admission of light and air that is usually closed by casements or sashes containing transparent.
Chapter 19 Electrical Plans.
Architectural Drawings
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
From Design to Construction: How to Maintain Control of Your Lighting Design Avraham M. Mor, LEED AP, IESNA, A. IALD Partner, Lightswitch Architectural.
Maintaining Structural Integrity. Structural Integrity Before we can understand how to maintain structural integrity, we need to understand how homes.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
Architectural Building Wall Sections Copyright © Texas Education Agency, All rights reserved. 1.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Finishing the Building
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Presented By: By: By: Web Address: Topic Number: Topic Number: Date: Date:
Assignment 1A Evelyn Liu Hombroich Museum, Langen Foundation, Neuss, Germany,. Architect: Tadao Ando Narrative: Architect Tadao Ando carefully.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Project Name: The Wave HouseLocation: South River, MarylandCategory: Residence Description: The owners of this waterfront residence requested a home which.
1 DESIGN PRINCIPLES ( EAGD 2201) 6- ARCHITECTURAL COMPOSITION Prepaid by:
EXPLORING THE EXAMPLES OF URBAN REGENERATION STRATEGIES
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
MECVEL SIGNS THE “SLIDING DOORS” REMAKE: SLIDING DOORS ONLY WITH OUR LINEAR ACTUATORS!
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Alvar Aalto in Rovaniemi
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
Certificate number: FS453/02 Application FS21 Firestop Panel is used to firestop mechanical and electrical services where they pass through fire rated.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Today´s Challenges of the Rail Infrastructure Industry
The Sustainable Solution
Upcoming Activities Fun Fact Click here to view the live WEBCAM
Construction Documents
EYEWEAR INC SAVANNAH PHILLIPS.
Architectural Drafting
Secure Resources – Gyproc Plasterboard
Interior Designing is the process of improvising and make excellence in interiors as well as exteriors of a given space. Interior designer can arrange.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
INTD 503- Materials Topic: ceilings
Chapter 19 Electrical Plans.
M&E SYSTEM.
Common Components of a Traditional Wood Framed Building
Austria Erste Campus Lieb Bau Weiz GmbH.
Al Dhabi For Contracting
SERBIA NATIONAL MUSEUM ALP inženjering.
Minuteman Vocational Technical Regional High School Progress
MONTENEGRO HILTON HOTEL CD inženjering.
Applied Sciences building Delft Technical University
Masonry Bearing Walls.
Minuteman Vocational Technical Regional High School Progress
PLASTERBOARD CATEGORY
PLASTERBOARD CATEGORY
BELGIUM COND’OR Batilook.
Quartier 23. Haus im Stadtpark
CANADA ST. MARY & ST. SAMUEL COPTIC ORTHODOX CHURCH Smith Brothers Contracting Corp.
HOLY NAME OF JESUS CATHEDRAL
Jaeger Ausbau GmbH + Co KG Zwickau
Austria Millennium Tower Baierl & Demmelhuber Innenausbau GmbH.
Campagnola Geom. Giorgio Costruzioni Generali srl, Verona
CANFRANC INTERNATIONAL RAILWAY STATION RESTORATION
“Intro to Blueprint Reading”
REFORMA ESTADIO EL MOLINÓN
SERBIA HUTCHINSON R inženjering.
Buildmat Sales Pvt Ltd (TTPL Interiors Projects Pvt Ltd)
Minuteman Vocational Technical Regional High School Progress
The Statement of Significance: Format and Content
ART 4600, Interior Architecture Studio V Fall Semester 2017
CENTRO DIREZIONALE VIA DELL’ARTE Coiver Contract Centro srl
Presentation transcript:

STAZIONE ALTA VELOCITÀ NAPOLI-AFRAGOLA ITALY STAZIONE ALTA VELOCITÀ NAPOLI-AFRAGOLA Sicorap srl

Project Details Building Type Building Size Project Dates Saint-Gobain High speed train station Building Size 30,000 m² Project Dates December 2016 – December 2017 Saint-Gobain Products & Systems Gyproc Wallboard Gyproc Flex 6 Gyproc Fireline Gyproc Lisaflam Gyproc Lisaplac

Contractor Company Name Main Representative Company Size Sicorap srl Main Representative Mr. Sandro Raiola Company Size 30 Specialised in Dry partitions for interiors and exteriors and any type of ceiling. Plasters and paintings.

Rete Ferroviaria Italiana SpA Building Owner Architect Contractor Innovation Partners Saint-Gobain Project Manager Rete Ferroviaria Italiana SpA Zaha Hadid Architects Sicorap srl Astaldi SpA Pasquale Cascone Pasquale Molinari

The futuristic station of Afragola (Naples), also renamed "Porta del Sud", is an important railway junction designed to speed up the connections between North and South Italy and it is conceived as a bridge crossing and connecting the high speed tracks. The station is designed as an architectural system with a sinuous and "organic" articulation - following the typical style of the Anglo-Iraqi archistar Zaha Hadid - which calls to mind the image of a running train. It consists of a soft volume made of about 350 meters in concrete, metal and glass. Sample text (high level project pitch) STRANDBADKIRCHBICHL is a visionary design project involving the construction of a new office building in a remote mountain region of Austria, with a design which reflected the crashing waves coming in from the nearby beach. Great technical skill and knowledge of interior systems was required in order to optimize lighting, acoustics and sound absorption within a very complex curved shaped structure which would not naturally provide this level of performance. This presentation will also be used on the book and on the website to present your project.

The particular shape of the station fulfills a dual function: a pedestrian tunnel connecting the various quays and an element of continuity between the railway and the surrounding landscape, able to put in close relation the two sections of territory that extend to the sides of the tracks.

The accesses to the station located at the edges of the "bridge" convey the flow of passengers to the central atrium, where the ticket office and the waiting room are located, and then direct it to the tracks on the lower floor or to the shopping center at the upper level, through a suggestive system of stairs and mobile ramps perfectly integrated into the shapes of the building.

The large skylight on the gallery and the large windows of the passenger lounge - designed according to bioclimatic criteria for direct sunlight control - testify the attention paid to natural light and the precise will of the planning to make the complex permeable and open to the outside.

In addition to fire partition walls, drywalls and ceilings have been created with standard Gyproc plasterboards and Gyproc Flex 6 slabs, specially curved to obtain the desired shapes and to recall the sinuous and «organic» pattern that characterizes all the architectural lines of the building. Gyproc Flex 6 have been screwed on specially calendered metal profiles and in some cases act as a support for an elegant white plastic coating.

Key challenges (write a max. 50 words paragraph) e.g. Budget, Time, Space, Technical challenges before and during installation/application (Development of a new solution…) Time was the worst enemy, due to the fact that the opening event was early scheduled because of the presence of the major offices of Italian politics Very high walls, with particular curved shapes. The installer had to study ad hoc structures to respect the planned project. Sample text Acoustics and light are the dominating elements in this project. The challenge was to allow maximal use of natural daylight using an unusually large funnel and integrating artificial lighting to complement natural light. The design however also had to provide an excellent level of acoustic performance in a challenging large open plan structure with high windowed ceilings. In addition to a combination of acoustics, sound absorption and light, there was particular emphasis on architecture and functionality through to the final finishing coating (Q4 surface quality) in order to meet the rigorous project standards.

Main Saint-Gobain products and systems used Fire protection / Gyproc Fireline, Lisaflam and Lisaplac – Class A1 and EI 120 Escape routes and technical rooms in particular https://www.gyproc.it/lastre-in-gesso-rivestito/lastre-speciali/lastre-antincendio Stability / Wallboard, Fireline + Metal stud – Mechanically validated wall lining Atriums and interior common spaces https://www.gyproc.it/lastre-in-gesso-rivestito/lastre-speciali/lastre-antincendio/fireline - https://www.gyproc.it/lastre-in-gesso-rivestito/lastre-standard/gyproc-wallboard Aesthetics / Gyproc Flex 6 – Particular curves https://www.gyproc.it/prodotti.php?id=25 Very short project deadline was made The whole project Key achievements?

Key achievements Explain why you succeeded in this project Close collaboration between contractor, project & structural consultant and Gyproc in studying the appropriate solutions to satisfy the design requirements, in terms of both aesthetics and performance. Sample text Project delivered to challenging budget and time schedule Discussion throughout the process with the architect to optimize each design phase. Final result combines high standards for design / aesthetics, acoustic comfort, and optimal levels of natural daylight.

STAZIONE ALTA VELOCITÀ NAPOLI-AFRAGOLA ITALY STAZIONE ALTA VELOCITÀ NAPOLI-AFRAGOLA Sicorap srl – Zaha Hadid Architects Andrea Monguidi Photography Credits: Name Surname