Hall C Beamline Upgrade

Slides:



Advertisements
Similar presentations
Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise measurement of the density -dependence.
Advertisements

Overview of the GlueX Tagger and Photon Beamline..
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
1 Electron Beam Polarimetry for EIC/eRHIC W. Lorenzon (Michigan) Introduction Polarimetry at HERA Lessons learned from HERA Polarimetry at EIC.
G2P Target installation and Beyond. Schedule Pivot before.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
Hall C Compton Polarimeter Preliminary Design by the Qweak Polarimetry Working Group S. Kowalski, M.I.T. (chair) D. Gaskell, Jefferson Lab R.T. Jones,
IPBI 6 April 05Ken Moffeit Polarimetry Design Updates - Dispersion in upstream chicane - 20mrad extraction line 0.75 mrad beam stay clear location of Synchrotron.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Full-Acceptance Detector Integration at MEIC Vasiliy Morozov for MEIC Study Group Electron Ion Collider Users Meeting, Stony Brook University June 27,
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
New Methods for Precision M ø ller Polarimetry Dave Mack Jefferson Lab ( for Dave Gaskell ) May 20, 2006 PAVI06 Precision M ø ller polarimetry Beam kicker.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
PVDIS at JLab 6 GeV Robert Michaels Jefferson Lab On Behalf of the HAPPEX Collaboration Acknowledgement: Talk prepared by Kai Pan (MIT graduate student)
1 Percent-level Polarimetry in JLab Hall C Dave Gaskell Jefferson Lab EIC14 – March 20, 2014 Outline 1.Hall C Møller Polarimeter 2.Hall C Compton Polarimeter.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
Summary of Workshop on Precision Electron Beam Polarimetry Newport News June 9-10, 2003 workshop summary by Dave Gaskell, Jefferson Lab Richard Jones,
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
Y. R. Roblin Hall A beamline and accelerator status.
Møller Polarimeter Status Update 1.Møller hardware status (detectors and targets) 2.Systematics for SANE 3.Plan Dave Gaskell SANE Collaboration Meeting.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Hall A Installation Review John J. LeRose 2/25/2009.
Extraction and beamline progress B.Goddard TE/ABT.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Moller Polarimeter Q-weak: First direct measurement of the weak charge of the proton Nuruzzaman (
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Thomas Jefferson National Accelerator Facility Page 1 IPR September 28-30, 2010 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
Hall C Compton Polarimeter Working Group Meeting Jefferson Lab August 8, Meeting agenda 2.Compton Polarimeter overview 3.Subsystem status.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy The Department.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Full-Acceptance & 2 nd Detector Region Designs V.S. Morozov on behalf of the JLEIC detector study group JLEIC Collaboration Meeting, JLab March 29-31,
AD & I : BDS Lattice Design Changes
ILC BDS Emittance Diagnostics: Design and Requirements
Hall A Infrastructure and the Moller Parity Experiment “AMPEX”
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Specifications for the JLEIC IR Magnets
Collider Ring Optics & Related Issues
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Wei Luo Lanzhou University 2011 Hall C User Meeting January 14, 2011
Update on JLEIC Interaction Region Design
Hall C Users Meeting 31 January 2009
IR Magnet Layout/Design - JLEIC
Extraction Michael Bevins May 17, 2007
Injector/Linac Design Status C. E
Vertical Dogleg Options for the Ion Collider Ring
JLEIC Engineering Status
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Presentation transcript:

Hall C Beamline Upgrade Dave Gaskell Hall C Users Meeting January 19, 2008

Beamline upgrade motivation Short term motivation for Hall C beamline upgrade is the addition of a Compton polarimeter for QWeak (1% polarimetry!) Longer term goals: 12 GeV experiments also desire Compton polarimeter (i.e. DIS Parity, 0.5% polarimetry)  Compton must be 12 GeV compatible Beamline will also require modification for 12 GeV operation Møller polarimeter as-is will only work up to 6-7 GeV Fast/slow rasters also require some upgrades for 12 GeV

Compton Chicane and Beamline Layout Constraints Compton requires insertion of 10-11 m dipole chicane Hall C Beamline must be overhauled Constraints/Requirements Fast raster must be at least 14.5 m from the Hall C pivot No quadrupoles between raster and target Polarized target chicane still useable Compton must work for QWeak (1.165 GeV) AND at 11 GeV Compton must accommodate coincidence electron+photon detection  chicane must be easily reconfigurable for 11 GeV operation (middle 2 dipoles closer to beamline)

Cartoon of Hall C Beamline Old – needs update

Beamline Features Dipoles increased from 1 m to 1.25 m to avoid high fields at 11 GeV Moller quads are part of the beamline Quadruplet before Compton chicane is used to prepare the beam for the interaction region (3C16, 3C17, 3C18, 3C19) Quadruplet after the Compton chicane used to prepare beam for target (3C20, 3C21, MQ1, MQ2) No combined optics Møller quads cannot be at “measurement” values while beam is on target Allowed combinations Compton + target Compton + Møller (high current questionable)

Beamline upgrade status Detailed design of Compton dipoles underway (Ernie Ihloff, MIT-Bates) CASA optics design concept complete Detailed layout by MEG group 95% complete (some iteration underway) To-do: Complete layout (input from physics, survey and alignment) Begin procurement of pieces and parts (MIT-Bates and JLAB) Refurbish another big quad for Møller Identify power supplies for new magnets

Dipole Design